My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2130 E 4th St - REV 1 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fourth St
>
2130 E Fourth St
>
2130 E 4th St - REV 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 3:31:24 AM
Creation date
6/6/2025 7:22:22 AM
Metadata
Fields
Template:
Plan
Permit Number
20183018
30147360
40139177
101119571
Full Address
2130 E Fourth St
Street Number
2130
Street Direction
E
Street Name
Fourth
Street Suffix
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EARTH STRATA GEOTECHNICAL SERVICES 20 March 30, 2023 Project Number 234812-10A <br /> <br />CONCRETE FLATWORK <br />Thickness and Joint Spacing Concrete sidewalks and patio type slabs should be at least 4 inches thick and provided with construction or expansion joints every 6 feet or less, to reduce the potential for excessive cracking. Concrete driveway slabs should be at least 4 inches thick and provided with construction or expansion joints every 10 feet or less. <br />Subgrade Preparation In order to reduce the potential for unsightly cracking, subgrade earth materials underlying concrete flatwork should be compacted at near optimum moisture to a minimum of 90 percent of the maximum dry density determined by ASTM D 1557 and then moistened to optimum or slightly above optimum moisture content. This moisture should extend to a depth of 12 inches below subgrade and be maintained prior to placement of concrete. Pre-watering of the earth materials prior to placing concrete will promote uniform curing of the concrete and minimize the development of shrinkage cracks. The project geotechnical engineer or his representative should verify the density and moisture content of the earth materials and the depth of moisture penetration prior to placing concrete. Cracking within concrete flatwork is often a result of factors such as the use of too high a water to cement ratio and/or inadequate steps taken to prevent moisture loss during the curing of the concrete. Concrete distress can be reduced by proper concrete mix design and proper placement and curing of the concrete. Minor cracking within concrete flatwork is normal and should be expected. <br />GRADING PLAN REVIEW AND CONSTRUCTION SERVICES This report has been prepared for the exclusive use of Olive Crest and their authorized representative. It likely does not contain sufficient information for other parties or other uses. Earth Strata Geotechnical Services should be engaged to review the final design plans and specifications prior to construction. This is to verify that the recommendations contained in this report have been properly incorporated into the project plans and specifications. Should Earth Strata Geotechnical Services not be accorded the opportunity to review the project plans and specifications, we are not responsibility for misinterpretation of our recommendations. We recommend that Earth Strata Geotechnical Services be retained to provide geologic and geotechnical engineering services during grading and foundation excavation phases of the work. In order to allow for design changes in the event that the subsurface conditions differ from those anticipated prior to construction. Earth Strata Geotechnical Services should review any changes in the project and modify and approve in writing the conclusions and recommendations of this report. This report and the drawings contained within are intended for design input purposes only and are not intended to act as construction drawings or specifications. In the event that conditions encountered during grading or construction operations <br />2130 E 4th St <br />2/11/2025
The URL can be used to link to this page
Your browser does not support the video tag.