<br />
<br />YES NO
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />INSTRUCTIONS:
<br />ORAN GE COUNTY FI RE AUTHORI TY
<br />Plan Submittal Criteria
<br />COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects
<br />and RESIDENTIAL TRACT developments
<br />· Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place.
<br />· Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section.
<br />· If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA.
<br />· In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations.
<br />· Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding
<br />requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602.
<br />
<br />Address Suite City
<br />Project Scope/Business Description
<br />
<br />1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways,
<br />curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within
<br />300 feet of an active or proposed oil well? Fire Master Plan (PR145)
<br />2. Property is adjacent to a wildland area or non-irrigated native vegetation?
<br />Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124)
<br />3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from
<br />an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170)
<br />4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving
<br />private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475)
<br />5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000
<br />sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable
<br />to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless
<br />classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration
<br />or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses
<br />where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories
<br />with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285)
<br />6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card,
<br />button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan
<br />depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)
<br />7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment;
<br />industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible
<br />liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium
<br />ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?
<br />Special Equipment Plan (PR315, PR340-PR382)
<br />8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft
<br />maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if
<br />H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240)
<br />9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard
<br />commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330)
<br />10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a
<br />commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335)
<br />Initial each of the following two items indicating that you have read and understand the statement:
<br />11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is
<br />required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed
<br />Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications.
<br />12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located
<br />in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327—
<br />Initials the building department will determine specific requirements.
<br />I certify under penalty of perjury under the laws of the State of California that the above is true:
<br />
<br />Print Name Signature
<br />Phone Number ( ) Date / /
<br />Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA
<br />review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the
<br />applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the
<br />appropriate plans and fees for OCFA review. 10-08-14 EE
<br />COM
<br />EverCharge will pull wire from Jbox to panel. Approx 150' + 20' to EVSE - EV Panel is a 400A. Will support all (10) EVSE's 120/208v - Installation of (10) EV02 (Sharing circuits, & Load Managed) - On Level 1 in Parking structure; (10) EVSE's
<br />will be mounted on existing walls, & Pillars. - Installation of (1) 1"" raceway Approx 20' (From Jbox to EVSE); (2) #4, & (1) #10 AWG. ** All wire, and breakers are provided by Evercharge. - Bollards will be installed as per city ordinance.
<br />MM
<br />MM
<br />HOLD- 401 N Main
<br />St9/30/2024
|