Laserfiche WebLink
CONTRACTOR <br />SHEET DESCRIPTION: <br />EXHIBIT EQUIPMENT <br />MOUNTING SPEC <br />DRAWN DATE 27.06.2024 <br />DRAWN BY EMMANUEL <br />REVIEWED BY ---- <br />REVISIONS <br />REV DESCRIPTION DATE <br />SHEET INDEX <br />UTILITY : SCE <br />PROJECT INFORMATION <br />AHJ : SANTA ANA <br />ADDRESS : 2010 E WARNER AVE, <br />SANTA ANA, CA <br />NAME : WARNER REDHILL <br />APN : 430-222-07/430-222-16 <br />SYSTEM INFORMATION: <br />(58)LITEON <br />CHARGING STATIONS <br />PROJECT INFORMATION: <br />CHARGIE TO DESIGN AND <br />INSTALL THE CHARGING <br />SYSTEM. <br />EV-20 <br />EXISTING MOUNTING DETAILS. <br />*PLEASE NOTE THAT THE ACTUAL DETAILS AND INFORMATION WERE PROVIDED BY STRUCTURAL AND ELECTRICAL <br />DURING INITIAL PLAN SUBMITTAL.PLEASE REFER TO THE ATTACHED APPROVED PLANS <br />PROJECT INFORMATION: <br />CHARGIE WILL DESIGN AND INSTALL THE ENTIRE EV CHARGING SYSTEM. <br />FOR REFERENCE ONLY 2010 E Warner Ave, Bldg P <br />- 101119118 & 20182681 <br />7/8/2024