Laserfiche WebLink
SolarCo Energy Inc. <br />08/01/2024 <br />Medtronic, Inc (REVJ) <br />1851 E Deere Ave, Santa Ana, CA 92705, USA <br />Plan revisions done after REV C (Approved Plans) noted below. <br />1.The POI location has been changed from the pull section to between the Meter and Main <br />Board. <br />The change can be seen in the ELD page (PV-4). <br />(The page numbering changed a bit, PV-4 in Rev C is now PV-4A in REV J and PV-4A in <br />REV C is now PV-4 in REV J. <br />2.The neutral line from the inverter has been removed, it was optional. The wire schedule has <br />been updated as well. <br />Changes can be seen in PV-4A and PV-4B. <br />3.A page has been inserted, PV-3B. That page has the tap details. <br />4.The Production meter has been removed. Change can be seen in PV-4A and PV-4B. <br />5.The location of the ACD has Solar Load Center has been changed. <br />6. The Fault Current Calculations have been added to the plans, see PV-11. <br />1851 E Deere Ave <br />11/13/2024