Laserfiche WebLink
Job No: <br />Drawn by: <br />Sheet: <br />Date: <br />Scale: <br />N.T.S. <br />A <br />P <br />R <br />O <br />J <br />E <br />C <br />T <br /> <br />F <br />O <br />R <br /> <br />LE <br />G <br />A <br />L <br />I <br />Z <br />E <br /> <br />T <br />E <br />N <br />A <br />N <br />T <br /> <br />I <br />M <br />P <br />R <br />O <br />V <br />E <br />M <br />E <br />N <br />T <br /> <br />COVER S*EET, SITE PLAN <br />CS-1 <br />71 <br />4 <br /> <br />S <br /> <br />H <br />a <br />r <br />b <br />o <br />r <br /> <br />B <br />l <br />v <br />d <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />Vi <br />r <br />t <br />u <br />e <br /> <br />M <br />e <br />d <br />i <br />c <br />a <br />l <br /> <br />G <br />r <br />o <br />u <br />p <br />- <br />M <br />T <br />M <br /> <br />P <br />l <br />u <br />s <br /> <br />P <br />h <br />a <br />r <br />m <br />a <br />c <br />y <br /> <br />DA <br />T <br />E <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br /> <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />10 <br />4 <br />9 <br />2 <br /> <br />T <br />R <br />A <br />S <br />K <br /> <br />A <br />V <br />E <br />, <br /> <br />U <br />N <br />I <br />T <br /> <br />B <br /> <br />Ga <br />r <br />d <br />e <br />n <br /> <br />G <br />r <br />o <br />v <br />e <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />8 <br />4 <br />3 <br />Ph <br />o <br />n <br />e <br />: <br /> <br />( <br />7 <br />1 <br />4 <br />) <br />4 <br />1 <br />7 <br />- <br />1 <br />8 <br />3 <br />9 <br /> <br />- <br /> <br />( <br />6 <br />5 <br />7 <br />) <br />7 <br />2 <br />0 <br />- <br />8 <br />5 <br />5 <br />5 <br /> <br />Em <br />a <br />i <br />l <br />: <br /> <br />a <br />r <br />t <br />. <br />d <br />e <br />s <br />i <br />g <br />n <br />. <br />g <br />r <br />o <br />u <br />p <br />2 <br />0 <br />2 <br />2 <br />@ <br />g <br />m <br />a <br />i <br />l <br />. <br />c <br />o <br />m <br />De <br />s <br />i <br />g <br />n <br /> <br />1. These plans and specifications are the property of KN DEIGN and shall not <br />be used for any work other than the project shown herein. <br />2. Temporary barriers and/or a protective construction fence shall be provided where required <br />by the Building Department and shall be constructed in accordance with the rules, <br />regulations, and ordinances governing the place of the Building. <br />3. Sanitary facilities shall be provided and maintained by Contractor during construction per <br />applicable regulations. <br />4. Contractor shall arrange and pay for all temporary utility services and connections during <br />construction. <br />5. General Notes, notes, and typical details apply to all drawings unless noted otherwise. <br />6. All A.S.T.M. designations shall be amended to date unless otherwise noted. <br />7. Framing conditions not specifically shown shall be framed similar to the details shown for the <br />respective materials. <br />8. Provide openings and supports for mechanical equipment, ducts, piping, vents, etc. as <br />required. Refer to Architectural, and Mechanical Drawings for additional openings and <br />equipment not shown on Structural Drawings. All suspended equipment to be provided with <br />approved lateral bracing. <br />9. DO NOT SCALE DRAWINGS. <br />10. All dimensions are to face of studs, concrete or masonry unless noted otherwise. <br />11. Provide 6" or 8" studs, or furring full length of room wall where required to accommodate <br />plumbing and electrical installations. <br />12. If existing facilities are related to the Work, the Contractor shall not disrupt the existing <br />services or utilities without obtaining the Owner's prior approval and instructions in each case. <br />13. Verify sizes and locations of all mechanical equipment before construction of any bases or <br />pads to support such equipment. <br />14. Verify all plumbing and equipment sizes before beginning construction of cabinets. <br />15. Contractor is responsible for total coordination between all subcontractors and trades. <br />16. Unless noted otherwise, all vestibules, closets, columns, projections, recesses or other <br />adjacent areas within scheduled areas shall have finishes as scheduled for the respective <br />spaces in which they occur. <br />17. Anyone supplying labor and/or materials to the Project shall carefully examine all subsurfaces <br />to receive work. Any conditions detrimental to work shall be reported in writing to Contractor <br />prior to beginning. Commencement of work shall imply acceptance of all subsurfaces. <br />18. Temporary bracing shall not be removed from any element until the element is capable of <br />supporting its design load. <br />19. Any material stored at the Site shall be completely supported free from the ground, covered <br />and otherwise protected to avoid damage from the elements. <br />20. All weather-exposed surfaces shall have a weather-resistive barrier to protect the interior wall <br />covering and that exterior openings shall be flashed in such a manner as to make them <br />weatherproof. <br />21. All new conditions similar to existing conditions shall match existing construction, unless <br />noted otherwise. <br />22. All exposed ends of steel tubes, pipes, and other similar members shall receive steel <br />closures/caps to be welded, ground smooth, and painted to match. <br />23. Provide fire blocking per CBC Sections 717.2.2 through 717.2.7. Fire blocking shall be <br />provided in concealed spaces of stud walls and partitions, including furred spaces at the <br />ceiling and floor level and at 10 ft. intervals both vertical and horizontal. In combustible <br />construction, fire blocking shall be installed to cut off concealed draft openings (both vertical <br />and horizontal) and shall form an effective barrier between floors, and between a top story <br />and a roof or attic space. <br />24. Contractor to provide pedestrian protection in accordance with CBC Section 3306. If a <br />separate building permit is required, the Contractor shall be responsible for submitting and <br />acquiring approval from the governing agency. <br />GENERAL NOTES <br />A. BEFORE MAKING A REQUEST FOR FINAL FIRE INSPECTION, PLEASE READ AND COMPLY WITH THE <br />APPLICABLE RCFPD NOTES: ADDITIONALLY, THE PERSON REQUESTING THE INSPECTION IS <br />RESPONSIBLE FOR MEETING THE INSPECTOR ON TIME, PROVIDING ACCESS TO THE AREA <br />REQUIRING INSPECTION AND HAVING AN APPROVED SET OF PLANS AND SUPPORTING DOCUMENTS <br />AVAILABLE AT THE TIME OF THE INSPECTION. <br />B. B. A FIRE INSPECTION AND FINAL APPROVAL IS REQUIRED BEFORE THE BUILDING DEPARTMENT WILL <br />ACCEPT A BUILDING FINAL INSPECTION REQUEST. PLEASE CALL FIRE CONSTRUCTION SERVICES <br />(FCS) TO REQUEST ALL FIRE INSPECTIONS. <br />C. C. THE KEY TO THE BUILDING OR SUITE MUST BE GIVEN TO THE FIRE INSPECTOR AT THE TIME OF <br />FINAL INSPECTION. THE KEY WILL BE LOCKED IN THE KNOX BOX FOR FIRE DEPARTMENT <br />EMERGENCY ACCESS. <br />D. D. FIRE EXTINGUISHERS MUST BE INSTALLED PER RCFDP FIRE EXTINGUISHER POLICY. START THE <br />PLACEMENT OF FIRE EXTINGUISHERS MUST BE NEAR EXTERIOR EXIT DOORS. MOUNT THE FIRE <br />EXTINGUISHER IN A VISIBLE AND ACCESSIBLE LOCATION 3 1/2' TO 5' ABOVE THE FINISH FLOOR TO <br />HANDLE. BUILDINGS WITH MULTIPLE FLOORS MUST HAVE AT LEAST ONE FIRE EXTINGUISHER PER. <br />FLOOR LIGHT HAZARD ( OFFICE, CLASSROOMS, CHURCHES, ASSEMBLY ROOMS, RESIDENTIAL) <br />OCCUPANCIES REQUIRE "2A1OBC" FIRE EXTINGUISHERS. THE MAXIMUM COVERAGE AREA IS 5,000 <br />SQ. FT. PER EXTINGUISHER AND THE MAXIMUM TRAVEL DISTANCE IS 75'. COMMERCIAL KITCHENS <br />REQUIRE "K" FIRE EXTINGUISHERS WITH A MAXIMUM TRAVEL DISTANCE OF 30'. <br />E. E. AFCS BUILDING & CONTACT INFORMATION FORM MUST BE FILLED OUT BY THE OCCUPANT <br />/OWNER PRIOR TO FINAL INSPECTION AND BE PROVIDED TO THE FIRE INSPECTOR. THE FORM IS <br />AVAILABLE FROM THE FIRE CONSTRUCTION SERVICES (FCS) COUNTER. <br />F. F. THE FIRE SPRINKLER SYSTEM MODIFICATIONS REQUIRES A SEPARATE PLAN CHECK SUBMITTAL <br />AND APPROVAL. WORK SHALL NOT COMMENCE UNTIL A PERMIT IS OBTAINED. INSPECTION OF THE <br />ROUGH PIPING MUST BE PERFORMED PRIOR TO CONCEALMENT, A LIFT IS REQUIRED FOR MOST <br />INSPECTIONS. CEILING TILES MUST NOT INSTALLED UNLESS APPROVED BY THE FIRE INSPECTOR. <br />G. G. THE FIRE ALARM AND / OR FIRE SPRINKLER MONITORING MODIFICATIONS REQUIRED THAT A <br />SEPARATE PLAN CHECK SUBMITTAL AND APPROVAL. WORK SHALL NOT COMMENCE UNTIL A PERMIT <br />IS OBTAINED. <br />H. IN OCCUPANCY GROUPS "A-3" "B" "F" "M" & "S" BUILDINGS, IT IS REQUIRED THAT A SIGN BE PLACED <br />ABOVE THE MAIN ENTRANCE DOOR STATING (THIS DOOR MUST REMAIN UNLOCKED WHEN BUILDING <br />IS OCCUPIED). <br />I. ALL THE DOORS DESIGNATED AS EXITS EXCEPT FOR THE MAIN ENTRANCE IN "A-3" "B""F""S" <br />OCCUPANICES MUST BE EQUIPPED WITH COMMON KNOWLEDGE LEVER TYPE SINGLE ACTION <br />HARDWARE, UNLESS PANIC HARDWARE IS SPECIFICALLY REQUIRED. <br />J. ADDITIONAL EXIT SIGNS MAY BE REQUIRED AT THE TIME OF FINAL INSPECTION, IF THE ONES SHOW <br />ON THE PLANS DO NOT MEET THE INTENT OF THE CODE. <br />K. IF AS-BUILD PLANS ARE REQUIRED, ADDITIONAL FEES WILL BE DUE FOR THE REVIEW OF THE <br />AS-BUILD PLANS. <br />L. THE SUITE ADDRESS DESIGNATION MUST BE INSTALLED ON OR NEAR ALL EXTERIOR DOORS OF THE <br />SUITE IN 3-INCH HIGH NUMBERS OR LETTERS CONTRASTING THE BACKGROUND. <br />M. IF EMERGENCY ILLUNATION IS EXISTING AND/OR REQUIRED, ADDITIONAL FIXTURES MAY BE <br />REQUIRED TO BE INSTALLED (VERIFY THE REQUIREMENT WITH THE PLANS) THE LIGHTING MUST <br />PROVIDE A MINIMUM OF ONE FOOT CANDLE AT THE FLOOR LEVEL THROUGHOUT THE EXIT PATH. <br />TESTING OF THE FIXTURES WILL BE REQUIRED AT FINAL INSPECTION. THE FIRE INSPECTOR MAY <br />REQUEST A NIGHTTIME TEST AT HIS DISCRECTION TO COMFIRM THE MINIMUM REQUIREMENT OF <br />ONE-FOOT CANDLE AT FLOOR LEVEL. <br />N. THE SMOKE DUCT DETECTORS FOR HVAC SHUT DOWN, WHEN REQUIRED, MUST BE INSTALLED TH <br />THE SUPPLY PLENUM OF THE UNIT AND INTERCONNECTED TO THE FIRE ALARM (IF THE BUILDING IS <br />EQUIPPED WITH A FIRE ALARM OR A SPRINKLER MONITORING SYSTEM) A SEPARATE PLAN CHECK <br />SUBMITTAL AND PERMIT IS REQUIRED FOR THE ALARM WORK. <br />O. THE FIRE/SMOKE DAMPERS, WHEN REQUIRED, MUST BE INTERCONNECTED TO THE FIRE ALARM (IF <br />THE BUILDING IS EQUIPPED WITH A FIRE ALARM OF FIRE SPRINKLER MONITORING SYSTEM) A <br />SEPARATE PLAN CHECK SUBMITTAL AND PERMIT IS REQUIRED FOR THE ALARM WORK. <br />FIRE PREVENTION NOTES: <br />SHEET INDEX <br />DESCRIPTIONNo. <br />PROJECT DIRECTORY <br />SPRINKLERED <br />TYPE OF CONSTRUCTION : V-B <br />PROPOSED OCCUPANCY : B <br />BUILDING ZONE : COMMERCIAL <br />: NONE SPRINKLERED <br />LEGALIZE TENANT IMPROVEMENT SQUARE FOOTAGE : 2,374 SQ. FT. <br />OCCUPANCY MAX. : 23 OCC. < 50 <br />EXIT REQUIRED: 2 EXIT PROVIDED: 2 <br />PROJECT DATACODE COMPLIANCE <br />SCOPE OF WORK <br />LEGALIZE TENANT IMPROVEMENT FOR VIRTURE MEDICAL GROUP-MTM PLUS PHARMACY: <br />- EXISTING ROOF TOP HVAC UNIT TO BE REMAIN <br />AGENCY NOTES <br />1. General Contractor to comply with City of Carson Construction and Demolition Diversion <br />Program and all provision of CalGreen Sec 5.408. <br />Note that WRG is the only authorized hauler for construction, demolition, grading projects in <br />the City. Using other haulers will result in legal action and fines. <br />WRG can be reached at 310-366-7600. <br />2. General Contractor to comply with the following CalGreen standards for storm water quality <br />management: <br />5.106.1 STORM WATER POLLUTION PREVENTION. Newly constructed projects <br />and additions which disturb less than one acre of land shall prevent the pollution of storm <br />water runoff from the construction activities through one or more of the following measures: <br />5.106.1.1 Local ordinance. Comply with a lawfully enacted storm water <br />management and/or erosion control ordinance. <br />5.106.1.2 Best Management Practices (BMP). Prevent the loss of soil through <br />wind or water erosion by implementing an effective combination of erosion and sediment <br />control and good housekeeping BMP. <br />1. <br />limited to, the following: <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />g. <br />j. <br />k. <br />Soil loss BMP that should be considered for each project include, but are not <br />Scheduling construction activity. <br />Preservation of natural features, vegetation and soil. <br />Drainage swales or lined ditches to control stormwater flow. <br />Mulching or hydroseeding to stabilize disturbed soils. <br />Erosion control to protect slopes. <br />Protection of storm drain inlets (gravel bags or catch basin inserts). <br />Perimeter sediment control (perimeter silt fence, fiber rolls). <br />h. Sediment trap or sediment basin to retain sediment on site. <br />i. Stabilized construction exits. <br />Wind erosion control. <br />Other soil loss BMP acceptable to the enforcing agency. <br />2. Good housekeeping BMP to manage construction equipment, materials and <br />wastes that should be <br />project include, but are not limited to, the following: <br />a. Material handling and waste management. <br />b. <br />c. <br />d. <br />e. <br />f. <br />Building materials stockpile management. <br />Management of washout areas (concrete, paints, stucco, etc.). <br />Control of vehicle/equipment fueling to contractor's staging area. <br />Vehicle and equipment cleaning performed off site. <br />Spill prevention and control. <br />g. Other housekeeping BMP acceptable to the enforcing agency. <br />considered for implementation as appropriate for each <br />- EXISTING ALL GENDER RESTROOM TO BE REMAIN <br />OWNER: VIRTURE MEDICAL GROUP-MTM PLUS PHARMACY <br />714 S HARBOR BLVD <br />SANTA ANA, CA 92704 <br />(714)797-8551 <br />DESIGNER: ART DESIGN <br />KIM NGUYEN <br />10492 TRASK AVE. #B, <br />GARDEN GROVE, CA 92843 <br />(714)417-1839 <br />B. <br />A. ALL WORK SHALL BE IN CONFORMANCE WITH THE CODES IDENTIFIED IN THE <br />GOVERNING CODES SECTION LISTED BELOW. <br />2022 CALIFORNIA BUILDING CODE AND JURISDICTIONAL AMENDMENTS <br />2022 CALIFORNIA MECHANICAL CODE AND JURISDICTIONAL AMENDMENTS <br />2022 CALIFORNIA PLUMBING CODE AND JURISDICTIONAL AMENDMENTS <br />2022 CALIFORNIA ELECTRICAL CODE AND JURISDICTIONAL AMENDMENTS <br />2022 CALIFORNIA ENERGY CODE AND JURISDICTIONAL AMENDMENTS <br />2022 CALIFORNIA GREEN BUILDING STANDARDS AND JURISDICTIONAL AMENDMENTS <br />CITY CODES AND ORDINANCES <br />DISABLED ACCESSIBILITY <br />CHAPTER 11B OF 2022 CBC <br />ACCESSIBILITY REQUIREMENTS PER THE FEDERAL ADA, ANSI 117.1-2003 AND <br />2022 CBC OR AS AMENDED BY STATE OR LOCAL REGULATIONS, WHICHEVER IS <br />MOST RESTRICTIVE <br />01 <br />02 <br />03 <br />04 <br />05 <br />06 <br />08 <br />CS-1 COVER SHEET, SITE PLAN <br />A-1 EXISTING , PROPOSED FLOOR PLAN <br />A-2 <br />A-3 POWER, CEILING PLAN <br />09 <br />07 <br />MEN / WOMEN RESTROOM PLAN, <br />A-4 <br />G-1 GREEN BUILDING <br />G-2 <br />G-3 <br />T-MOBILE <br />KFC <br />(720) <br />(714) <br />CHEVRON <br />GAS <br />STATION <br />EXISTING VAN ACCESSIBLE PARKING STALL <br />EXISTING ACCESSIBLE SIGN DETAIL <br />A <br />B N <br />PROJECT SITE <br />TASTEA <br />DEFFERED SUBMITTAL <br />ALL NEW EXTERIOR SIGNAGE SHALL BE SUBMIT ON A SEPARATE SIGN APPLICATION <br />FOR PLANNING ANG BUILDING DIVISION REVIEW, APPROVAL, AND INSPECTION. <br />A-5 NOTES, DETAILS <br />EGRESS PATH OF TRAVEL PLAN <br />GREEN BUILDING <br />GREEN BUILDING <br />VICINITY <br />NPROJECT LOCATION <br />** It is the project designer’s/property owner’s responsibility to show compliance on the <br />drawings with all applicable Federal and State Accessibility Standards. <br />** Drawings submitted to the Building Division for review shall provide the following information <br />to insure compliance with CBC Section 11B-202.4: <br />- An accessible entrance <br />- An accessible route to the altered area <br />- Accessible restrooms <br />- Accessible telephone (if any) <br />- Accessible drinking fountains, and <br />- Parking, signage and alarm <br />** 1116A.5 Detectable Warnings at Vehicular Areas <br />When a walk crosses or adjoins a vehicular way, the walking surface shall be separated from the <br />vehicular area by curbs, railings or other elements, or the boundary between the pedestrian areas <br />and the vehicular areas shall be defined by a continuous detectable warning 36 inches (914 mm) <br />wide minimum, complying with Chapter 11B, Section 11B-705. <br />NO <br />PARKING <br />(E) WALKWAY <br />0" C <br />. <br />F <br />. <br />0" C <br />. <br />F <br />. <br />8. <br />3 <br />% <br />ma <br />x <br />2%ma <br />x <br />. <br />2% <br />max. <br />Bottom landing, 60" long, 2% slope, <br />with smooth transition(no 1 <br />2" lip) & <br />detectable warning <br />Retaining curb <br />Ramp down, use least possible <br />slope, 8.3% max <br />12" High Letters <br />36" square ISA <br />pavement sign <br />Wh <br />e <br />e <br />l <br /> <br />S <br />t <br />o <br />p <br />Po <br />s <br />t <br />- <br />m <br />o <br />u <br />n <br />t <br />e <br />d <br />IS <br />A <br /> <br />s <br />i <br />g <br />n <br /> <br />0.45" AT TOP <br />0.9" AT BASE <br />TAPERED EDGES <br />WHERE EXPOSED <br />SECTION A-A <br />NOTE: <br />Detectable warning surfaces shall be yellow <br />and approximate FS 33538 of Federal <br />Standard 595C. §11B-705.1.1.3.1 2.35" <br />APART <br />PLAN VIEW <br />0.45" AT TOP <br />0.9" AT BASE <br />A A <br />0. <br />2 <br />" <br /> <br />H <br />T <br />. <br />2. <br />3 <br />5 <br />" <br />AP <br />A <br />R <br />T <br />TRUNCATED DOME <br />(Detectable warning) <br />Maximum Height Of Building Above Grade Plane 1 Story <br />TRAVEL DISTANCE 80 FT <br />(710) <br />- NEW NON-BEARING WALL TO CREATE EXAM ROOMS AND STORAGE <br />- NEW HAND SINK AT HALL WAY <br />Access aisles shall be marked with <br />a blue painted borderline around <br />their perimeter. <br />- NEW TWO EXTERIOR DOORS <br />- REPLACE ALL ACCESSIBLE SIGNAGE <br />- UPGRADE TWO RESTROOM: REPLACE GRAB BAR, TOILET, <br />TOILET PAPER DISPENSE, TOILET SEAT COVER DISPENSER <br />- NEW DRINKING WATER DISPENSE <br />1 <br />BU <br />I <br />LD <br />I <br />NG <br /> <br />CR <br />. <br />01 <br />/ <br />0 <br />7 <br />/ <br />2 <br />0 <br />2 <br />5 <br />1 <br />Bldg #101120688 <br /> <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - W. Lee <br />POLICE - B. Martin <br />Pubic Works - Y. Soto <br />714 S Harbor Blvd <br />2/25/2025