Laserfiche WebLink
CONTRACTOR <br />SHEET DESCRIPTION: <br />SLD <br />DRAWN DATE 13.06.2024 <br />DRAWN BY EMMANUEL <br />REVIEWED BY ---- <br />REVISIONS <br />REV DESCRIPTION DATE <br />SHEET INDEX <br />UTILITY : SCE <br />PROJECT INFORMATION <br />AHJ : SANTA ANA <br />ADDRESS : 2010 E WARNER AVE, <br />SANTA ANA, CA <br />NAME : WARNER REDHILL <br />APN : 430-222-07/430-222-16 <br />SYSTEM INFORMATION: <br />(58)LITEON <br />CHARGING STATIONS <br />PROJECT INFORMATION: <br />CHARGIE TO DESIGN AND <br />INSTALL THE CHARGING <br />SYSTEM. <br />SINGLE LINE DIAGRAM I: EXISTING "PDSA" <br />EV-09 <br />PROJECT <br />INFORMATION: <br />CHARGIE WILL DESIGN <br />AND INSTALL THE <br />ENTIRE EV CHARGING <br />SYSTEM. <br />GFP <br />GFP <br />EXISTING FEEDER SCHEDULE <br /> EXISTING BONDING NETWORK <br />1"C, 1#250 KCMILS AL GROUND TO GEC SYSTEM <br />1"C, 1#250 KCMILS AL GROUND TO GEC SYSTEM <br />2010 E Warner Ave, Bldg P <br />- 101119118 & 20182681 <br />7/8/2024