SITE PLANS-1
<br />Main Service Panel
<br />INDEX
<br />MSP
<br />Project Name:
<br />Property address:
<br />APN:
<br />03/21/2024DATE:
<br />Nhat Duong
<br />2018 W 11th St Unit #2
<br />Santa Ana, CA 92703
<br />00417320
<br />Vibe Solar
<br />Lic #: 1036012, C-10
<br />Address: 1206 Commerce Center Dr
<br />#103 Lancaster, CA 93534
<br />Phone number: (661) 485-5000
<br />E-mail: xiomara@vibesolar.com
<br />CONTRACTOR
<br />AC DisconnectACD
<br />Enphase Combiner BoxECB
<br />1.In the case of emergency, call_____________________at Work Phone
<br />#__________________or Home Phone #___________________. 2. Sediment
<br />from areas disturbed by construction shall be retained on site using structural
<br />controls to the maximum extent practicable. 3. Stockpiles of soil shall be
<br />properly contained to minimize sediment transport from the site to streets,
<br />drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. 4.
<br />Appropriate BMP's for construction-related materials, wastes, spills shall be
<br />implemented to minimize transport from the site to streets, drainage facilities,
<br />or adjoining properties by wind or runoff. 5. Runoff from equipment and
<br />vehicle washing shall be contained at construction sites unless treated to
<br />reduce or remove sediment and other pollutants.6. All construction contractor
<br />and subcontractor personnel are to be made aware or the required best
<br />management practices and good housekeeping measures for the project site
<br />and any associated constructionstaging areas. 7. At the end of each day of
<br />construction activity all construction debris and waste materials shall be
<br />collected and properly disposed in trash or recycle bins. 8. Construction sites
<br />shall be maintained in such a condition that an anticipated storm does not
<br />carry wastes or pollutants off the site. Discharges of material other than
<br />stormwater only when necessary forperformance andcompletion of
<br />construction practices and where they do not: cause or contribute to a
<br />violation of any water quality standard; cause or threaten to cause pollution,
<br />contamination, or nuisance; or contain a hazardoussubstance ina quantity
<br />reportable under Federal Regulations 40 CFR Parts 117 and 302. 9. Potential
<br />pollutants include but are not limited to: solid or liquid chemical spills; wastes
<br />from paints, stains, sealants, glues, limes, pesticides, herbicides, wood
<br />preservatives and solvents; asbestos fibers, paintflakesor stucco fragments;
<br />fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers,
<br />vehicle/equipment wash water and concrete wash water; concrete, detergent
<br />or floatable wastes; wastes from anyengine/equipment steam cleaning or
<br />chemical degreasing and superchlorinated potable water line flushing. During
<br />construction, permittee shall dispose of such materials in a specified and
<br />controlled temporaryarea on -site, physically separated from potential
<br />stormwater runoff, with ultimate disposal in accordance with local, state and
<br />federal requirements. 10. Dewatering of contaminated groundwater, or
<br />discharging contaminated soils via surface erosion is prohibited. Dewatering
<br />of non-contaminated groundwater requires a National Pollutant Discharge
<br />EliminationSystem Permit from the respective State Regional Water Quality
<br />Control Board. 11. Graded areas on the permitted area perimeter must drain
<br />away from the face of slopes at the conclusion of each working day. Drainage
<br />is to be directed toward desilting facilities. 12. The permittee and contractor
<br />shall be responsible and shall take necessary precautions to prevent public
<br />trespass onto areas where impounded water creates a hazardous condition.
<br />13. The permittee and contractor shall inspect the erosion control work and
<br />insure that the work is in accordance with the approved plans. 14. The
<br />permittee shall notify all general contractors, subcontractors, material
<br />suppliers, lessees, and property owners: that dumping of chemicals into the
<br />storm drain system or the watershed is prohibited. 15. Equipment and workers
<br />for emergency work shall be made available at all times during the rainy
<br />season. Necessary materials shall be available on site and stockpiled at
<br />convenient locations to facilitate rapidconstruction of temporary devices when
<br />rain is imminent. 16. All removable erosion protective devices shall be in place
<br />at the end of each working day when the 5-Day Rain Probability Forecast
<br />exceeds 40%. 17.Sediments from areas disturbed by construction shall
<br />beretained on site using an effective combination of erosion and sediment
<br />controls to the maximum extent practicable, and stockpiles of soil shall be
<br />properly containted to minimize sediment transport from the site tostreets,
<br />drainage facilities of adjacent properties via runoff,vehicle tracking, or wind.
<br />18. Appropriate BMPs for construction-related materials, wastes, spills or
<br />residues shall be implemented and retained on site to minimize transport from
<br />the site to streets, drainage facilities, or adjoining property bywind or runoff
<br />112'
<br />59'
<br />112'
<br />59'
<br />95'-11"
<br />24'-5"20'
<br />6'
<br />MSP
<br />ACD
<br />ECB
<br />AC UNIT AC UNIT
<br />PROPERTY LINE
<br /> W 11th St
<br />MAIN HOUSE
<br />ADU
<br />Driveway
<br />SCALE:1/16" = 1'-0"
<br />S
<br /> 180 °
<br />E
<br /> 90 °
<br />W
<br /> 270 °
<br />N
<br />0°
<br />Date Certified and
<br />Exp. Date : 3/31/2026
<br />Signed:03/29/2024
<br />Professional Certification. I hereby certify that these documents
<br />were prepared or approved by me, and that I am a duly licensed
<br />professional engineer under the laws of the State of California.
<br />License No. ____________, Expiration Date: _______________88083 03/31/2026
<br />Engineerinc.io,
<br />303 N Glenoaks Blvd
<br />Burbank, CA 91502
<br />(310) 928-0938
<br />Professional Certification. I hereby certify that these documentswere prepared or approved by me, and that I am a duly licensedprofessional engineer under the laws of the State of California.License No. ____________, Expiration Date: _______________8808303/31/2026Engineerinc.io,303 N Glenoaks BlvdBurbank, CA 91502(310) 928-0938
<br />2018 W Eleventh St Unit# 2-
<br />101118849 & 20182506
<br />4/11/2024
|