The Earthwork Contractor:  The Earthwork Contractor (Contractor) shall be  <br />qualified, experienced, and knowledgeable in earthwork logistics, preparation  <br />and  processing  of  earth  materials  to  receive  compacted  fill,  moisture‐ <br />conditioning and processing of fill, and compacting fill.  The Contractor shall be  <br />provided with the approved grading plans and geotechnical report(s) for his  <br />review and acceptance of responsibilities, prior to commencement of grading.   <br />The  Contractor  shall  be  solely  responsible  for  performing  the  grading  in  <br />accordance with the approved grading plans and geotechnical report(s).  Prior  <br />to commencement of grading, the Contractor shall prepare and submit to the  <br />Owner  and  the  Geotechnical  Consultant  a  work  plan  that  indicates  the  <br />sequence of earthwork grading, the number of “equipment” of work and the  <br />estimated  quantities  of  daily  earthwork  contemplated  for  the  site.    The  <br />Contractor shall inform the Owner and the Geotechnical Consultant of work  <br />schedule changes and revisions to the work plan at least 24 hours in advance  <br />of such changes so that appropriate personnel will be available for observation  <br />and testing.  No assumptions shall be made by the Contractor wi th regard to  <br />whether the Geotechnical Consultant is aware of all grading operations.  <br />It is the sole responsibility of the Contractor to provide adequate equipment  <br />and methods to accomplish the earthwork operations in accordance with the  <br />applicable grading codes and agency ordinances, these specifications, and the  <br />recommendations in the approved geotechnical report(s) and grading plan(s).   <br />At  the  sole  discretion  of  the  Geotechnical  Consultant,  any  unsatisfactory  <br />conditions,  such  as  unsuitable  earth  materials,  improper  moisture  <br />conditioning,  inadequate  compaction,  insufficient  buttress  keyway  size,  <br />adverse  weather  conditions,  etc.,  resulting  in  a  quality  of  work  less  than  <br />required  in  the  approved  grading  plans  and  geotechnical  report(s),  the  <br />Geotechnical  Consultant  shall  reject  the  work  and  may  recommend  to  the  <br />Owner that grading be stopped until conditions are corrected.   <br />Preparation of Areas for Compacted Fill  <br />Clearing and Grubbing:  Vegetation, such as brush, grass, roots, and other  <br />deleterious material shall be sufficiently removed and properly disposed in a  <br />method  acceptable  to  the  Owner,  Geotechnical  Consultant,  and  governing  <br />agencies.  <br />The Geotechnical Consultant shall evaluate the extent of these removals on a  <br />site  by  site  basis.    Earth  materials  to  be  placed  as  compacted fill  shall  not  <br />contain more than 1 percent organic materials (by volume).  No compacted fill  <br />lift shall contain more than 10 percent organic matter.    <br />Should potentially hazardous materials be encountered, the Contractor shall  <br />stop  work  in  the  affected  area,  and  a  hazardous  materials  specialist  shall  <br />immediately  be  consulted  to  evaluate  the  potentially  hazardous materials,  <br />prior to continuing to work in that area.  <br />2130 E 4th St <br />2/11/2025