My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1895 & 1995 S Standard Ave - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Standard Ave
>
1895 S Standard Ave
>
1895 & 1995 S Standard Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:22:38 AM
Creation date
6/6/2025 7:22:21 AM
Metadata
Fields
Template:
Plan
Permit Number
20184604
20184605
101121774
101121775
Full Address
1895 S Standard Ave
1995 S Standard Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE:V I N C I & A S S O C I A T E S SHEET: <br />PROJECT:Santa Ana Distribution Center 1 Structural Engineers JOB NO.:22-3457 <br />1995 S Standard Ave & 1895 S Standard Ave175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV <br />Santa Ana, CA 805.496.2100 • VinciSE.com <br />CLIENT:Axis Solar <br />CHECK IMPACT OF NEW SOLAR PANELS ON SEISMIC LOAD <br />ADD ROOF PLAN <br />HERE <br />TOTAL ROOF AREA: <br />(1000.0 ft x 280 ft ) + (0.0 ft x 0.0 ft ) + <br />(0.0 ft x 0.0 ft ) + (0.0 ft x 0.0 ft ) = <br />EXISTING ESTIMATED SEISMIC LOAD (BASE SHEAR) <br />280000 ft2 x 3.70 psf =1035091 lbs <br />AREA OF ADDED SOLAR PANELS (PER PAGE 1)=ft2 <br />WEIGHT OF PANELS:2.85 psf <br />ADDED SEISMIC LOAD: <br />2.85 psf x ft2 x 0.20 =24936.0 lbs <br />Therefore O.K. <br />Per CEBC SECTION 503.4 <br />5/14/2024 <br />- <br />280000 ft2 <br />42856.0 <br />42856.0 <br />=2.4%<10%% INCREASE =24936.0 <br />1035091.2 <br />1895 & 1995 S Standard <br />Ave1/7/2025
The URL can be used to link to this page
Your browser does not support the video tag.