My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1851 E Deere Ave - Plan
PBA
>
Building
>
ProjectDox
>
D
>
Deere Ave
>
1851 E Deere Ave
>
1851 E Deere Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 7:22:38 AM
Creation date
6/6/2025 7:22:24 AM
Metadata
Fields
Template:
Plan
Permit Number
20182282
20183792
101118504
Full Address
1851 E Deere Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />ARCH FULL <br />24" X 36" <br />Signature with Seal <br />PROJECT NAME & ADDRESS <br />PV-0 <br />DATE: 02/23/2024 <br />REVDATEDESCRIPTION <br />REVISIONS <br />BLEED D <br />18 <br />5 <br />1 <br /> E <br />D <br />E <br />E <br />R <br />E <br /> <br />A <br />V <br />E <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />CA <br /> 92 <br />7 <br />0 <br />5 <br />ME <br />D <br />T <br />R <br />O <br />N <br />I <br />C <br />, <br /> <br />I <br />N <br />C <br />CO <br />M <br />M <br />E <br />R <br />C <br />I <br />A <br />L <br />REVISION 02/20/2024 A <br />SolarCo Energy Inc. <br /> 22982 La Cadena Dr #219, <br /> Laguna Hills, CA 92653 <br /> Lic#: 1001001 <br />PH. NO.: (949) 482 2232 <br /> permits@SolarCoEnergy.com <br />REVISION 02/23/2024 B <br />COVER PAGE <br />1 <br />2 <br />BUILDING PHOTO <br />VICINITY MAP SCALE: NTS <br />PV-0 <br />PV-0 <br />SCALE: NTS <br />PROJECT SITE <br />SCOPE OF WORK: <br />TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM <br />LOCATED AT 1851 E DEERE AVE, SANTA ANA, CA 92705, USA. <br />THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH <br />THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. <br />THE PV SYSTEM DOES NOT INCLUDES STORAGE BATTERIES. <br />SYSTEM RATING <br />582.62 kWDC <br />562.50 kWAC <br />SHEET INDEX <br />PV-0 COVER PAGE <br />PV-1 SITE PLAN <br />PV-2 ROOF PLAN & MODULES <br />PV-2A STRING LAYOUT & BOM <br />PV-3+ATTACHMENT DETAILS <br />PV-4 ELECTRICAL LINE DIAGRAM <br />PV-4A ELECTRICAL CALCULATIONS <br />PV-4B SPECIFICATIONS & NOTES <br />PV-5 SIGNAGE <br />PV-6+EQUIPMENT SPECIFICATIONS <br />PV-10 CERTIFICATE <br />PC-1 TO PC-13 REPORT <br />GOVERNING CODES <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA ENERGY EFFICIENCY CODE <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />2022 CALIFORNIA ADMINISTRATIVE CODE <br />EQUIPMENT SUMMARY <br />1089 ADANI SOLAR ASB-M10-535 (535W) MODULES <br />9 SUNNY TRIPOWER CORE1 62-US [480V] INVERTERS <br />AHJ NAME : SANTA ANA CITY <br />PROJECT SITE <br />GENERAL NOTES: <br />· THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED ON FIELD INSPECTIONS AND <br /> OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL FIELD CONDITIONS MAY REQUIRE <br /> MODIFICATIONS IN CONSTRUCTION DETAILS. <br />· ARCHITECT HAS NOT BEEN RETAINED TO SUPERVISE ANY CONSTRUCTION OR <br /> INSTALLATION OF ANY EQUIPMENT AT SITE. <br />· CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, OBTAINS ALL <br /> PERMITS, LICENSES AND PAY ALL REQUIRED FEES AND COMPLETE INSTALLATION. <br />· CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS <br /> AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER <br /> BEFORE PROCEEDING WITH THE WORK. ANY WORK STARTED BEFORE CONSULTATION <br /> AND ACCEPTANCE BY THE ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE <br /> CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL <br /> COMPENSATION. <br />· DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALL, <br /> FLOORS, ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION OR REPLACED BY THE <br /> CONTRACTOR AT NO ADDITIONAL COST. <br />· THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND <br /> COMPLETION OF THE WORK WITH APPROVED MATERIALS. <br />· NO CHANGES ARE TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE <br /> ARCHITECT. <br />· CONTRACTOR SHALL OBTAIN BUILDING PERMIT. NO WORK TO START UNLESS BUILDING <br /> PERMIT IS PROPERLY DISPLAYED. <br />· ALL WORKMANSHIP AND MATERIALS SHALL BE OF FIRST QUALITY AND IN COMPLIANCE <br /> WITH THE REQUIREMENTS OF THE CA BUILDING CODE, THE DEPARTMENT OF <br /> ENVIRONMENTAL PROTECTION AND ALL PERTINENT AGENCIES. <br />· IT IS ESSENTIAL THAT ALL WORK PROCEED WITH THE MAXIMUM COOPERATION OF ALL <br /> PARTIES AND WITH MINIMUM INTERFERENCE TO THE OCCUPANTS WITHIN THE BUILDING. <br /> THE OWNER'S DIRECTIONS IN THIS REGARD SHALL BE FULLY COMPLIED WITH. <br />· THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE <br /> LOCAL LAWS & REGULATIONS. <br />· THE CONTRACTOR SHALL OBTAIN ALL PERMITS, APPROVALS, AFFIDAVITS, <br /> CERTIFICATIONS, ETC. AND PAY ALL FEES AS REQUIRED BY THE LOCAL AUTHORITIES. <br />· CONTRACTORS SHALL OBTAIN FIRE CERTIFICATE UPON COMPLETION OF WORK. <br />WIRING AND CONDUIT NOTES: <br />·ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS <br /> PURPOSE AND APPROVED FOR THE SITE APPLICATIONS <br />·ALL PV CABLES AND HOMERUN WIRES BE #10AWG *USE-2, PV <br /> WIRE, OR PROPRIETARY SOLAR CABLING SPECIFIED BY MFR, <br /> OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER <br /> BOXES AS REQUIRED <br />·ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED <br /> ACCORDING TO [REF. TO CEC 2022] FOR MULTIPLE <br /> CONDUCTORS <br />·ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT <br /> SHALL BE DERATED ACCORDING TO [CEC 2022] BLACK ONLY** <br />·EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C <br /> RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR <br /> 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT <br /> WIRE FROM SHARP EDGES <br />·PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED <br /> THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV <br /> RESISTANT, RATED FOR 600V PER CEC 2022 OR 1000V PER <br /> CEC 2022 <br />·WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH <br /> THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR <br /> IDENTIFIED BY OTHER EFFECTIVE MEANS <br />·ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE <br /> CIRCUIT PROTECTION <br />·VOLTAGE DROP LIMITED TO 3% FOR DC CIRCUITS AS WELL AS <br />FOR AC CIRCUIT <br />·AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE <br /> A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, <br /> NEUTRAL- WHITE/GRAY <br />ELECTRICAL NOTES: <br />· THE EQUIPMENT AND ALL ASSOCIATED WIRING AND INTERCONNECTION SHALL BE INSTALLED ONLY BY QUALIFIED PEOPLE. A QUALIFIED PERSON IS ONE <br />WHO HAS SKILLS AND KNOWLEDGE RELATED TO THE CONSTRUCTION AND OPERATION OF THE ELECTRICAL EQUIPMENT AND INSTALLATIONS AND HAS <br />RECEIVED SAFETY TRAINING TO RECOGNIZE AND AVOID THE HAZARDS INVOLVED. (CEC 2022) <br />· LOCAL UTILITY PROVIDER SHALL BE NOTIFIED PRIOR TO USE AND ACTIVATION OF ANY SOLAR PHOTOVOLTAIC INSTALLATION. FOR A LINE SIDE TAP <br />CONNECTION, UTILITY NEEDS TO BE NOTIFIED WELL IN ADVANCE TO COORDINATE BUILDING ELECTRICAL SHUT OFF. <br />· NEW CONDUIT ROUTING SHOWN IS ESSENTIALLY SCHEMATIC. SUBCONTRACTOR SHALL LAY OUT RUNS TO SUIT FIELD CONDITIONS AND THE <br />COORDINATION REQUIREMENTS OF OTHER TRADES. <br />· ARRAY WIRING SHOULD NOT BE READILY ACCESSIBLE EXCEPT TO QUALIFIED PERSONNEL. <br />· ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES SHALL BE WATERTIGHT AND APPROVED FOR USE IN WET LOCATIONS. (CEC 2022). <br />· WIRING METHODS FOR PV SYSTEM CONDUCTORS AREN'T PERMITTED WITHIN 10 IN. OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE LOCATED <br />DIRECTLY BELOW THE ROOF SURFACE THAT'S COVERED BY PV MODULES AND ASSOCIATED EQUIPMENT WIRING <br />· BACK-FED BREAKER MUST BE AT THE OPPOSITE END OF BUS BAR FROM THE MAIN BREAKER OR MAIN LUG SUPPLYING CURRENT FROM THE UTILITIES. <br />· ALL CONDUCTORS AND WIRE TIES EXPOSED TO SUNLIGHT ARE LISTED AS UV RESISTANT. <br />· CONTRACTOR SHALL FOLLOW ALL ELECTRICAL EQUIPMENT LABELING REQUIREMENTS IN CEC 2022 <br />· MEASURE THE LINE-TO-LINE AND LINE-TO-NEUTRAL VOLTAGE OF ALL SERVICE ENTRANCE CONDUCTORS PRIOR TO INSTALLING ANY SOLAR EQUIPMENT. <br />1851 E Deere Ave - 101118504 & <br />20182282 <br />4/11/2024
The URL can be used to link to this page
Your browser does not support the video tag.