Laserfiche WebLink
48 <br />10 <br />12 <br />11 <br />14 <br />1 <br />13 <br />16 <br />6 <br />37 <br />9 <br />TYPICAL REINFORCING WELDING <br />TYP. REBAR, HOOK, BENT AND LAP SPLICE <br />2 <br />5 <br />CONCRETE SLAB EDGE <br />DETAIL <br />POUR-IN-PLACE RAMP DETAIL <br /> CONTROL JOINT DETAIL <br />POUR-IN-PLACE RAMP DETAIL <br />CONC. SLAB EDGE AT RAMP <br />NEW TO EXISTING SLAB <br />EXISTING FTG. TO NEW FTG. CONNECTION <br />POUR-IN-PLACE CONCRETE WALL <br />15POST TO CONC. SLAB <br />FLAG POLE DETAIL <br />FOOTING DETAILS <br />CONSULTING STRUCTURAL ENGINEERS <br />301 N. Lake Ave., 5th Floor <br />Tel: (626) 521-9931 <br />Pasadena, CA. 91101 <br />HSA PROJECT NO. : 23-098 <br />Drawn by: T.T. <br />HSA ISSUE:SUBMITTAL X <br />S 5092 <br />STRU C TURAL <br />R <br />E <br />GISTEREDPROF E SSIONALENGINEE <br />R <br />STATE OF CA LIFORNIA <br />EXP.06-30-25 <br />Oct. 18, 2024 <br />RAFIK R.W .GERGES <br />SD-1.0 <br />CLIENT: <br />SUBMITTAL <br />al <br />l <br /> <br />i <br />d <br />e <br />a <br />s <br />, <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />s <br /> <br />a <br />n <br />d <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />r <br />e <br />p <br />r <br />e <br />s <br />e <br />n <br />t <br />e <br />d <br /> <br />b <br />y <br /> <br />t <br />h <br />i <br />s <br /> <br />d <br />r <br />a <br />w <br />i <br />n <br />g <br /> <br />a <br />r <br />e <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />c <br />l <br />u <br />s <br />i <br />v <br />e <br /> <br />p <br />r <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />o <br />f <br /> <br />w <br />i <br />t <br />h <br />e <br />e <br /> <br />m <br />a <br />l <br />c <br />o <br />l <br />m <br /> <br />a <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />s <br />, <br /> <br />l <br />l <br />p <br /> <br />a <br />n <br />d <br /> <br />s <br />h <br />a <br />l <br />l <br /> <br />n <br />o <br />t <br /> <br />b <br />e <br /> <br />r <br />e <br />p <br />r <br />o <br />d <br />u <br />c <br />e <br />d <br /> <br />i <br />n <br /> <br />w <br />h <br />o <br />l <br />e <br /> <br />o <br />r <br /> <br />i <br />n <br /> <br />p <br />a <br />r <br />t <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />p <br />r <br />e <br />s <br />s <br /> <br />p <br />r <br />i <br />o <br />r <br /> <br />w <br />r <br />i <br />t <br />t <br />e <br />n <br /> <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />o <br />f <br /> <br />s <br />a <br />i <br />d <br /> <br />a <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />s <br />, <br /> <br />a <br />n <br />y <br /> <br />u <br />n <br />a <br />u <br />t <br />h <br />o <br />r <br />i <br />z <br />e <br />d <br /> <br />r <br />e <br />u <br />s <br />e <br /> <br />o <br />f <br /> <br />t <br />h <br />e <br />s <br />e <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />o <br />t <br />h <br />e <br />r <br /> <br />t <br />h <br />a <br />n <br /> <br />f <br />o <br />r <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />a <br />n <br />d <br /> <br />l <br />o <br />c <br />a <br />t <br />i <br />o <br />n <br /> <br />s <br />h <br />o <br />w <br />n <br /> <br />i <br />s <br /> <br />p <br />r <br />o <br />h <br />i <br />b <br />i <br />t <br />e <br />d <br />. <br />JOB NO. <br />DATEREVISION <br />SHEET TITLE <br />SHEET NO. <br />07.17.2023PROGRESS SET <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />21 <br />3 <br />0 <br /> <br />E <br />. <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br />. <br /> <br /># <br />2 <br />0 <br />0 <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br /> <br />- <br /> <br />O <br />F <br />F <br />I <br />C <br />E <br /> <br />T <br />I <br />CM220584.00 <br />21 <br />3 <br />0 <br /> <br />E <br />. <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />CL <br />I <br />E <br />N <br />T <br />: <br />PR <br />O <br />J <br />E <br />C <br />T <br />: <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br />08.08.2023PLANNING SUBMITTAL <br />1ST PC SUBMITTAL - BUILDING 02.08.2024 <br />PROGRESS SET 06.14.2024 <br />08-15-24PLAN CHECK RESUBMITTAL <br />10-17-242ND PLAN CHECK RESUBMITTALB <br />A <br />2130 E 4th St <br />2/11/2025