My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1895 & 1995 S Standard Ave - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Standard Ave
>
1895 S Standard Ave
>
1895 & 1995 S Standard Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:22:38 AM
Creation date
6/6/2025 7:22:21 AM
Metadata
Fields
Template:
Plan
Permit Number
20184604
20184605
101121774
101121775
Full Address
1895 S Standard Ave
1995 S Standard Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE:V I N C I & A S S O C I A T E S SHEET: <br />PROJECT:Santa Ana Distribution Center 1 Structural Engineers JOB NO.:22-3457 <br />1995 S Standard Ave & 1895 S Standard Ave175 E. WILBUR ROAD, STE 103 • THOUSAND OAKS, CA 91360 ENGR.:JRV <br />Santa Ana, CA 805.496.2100 • VinciSE.com <br />CLIENT:Axis Solar <br />CHECK OF EXISTING ROOF STRUCTURE <br />Existing Roof Dead Load 11.25 psf <br />Existing Roof Live Load:20 psf reducable <br />PV Array Dead Load 2.85 psf <br />Per 2022 California Building Code Section 1607.14.4.1 <br />when a PV array is installed less than 24" above the surface of the roof <br />surface, the live load can be ignored below the PV array. <br />Therefore - if the 20 psf (12psf min when reduced) is eliminated below <br />the proposed PV Arrays, the roof is more than capable of supporting <br />the additional 2.85 psf dead load due to the proposed array. <br />Therefore, by observation, the existing roof structure is sufficient. <br />5/14/2024 1895 & 1995 S Standard <br />Ave1/7/2025
The URL can be used to link to this page
Your browser does not support the video tag.