My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1895 & 1995 S Standard Ave - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Standard Ave
>
1895 S Standard Ave
>
1895 & 1995 S Standard Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:22:38 AM
Creation date
6/6/2025 7:22:21 AM
Metadata
Fields
Template:
Plan
Permit Number
20184604
20184605
101121774
101121775
Full Address
1895 S Standard Ave
1995 S Standard Ave
Text box
ID:
1
Creator:
Import Agent
Created:
6/6/2025 7:22 AM
Modified:
6/4/2025 1:49 PM
Text:
11.07.2024
ID:
2
Creator:
Import Agent
Created:
6/6/2025 7:22 AM
Modified:
6/4/2025 1:49 PM
Text:
http://www.vincise.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES PROJECT SCOPE:DRAWING INDEXPERMITTING / PLANNING NOTES: <br />ADDRESS MAP AERIAL PHOTO: <br />PROJECT TEAM: <br />CONTRACTOR: <br />THIS DOCUMENT CONTAINS PROPRIETARY <br />INFORMATION. REPRODUCTION, DISCLOSURE, OR <br />USE WITHOUT SPECIFIC WRITTEN <br />AUTHORIZATION OF CONTRACTOR <br />IS STRICTLY FORBIDDEN. <br />DA <br />T <br />E <br />: <br /> <br />1. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE 2022 TITLE 24 OF THE <br />CALIFORNIA BUILDING CODE, CMC,CPC. CEC AND ALL APPLICABLE LOCAL CODES, <br />ORDINANCES, AND STATE AMENDMENTS. <br />2. THE CONTRACTOR SHALL CHECK ALL DRAWINGS IMMEDIATELY UPON THEIR RECEIPT <br />AND SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING WORK. <br />ALL ARCHITECTS AND ENGINEERS SHALL BE NOTIFIED OF ANY DISCREPANCIES. <br />3. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY <br />SHOWN, NOTED, OR APPROVED BY ALL. NOTCH DETAILS, IF PROVIDED ARE FOR <br />GENERAL GUIDANCE ONLY. ALL SHALL BE CONTACTED TO APPROVE LOCATIONS OF <br />PROPOSED NOTCHES. <br />4. CONNECTIONS AND IMPLIED CONSTRUCTION ASSEMBLIES THAT ARE NOT SPECIFICALLY <br />DESCRIBED OR DETAILED SHALL BE CONSTRUCTED USING STANDARD CONSTRUCTION <br />PRACTICES IN COMPLIANCE WITH THE GOVERNING CODES AND ORDINANCES. <br />5. WHEN DETAILS LABELED "TYPICAL OR "SIMILAR" ARE GIVEN ON DRAWINGS, THE <br />CONTRACTOR SHALL APPLY THE INTENT OF THE DETAIL TO THAT SPECIFIC CONDITION. <br />6. WRITTEN INFORMATION AND DIMENSIONS SHALL HAVE PRECEDENCE OVER GRAPHIC <br />INFORMATION. DO NOT SCALE. <br />7. DRAWINGS AND SPECIFICATIONS FOR THIS WORK HAVE BEEN PREPARED IN <br />ACCORDANCE WITH GENERALLY ACCEPTED STANDARDS OF PRACTICE TO MEET THE <br />MINIMUM REQUIREMENTS DF THE CURRENT EDITION DF THE CBC. ANY DISCREPANCIES <br />ON THE PLANS OR ANY DE\/IATIONS FROM THE PLANS WHICH ARE NECESSITATED BY <br />FIELD CONDITIONS OR ANY CONDITION DIFFERENT FROM THOSE INDICATED ON THE <br />PLANS SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER. ALL WORK IS TO BE <br />COORDINATED SO THAT COOPERATION BETWEEN THE TRADES WHERE REQUIRED IS <br />ACCOMPLISHED. <br />8. CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR THE ORDER AND <br />MEANS DF CONSTRUCTION AND ALL TEMPORARY BRACING AND ERECTION DURING <br />CONSTRUCTION. <br />9. APPROVALS BY BUILDING INSPECTORS SHALL NOT CONSTITUTE AUTHORITY TO <br />DEVIATE FROM THE PLANS AND SPECIFICATIONS <br />1O. ALL WORK SHALL CONFORM TO TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR) <br />11. GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS REQUIREMENTS AND <br />ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL LOCAL <br />ORDINANCES. <br />X_____________________________ <br />VICINITY MAP: <br />PROPERTY OWNER: <br />PROLOGIS, L.P. <br />1800 WAZEE ST, SUITE 500 <br />DENVER, CO 80202 <br />SKYBRIDGE <br />RENEWABLES LLC <br />THIS INSTALLATION CONSISTS OF ROOF MOUNTED PHOTOVOLTAIC (PV) <br />SYSTEM. THE PV SYSTEM IS STATIC MOUNTED. <br />THIS SYSTEM WILL BE INTERCONNECTED TO AND WILL BE OPERATED IN <br />PARALLEL WITH THE ELECTRIC GRID PER THE REQUIREMENTS OF THE <br />NATIONAL ELECTRICAL CODE AND UTILITY INTERCONNECT AGREEMENT <br />1. THIS PV SYSTEM INSTALLATION IS SUBJECT TO INSPECTION BY THE AUTHORITY <br />HAVING JURISDICTION <br />2. THIS PROJECT SHALL CONFORM TO THE FOLLOWING CODE VERSIONS: <br />2022 CALIFORNIA BUILDING CODE (CBC 2022) <br />2022 CALIFORNIA ELECTRIC CODE (CEC 2022) <br />2022 CALIFORNIA FIRE CODE (CFC 2022) <br />2022 CALIFORNIA ENERGY CODE (CEnC 2022) <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSG 2022) <br />2022 CALIFORNIA PLUMBING CODE (CPC 2022) <br />2022 CALIFORNIA MECHANICAL CODE (CMC 2022) <br />AUTHORITY HAVING JURISDICTION <br />3. PV SYSTEM MEETS FIRE CLASSIFICATION PER CBC 1505.9 CLASS "A". PV SYSTEM AND <br />ASSOCIATED RACKING SYSTEM ARE LISTED AND IDENTIFIED WITH FIRE <br />CLASSIFICATION IN ACCORDANCE WITH UL 1703 & UL 2703. <br />4. SYSTEM UTILIZES SOLAREDGE INVERTERS AND OPTIMIZERS WHICH MEET 690.12 <br />MODULE LEVEL RAPID SHUTDOWN REQUIREMENTS. <br />5. 110.2 APPROVAL: ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR <br />CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE <br />UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION. <br />6. THE OUTPUT CHARACTERISTICS OF THE PV SYSTEM SHALL BE COMPATIBLE WITH <br />THE VOLTAGE, WAVE SHAPE, AND FREQUENCY OF THAT OF THE UTILITY OUTPUT. <br />705.14. <br />7. INTERCONNECTED ELECTRIC POWER PRODUCTION SOURCES SHALL BE GROUNDED <br />IN ACCORDANCE WITH ARTICLE 250. 705.50. <br />127 MAYFAIR ALISO VIEJO, <br />CA 92656 <br />TEL: (949) 424-9320 <br />1 <br />1 <br />/ <br />6 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />1 <br />0 <br />: <br />4 <br />8 <br />: <br />0 <br />8 <br /> <br />A <br />M <br />Ut <br />i <br />l <br />i <br />t <br />y <br /> <br />C <br />u <br />s <br />t <br />o <br />m <br />e <br />r <br /> <br />N <br />a <br />m <br />e <br />: <br /> <br />P <br />r <br />o <br />l <br />o <br />g <br />i <br />s <br /> <br />L <br />o <br />g <br />i <br />s <br />t <br />i <br />c <br /> <br />S <br />e <br />r <br />v <br /> <br />I <br />n <br />c <br /> <br /> <br />- <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br /> <br />D <br />i <br />s <br />t <br />r <br />i <br />b <br />u <br />t <br />i <br />o <br />n <br /> <br />C <br />e <br />n <br />t <br />e <br />r <br /> <br />1 <br />1 <br />9 <br />9 <br />5 <br /> <br />S <br /> <br />S <br />t <br />a <br />n <br />d <br />a <br />r <br />d <br /> <br />A <br />v <br />e <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br /> <br />& <br /> <br />1 <br />8 <br />9 <br />5 <br />S <br />S <br />t <br />a <br />n <br />d <br />a <br />r <br />d <br /> <br />A <br />v <br />e <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />Utility Customer Name: Prologis Logistic Serv Inc - Santa Ana Distribution Center 1 <br />1995 S Standard Ave Santa Ana, CA 92707 & 1895 S Standard Ave Santa Ana, CA 92707 <br />SKYBRIDGE RENEWABLES LLC <br />127 MAYFAIR <br />ALISO VIEJO, CA 92656 <br />TEL: (949) 424-9230 <br />LIC # C10 - 1112028 PV-1 <br />Ti <br />t <br />l <br />e <br /> <br />S <br />h <br />e <br />e <br />t <br />SKYBRIDGE RENEWABLES LLC <br />C10 -1112028 <br />10/31/2025 <br />SOLAR ELECTRIC SYSTEM <br />THIS PROJECT ENTAILS THE INSTALLATION OF A PHOTOVOLTAIC SYSTEM AT <br />Utility Customer Name: Prologis Logistic Serv Inc - Santa Ana Distribution Center <br />1 THE SYSTEM WILL NOT BE A NET ELECTRICITY EXPORTER TO THE UTILITY <br />GRID. <br />SOLAR ELECTRIC SYSTEM PROJECT - 634.865kW DC STC RATING / 585.445kW AC CEC RATING <br />Sheet # Sheet Name <br />PV-1 Title Sheet <br />PV-2 Notes <br />PV-3 Site Overview <br />PV-4 Array Layout <br />PV-5 (E) Roof Plan <br />PV-6 Structural Details <br />PV-7 Wiring Layout <br />PV-8 Wiring Layout <br />PV-9.1 Single Line Diagram System 1 <br />PV-9.2 Single Line Diagram System 2 <br />PV-10 Spec Sheets <br />PV-11 Spec Sheets <br />PV-12 Spec Sheets <br />PV-13 Spec Sheets <br />PC-1 Cover Sheet <br />PC-2 Project Summary <br />PC-3 Array Site Map <br />PC-4 Typical Array Dimensions <br />PC-5 Assemblies <br />PC-6 Racking Components <br />PC-7 Ballast Legend <br />PC-8 Ballast Layout 1.1 <br />PC-9 Ballast Layout 1.2 <br />PC-10 Ballast Layout 1.3 <br />PC-11 Ballast Layout 1.4 <br />PC-12 Mechanical Attachment Detail <br />PROJECT TOTAL <br />TOTAL SYSTEM SIZE: <br />634.865 kW DCstc, <br />480.000 kW AC INVERTER CAPACITY, <br />585.758 kW ACcec <br />INTERCONNECTION 1 SYSTEM SIZE: <br />425.345 kW DCstc, <br />320.000 kW AC INVERTER CAPACITY, <br />392.445 kW ACcec <br />INTERCONNECTION 2 SYSTEM SIZE: <br />209.52 kW DCstc, <br />160.000 kW AC INVERTER CAPACITY, <br />193.313 kW ACcec <br />INTERCONNECTION 1: <br />PANEL SPECS: <br />(877) HANWHA Q CELLS, Q.PEAK DUO XL-G10.3/BFG 485 <br />INVERTER SPECS: <br />(2) SOLAREDGE TECHNOLOGIES, SE120KUS [480V] <br />(1) SOLAREDGE TECHNOLOGIES, SE80KUS [480V] <br />OPTIMIZER / RAPID SHUTDOWN SPECS: <br />(440) SOLAREDGE PER P1101 OPTIMIZER <br />Parcel #: 1021132040000 <br />PROJECT LOCATION <br />PROJECT LOCATION <br />ARRAY LOCATION <br />INTERCONNECTION 2: <br />PANEL SPECS: <br />(432) HANWHA Q CELLS, Q.PEAK DUO XL-G10.3/BFG 485 <br />INVERTER SPECS: <br />(2) SOLAREDGE TECHNOLOGIES, SE80KUS [480V] <br />OPTIMIZER / RAPID SHUTDOWN SPECS: <br />(216) SOLAREDGE PER P1101 OPTIMIZER <br />No <br />. <br /> <br />De <br />sc <br />ri <br />pt <br />ion <br /> <br />Da <br />t <br />e <br />Bldg #101121774-75 <br />Elect #20184604-05 <br /> <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - T. Le <br />PUBLIC WORKS - Y. Soto <br />ELECT - M. Smith <br />1895 & 1995 S Standard <br />Ave1/7/2025
The URL can be used to link to this page
Your browser does not support the video tag.