L
<br />ABBREVIATION LEGEND
<br />ANCHOR BOLT
<br />AMERICAN CONCRETE INSTITUTE
<br />ABOVE FINISHED FLOOR
<br />AMERICAN INSTITUTE OF STEEL CONSTRUCTION
<br />ARCHITECTURAL
<br />AMERICAN SOCIETY OF TESTING AND MATERIALS
<br />AMERICAN WELDING SOCIETY
<br />BELOW FINISHED FLOOR
<br />BLOCK LINTEL
<br />BOTTOM OF
<br />BOTTOM OF STEEL
<br />BEARING
<br />CONTROL JOINT
<br />CENTERLINE
<br />CLEAR
<br />CONCRETE MASONRY UNIT
<br />COLUMN
<br />CONCRETE
<br />CONSTRUCTION
<br />CONTINUOUS
<br />DIAMETER
<br />ELECTRICAL DISTRIBUTION CENTER
<br />EXTERIOR INSULATION AND FINISH SYSTEM
<br />EXPANSION JOINT
<br />ELEVATION
<br />ELECTRICAL
<br />EQUAL
<br />EACH WAY
<br />FOUNDATION
<br />FINISHED FLOOR
<br />FIBER REINFORCED PLASTIC
<br />FAR SIDE
<br />FOOTING
<br />GAUGE
<br />GENERAL CONTRACTOR
<br />GYPSUM BOARD
<br />HANDICAP
<br />HORIZONTAL
<br />HEADED STUD ANCHOR
<br />INFORMATION
<br />ISOLATION
<br />JOIST BEARING ELEVATION
<br />JOIST
<br />JOINT
<br />KIPS PER SQUARE INCH
<br />LENGTH
<br />POUNDS
<br />LONG LEG HORIZONTAL
<br />LONG LEG VERTICAL
<br />LONGITUDINAL
<br />MAXIMUM
<br />MECHANICAL
<br />MECHANICAL ELECTRICAL PLUMBING
<br />MINIMUM
<br />MISCELLANEOUS
<br />MASONRY OPENING
<br />METAL
<br />NOT IN CONTRACT
<br />NUMBER
<br />NEAR SIDE
<br />NOT TO SCALE
<br />ON CENTER
<br />OUTSIDE DIAMETER
<br />OPPOSITE HAND
<br />POWDER ACTUATED FASTENER
<br />POUNDS PER CUBIC FOOT
<br />PLASTIC LAMINATE
<br />PLATE
<br />PREMOLDED EXPANSION JOINT
<br />POUNDS PER SQUARE INCH
<br />POUNDS PER LINEAR FOOT
<br />QUANTITY
<br />REFER TO
<br />REINFORCING
<br />REQUIRED
<br />REVERSE
<br />ROUGH OPENING
<br />ROOF TOP UNIT
<br />SCHEDULE
<br />STEEL DECK INSTITUTE
<br />SIMILAR
<br />STEEL JOIST INSTITUTE
<br />SPECIFICATIONS
<br />STRUCTURAL
<br />TOP AND BOTTOM
<br />THICKNESS
<br />TOP OF
<br />TOP OF CONCRETE
<br />TOP OF FOOTING
<br />TOP OF GRADE BEAM
<br />TOP OF MASONRY
<br />TOP OF PAVING
<br />TOP OF STEEL
<br />TRANSVERSE
<br />TYPICAL
<br />VERTICAL
<br />WALMART
<br /> GENERAL ABBREVIATIONS
<br />AB
<br />ACI
<br />AFF
<br />AISC
<br />ARCH
<br />ASTM
<br />AWS
<br />BFF
<br />BL
<br />BO
<br />BOS
<br />BRG
<br />CJ
<br />CL
<br />CLR
<br />CMU
<br />COL
<br />CONC
<br />CONST
<br />CONT
<br />DIA
<br />EDC
<br />EIFS
<br />EJ
<br />EL
<br />ELEC
<br />EQ
<br />EW
<br />FDN
<br />FF
<br />FRP
<br />FS
<br />FTG
<br />GA
<br />GC
<br />GYP BD
<br />HC
<br />HORIZ
<br />HSA
<br />INFO
<br />ISO
<br />JBE
<br />JST
<br />JT
<br />KSI
<br />L
<br />LB
<br />LLH
<br />LLV
<br />LONG
<br />MAX
<br />MECH
<br />MEP
<br />MIN
<br />MISC
<br />MO
<br />MTL
<br />NIC
<br />NO
<br />NS
<br />NTS
<br />OC
<br />OD
<br />OH
<br />PAF
<br />PCF
<br />PLAM
<br />PL
<br />PMEJ
<br />PSF
<br />PSI
<br />QTY
<br />REF
<br />REINF
<br />REQD
<br />REV
<br />RO
<br />RTU
<br />SCHED
<br />SDI
<br />SIM
<br />SJI
<br />SPECS
<br />STRUC
<br />T&B
<br />THK
<br />TO
<br />TOC/TC
<br />TOF
<br />TOGB
<br />TOM
<br />TOP/TP
<br />TOS
<br />TRANS
<br />TYP
<br />VERT
<br />WM
<br />ABBR DEFINITION
<br />UNO UNLESS NOTED OTHERWISE
<br />PLF
<br />POUNDS PER SQUARE FOOT
<br />GM GENERAL MERCHANDISE
<br />GROCERYGR
<br />MASONRY ELEVATIONME
<br />MECHANICAL AIR UNITMAU
<br />EXHAUST FANEF
<br />CONDENSING UNITCU
<br />FIELD VERIFYFV
<br />ELECTRIC WATER COOLEREWC
<br />EXISTING TO REMAINETR
<br />ADA AMERICANS WITH DISABILITIES ACT
<br />DIRECTS SHIPPING DELIVERYDSD
<br />ADJ ADJACENT
<br />HIGH DEFINITION TELEVISIONHDTV
<br />HOLLOW STRUCTURAL SECTIONHSS
<br />PVC POLYVINYL CHLORIDE
<br />ACRYL ACRYLIC
<br />PLASTICPLAST
<br />TEMPEREDTEMP
<br />ELECTRONIC ARTICLE SURVEILLANCEEAS
<br />REFRIGERATION CONTRACTORRC
<br />STANDARDSTD
<br />ABOVE FINISHED GRADEAFG
<br />SANITARY COVE BASESCB
<br />STAINLESS STEELSS
<br />PHARMACY PAINT FIX CLEANRXPFC
<br />VISION CENTER PAINT FIX CLEANVCPFC
<br />WIDTHW
<br />HEIGHTHT
<br />PAINT, FIX, CLEANPFC
<br />MANUFACTURERMFR
<br />LUXURY VINYL TILELVT
<br />EXPOSED CONCRETEEC
<br />DEFINITION LEGEND
<br />FINAL MERCHANDISE PLAN -FINALIZED MERCHANDISE PRINT FROM WM
<br />ALSO REFERRED TO AS THE DEAL BOX COPY
<br />SYMBOLS LEGEND
<br />2-A2
<br />10.1
<br />X-XX
<br />100
<br />A6
<br />101
<br />A
<br />M
<br />100'-0"
<br />FF EL
<br />100'-0"
<br />X.XX
<br />100
<br />X.XX
<br />X.XX X.XX
<br />X.XX X.XX
<br />X.XX
<br />X.XX
<br />X.XX
<br />5
<br />A2
<br />5
<br />A2
<br />KEYNOTE INDICATOR
<br />FULL AND PARTIAL
<br />SECTION INDICATOR
<br />EXTERIOR AND INTERIOR
<br />ELEVATION INDICATOR
<br />ROOM NAME AND NUMBER
<br />COLUMN LINE INDICATOR
<br />HEIGHT ELEVATION INDICATOR
<br />PLAN ELEVATION INDICATOR
<br />ENLARGED DETAIL INDICATOR
<br />PARTITION TYPE INDICATOR
<br />COLOR INDICATOR
<br />DOOR INDICATOR
<br />WINDOW INDICATOR
<br />DETAIL INDICATOR
<br />REFERENCE AT KEYNOTE INDICATOR
<br />TV MONITOR
<br />A KEYNOTE OR BLOCK OF
<br />KEYNOTES WITH A LEADER
<br />ATTACHED APPLY SPECIFICALLY
<br />TO THE ITEM, AREA, OR SURFACE
<br />TO WHICH THE LEADER IS
<br />POINTING
<br />IN ADDITION TO THE ROOM FINISH
<br />SCHEDULE, A KEYNOTE OR BLOCK
<br />OF KEYNOTES ATTACHED TO THE
<br />ROOM NAME TAG APPLY TO THE
<br />ENTIRE ROOM
<br />SALES
<br />A
<br />SALES
<br />P3
<br />2-A2
<br />SITE VERIFICATION REQUIREMENTS:
<br />GENERAL CONSTRUCTION REQUIREMENTS:
<br />DEMOLITION REQUIREMENTS:
<br />1. THE ARCHITECT HAS PREPARED THESE DRAWINGS BASED ON THE EXISTING BUILDING CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRATOR TO VERIFY ALL THE
<br />EXISTING CONDITIONS PRIOR TO THE SUBMISSION OF HIS BID AND THE COMMENCEMENT OF ANY WORK. NO ADDITIONAL COMPENSATION WILL BE PAID DUE TO THE
<br />CONTRACTOR'S FAILURE TO ACQUAINT HIMSELF WITH EXISTING SITE CONDITIONS WHICH INCLUDE, BUT ARE NOT LIMITED TO EXISTING WALL, CEILINGS, OR UTILITIES.
<br />2. ANY DISCREPANCY WITH THE EXISTING SITE CONDITIONS AND/OR THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION AND
<br />INSTRUCTION. THESE CONSTRUCTION DOCUMENTS HAVE BEEN DESIGNED AND DRAWN ASSUMING EXISTING BUILDING CONDITIONS MATCH THE ORIGINAL DRAWINGS.
<br />THE GENERAL CONTRACTOR, IMMEDIATELY UPON ARRIVAL AT THE SITE, SHALL VERIFY ALL EXISTING STRUCTURAL COLUMN DIMENSIONS, STRUCTURAL BEARING
<br />HEIGHTS, EXISTING DIMENSIONS, TOP OF MASONRY ELEVATIONS, ROOFING CONDITIONS (INCLUDING PARAPETS, SCUPPERS AND ROOF DRAINS), AND JOIST BEARING
<br />ELEVATIONS PRIOR TO THE FABRICATION OF ANY STRUCTURAL ITEMS. IF DISCREPANCIES ARE FOUND BETWEEN WHAT IS SHOWN ON THE DRAWINGS AND EXISTING
<br />FIELD CONDITIONS, CONTACT THE WALMART CONSTRUCTION MANAGER AND THE ARCHITECT IMMEDIATELY TO DETERMINE WHAT ACTION SHOULD BE TAKEN TO MATCH
<br />EXISTING CONDITIONS. THE BEGINNING OF STRUCTURAL STEEL FABRICATION BY THE GENERAL CONTRACTOR, STEEL FABRICATOR, OR JOIST MANUFACTURER MEANS
<br />ACCEPTANCE OF THE EXISTING CONDITIONS.
<br />3. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES (WHETHER SHOWN OR
<br />NOT) PRIOR TO THE SUBMISSION OF A BID OR THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE WALMART CONSTRUCTION MANAGER OF
<br />THE DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED ON DRAWINGS.
<br />4. THE CONTRACTOR SHALL VERIFY AND MAINTAIN (REPAIR IF DAMAGED) EXISTING IRRIGATION SYSTEMS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT.
<br />5. THE CONTRACTOR SHALL FIELD LOCATE AND VERIFY ALL PROPERTY LINES, EASEMENTS, SETBACKS AND RESTRICTIONS. A REGISTERED SURVEYOR SHALL ESTABLISH
<br />ALL PROPERTY LINES AND SETBACKS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND CLEARLY FLAG PROPERTY LINES AND SETBACKS. IT REMAINS THE
<br />RESPONSIBILITY OF THE GENERAL CONTRACTOR TO DETERMINE EXACT LOCATION OF ALL SAID BOUNDARIES.
<br />6. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UNDERGROUND UTILITY SERVICES PRIOR TO ANY EXCAVATION.
<br />7. THE CONTRACTOR SHALL VERIFY ALL GRADES AND PROPOSED FINAL GRADES. IF RAMPS, STOOPS, STAIRS, SIDEWALKS, FLATWORK OR PAVING ARE INSTALLED, VERIFY
<br />FINAL GRADES SURROUNDING THE NEW CONSTRUCTION AND ADJUST STAIR RISERS, RAMP LENGTHS, LIMITS OF PAVING, ETC., TO ACCOMMODATE THE REQUIRED RAMP
<br />SLOPE, RISER HEIGHTS OR PAVING AREAS. ALL RAMPS AND STAIRS SHALL MEET ADA-ADAAGS (OR ADOPTED HANDICAP ACCESSIBILITY REQUIREMENTS). IF THERE IS A
<br />CONFLICT IN FIELD CONDITIONS, NOTIFY WALMART CONSTRUCTION MANAGER AND THE ARCHITECT PRIOR TO THE CONSTRUCTION OR ORDERING OF MATERIALS.
<br />8. NOT USED.
<br />9. NOT USED.
<br />10. NOT USED.
<br />11. REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY TO WALMART AND THE ARCHITECT PRIOR TO MAKING ANY STRUCTURAL MODIFICATIONS OR ORDERING
<br />OF ANY MATERIALS.
<br />1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA REGULATIONS.
<br />2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS,
<br />FIXTURES, PLUMBING, PAVING, MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK AS SHOWN ON DRAWING OR AS REQUIRED FOR THE
<br />INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB.
<br />3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING.
<br />4. WHEN REMOVING EXISTING STRUCTURAL ITEMS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING, BRACING AND SUPPORT SYSTEMS TO
<br />KEEP THE EXISTING STRUCTURE INTACT AND IN A SAFE CONDITION. REFER TO SECTIONS 02023 AND 02251.
<br />5. NOT USED.
<br />6. NOT USED.
<br />7. NOTES INDICATING DEMOLITION WORK ARE NOT CONFINED SOLELY TO THE DEMOLITION PLANS. THE GENERAL CONTRACTOR SHALL REVIEW ALL CONSTRUCTION
<br />DOCUMENTS, INCLUSIVE OF SCHEDULES AND SPECIFICATIONS, TO DETERMINE FULL EXTENT OF DEMOLITION WORK.
<br />8. REFER DETAILS 2,3,4,5 AND 6-D1 WHEN DEMOLITION REQUIRES THE USE OF A DUSTWALL.
<br />1. ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL AND/OR STATE (IF APPLICABLE) BUILDING CODES,
<br />NATIONAL ELECTRIC CODE, CABC AND OTHER ADOPTED ACCESSIBILITY STANDARDS, OSHA, AND ALL APPLICABLE CODES, REGULATIONS, ORDINANCES AND
<br />AUTHORITIES HAVING JURISDICTION (AHJ).
<br />2. PROVISIONS REGARDING THE USE OF GAS AND DIESEL EQUIPMENT WITHIN AN ENCLOSED BUILDING, FORMERLY INCLUDED IN THIS PARAGRAPH, ARE NOW INCLUDED IN
<br />SECTION 01351 - REGULATORY COMPLIANCE
<br />3. PROVISIONS REGARDING CORDS FOR ELECTRICAL EQUIPMENT AND ROUTING OF EQUIPMENT CORDS AND HOSES, FORMERLY INCLUDED IN THIS PARAGRAPH, ARE NOW
<br />INCLUDED IN SECTION 01351 - REGULATORY COMPLIANCE
<br />4. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO
<br />REVIEW THESE DOCUMENTS DOES NOT RELIEVE THE SUBCONTRACTOR OF ANY RESPONSIBILITY FOR PERFORMING WORK PROPERLY. NO ADDITIONAL COMPENSATION
<br />SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
<br />5. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS REQUIRED AND/OR AS DIRECTED BY
<br />WALMART CONSTRUCTION MANAGER TO KEEP DUST AND MOISTURE FROM THE OPERATING AREAS OF THE STORE.
<br />6. ANY DAMAGE TO WALMART'S PROPERTY, WHICH OCCURS DURING THE PROCESS OF CONSTRUCTION SHALL BE REPAIRED/REPLACED AT NO ADDITIONAL COST TO
<br />WALMART; THIS INCLUDES ALL MERCHANDISE. CONTRACTOR SHALL PAY THE COST FOR ALL DAMAGED MERCHANDISE.
<br />7. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES KEEPING THE BUILDING SECURE FROM
<br />PERSONS, ENVIRONMENTAL ELEMENTS OR HAZARDS. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE INTEGRITY OF ALL EXISTING SECURITY SYSTEMS.
<br />THE CONTRACTOR SHALL OBTAIN PERMISSION FROM THE STORE MANAGER PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR THE OPENING
<br />(DEMOLITION) OF ANY EXTERIOR WALL.
<br />8. THE CONTRACTOR SHALL KEEP THE WORK AREA CLEAN AND FREE OF DEBRIS AND REMOVE ALL TRASH AND DEBRIS FROM THE CONSTRUCTION AREA DAILY. NO
<br />FLAMMABLE MATERIALS OR LIQUIDS MAY BE STORED IN THE EXISTING BUILDING OR IN ANY NEW ADDITION.
<br />9. REMOVE ANY EXISTING EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES AS REQUIRED SHOWN OR NOT SHOWN, FOR THE
<br />INSTALLATION OF NEW CONSTRUCTION. PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING
<br />FINISHES.
<br />10. REPAIR, RE-ROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE CONSTRUCTION PROCESS TO
<br />MAINTAIN NORMAL STORE OPERATIONS AND AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION. THIS INCLUDES ALL ITEMS SHOWN OR NOT SHOWN ON THE
<br />DRAWINGS. RESET EXISTING EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES OR RELATED ITEMS AS REQUIRED FOR PROPER OPERATION.
<br />11. WHEN EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES ARE TEMPORARILY REMOVED OR RELOCATED IN ORDER TO PERFORM
<br />WORK, THE CONTRACTOR IS RESPONSIBLE FOR RETURNING THEM TO THEIR ORIGINAL POSITION, RECONNECTION OF SERVICES AND APPROPRIATE MEANS OF
<br />ATTACHMENT UNLESS SPECIFICALLY DIRECTED TO DO OTHERWISE.
<br />12. WHERE EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH AND REPAINT AS NECESSARY TO BLEND IN WITH ADJACENT WORK. COORDINATE WITH WALMART
<br />CONSTRUCTION MANAGER.
<br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE CONSTRUCTION SCHEDULE OF THIS PROJECT. IT IS
<br />THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE DELIVERY OF MATERIALS IN A TIMELY MANNER.
<br />14. NOT USED.
<br />15. THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREMENTS OF THE STRUCTURAL ENGINEER/ARCHITECT FOR VERIFICATIONS, RESPONSES, AND
<br />SUBMISSIONS.
<br />16. IF MODIFICATION TO SPRINKLER SYSTEM IS REQUIRED THE GENERAL CONTRACTOR SHALL HIRE A LICENSED SPRINKLER CONTRACTOR. CONTRACTOR TO SUBMIT
<br />SIGNED AND SEALED SPRINKLER DRAWINGS FOR APPROVAL PRIOR TO ANY ALTERATION OF THE AUTOMATIC SPRINKLER SYSTEM. WORK TO BE DONE UNDER SEPARATE
<br />PERMIT.
<br />17. NOT USED.
<br />18. MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR CITY STREETS TO BE CLEANED IMMEDIATELY.
<br />19. BUILDING COMPONENTS AFFECTED BY THE SCOPE OF WORK AND ALLOWED TO REMAIN SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE
<br />OF ANY KIND IN THE FUTURE.
<br />20. SCHEDULE ALL WORK TO KEEP DISRUPTIONS TO THE STORE AT A MINIMUM. COORDINATE UTILITY DISRUPTIONS WITH THE STORE MANAGER.
<br />SHEET:
<br />DRAWN BY:
<br />CHECKED BY:
<br />PROTO CYCLE:
<br />DOCUMENT DATE:
<br />CO
<br />N
<br />S
<br />U
<br />L
<br />T
<br />A
<br />N
<br />T
<br />S
<br />ST
<br />I
<br />P
<br />U
<br />L
<br />A
<br />T
<br />I
<br />O
<br />N
<br />
<br />F
<br />O
<br />R
<br />
<br />R
<br />E
<br />U
<br />S
<br />E
<br />PR
<br />O
<br />T
<br />O
<br />:
<br />JO
<br />B
<br />
<br />N
<br />U
<br />M
<br />B
<br />E
<br />R
<br />:
<br />TH
<br />I
<br />S
<br />
<br />D
<br />R
<br />A
<br />W
<br />I
<br />N
<br />G
<br />
<br />W
<br />A
<br />S
<br />
<br />P
<br />R
<br />E
<br />P
<br />A
<br />R
<br />E
<br />D
<br />
<br />F
<br />O
<br />R
<br />
<br />US
<br />E
<br />
<br />O
<br />N
<br />
<br />A
<br />
<br />S
<br />P
<br />E
<br />C
<br />I
<br />F
<br />I
<br />C
<br />
<br />S
<br />I
<br />T
<br />E
<br />
<br />A
<br />T
<br />:
<br />CO
<br />N
<br />T
<br />E
<br />M
<br />P
<br />O
<br />R
<br />A
<br />N
<br />E
<br />O
<br />U
<br />S
<br />L
<br />Y
<br />
<br />W
<br />I
<br />T
<br />H
<br />
<br />I
<br />T
<br />S
<br />
<br />I
<br />S
<br />S
<br />U
<br />E
<br />
<br />DA
<br />T
<br />E
<br />
<br />O
<br />N
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />A
<br />N
<br />D
<br />
<br />I
<br />T
<br />
<br />I
<br />S
<br />
<br />N
<br />O
<br />T
<br />
<br />SU
<br />I
<br />T
<br />A
<br />B
<br />L
<br />E
<br />
<br />F
<br />O
<br />R
<br />
<br />U
<br />S
<br />E
<br />
<br />O
<br />N
<br />
<br />A
<br />
<br />D
<br />I
<br />F
<br />F
<br />E
<br />R
<br />E
<br />N
<br />T
<br />
<br />PR
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />S
<br />I
<br />T
<br />E
<br />
<br />O
<br />R
<br />
<br />A
<br />T
<br />
<br />A
<br />
<br />L
<br />A
<br />T
<br />E
<br />R
<br />
<br />T
<br />I
<br />M
<br />E
<br />.
<br />
<br />U
<br />S
<br />E
<br />
<br />OF
<br />
<br />T
<br />H
<br />I
<br />S
<br />
<br />D
<br />R
<br />A
<br />W
<br />I
<br />N
<br />G
<br />
<br />F
<br />O
<br />R
<br />
<br />R
<br />E
<br />F
<br />E
<br />R
<br />E
<br />N
<br />C
<br />E
<br />
<br />O
<br />R
<br />
<br />EX
<br />A
<br />M
<br />P
<br />L
<br />E
<br />
<br />O
<br />N
<br />
<br />A
<br />N
<br />O
<br />T
<br />H
<br />E
<br />R
<br />
<br />P
<br />R
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />RE
<br />Q
<br />U
<br />I
<br />R
<br />E
<br />S
<br />
<br />T
<br />H
<br />E
<br />
<br />S
<br />E
<br />R
<br />V
<br />I
<br />C
<br />E
<br />S
<br />
<br />O
<br />F
<br />
<br />P
<br />R
<br />O
<br />P
<br />E
<br />R
<br />L
<br />Y
<br />
<br />LI
<br />C
<br />E
<br />N
<br />S
<br />E
<br />D
<br />
<br />A
<br />R
<br />C
<br />H
<br />I
<br />T
<br />E
<br />C
<br />T
<br />S
<br />
<br />A
<br />N
<br />D
<br />
<br />E
<br />N
<br />G
<br />I
<br />N
<br />E
<br />E
<br />R
<br />S
<br />.
<br />
<br />RE
<br />P
<br />R
<br />O
<br />D
<br />U
<br />C
<br />T
<br />I
<br />O
<br />N
<br />
<br />O
<br />F
<br />
<br />T
<br />H
<br />I
<br />S
<br />
<br />D
<br />R
<br />A
<br />W
<br />I
<br />N
<br />G
<br />
<br />F
<br />O
<br />R
<br />
<br />RE
<br />U
<br />S
<br />E
<br />
<br />O
<br />N
<br />
<br />A
<br />N
<br />O
<br />T
<br />H
<br />E
<br />R
<br />
<br />P
<br />R
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />I
<br />S
<br />
<br />N
<br />O
<br />T
<br />
<br />AU
<br />T
<br />H
<br />O
<br />R
<br />I
<br />Z
<br />E
<br />D
<br />
<br />A
<br />N
<br />D
<br />
<br />M
<br />A
<br />Y
<br />
<br />B
<br />E
<br />
<br />C
<br />O
<br />N
<br />T
<br />R
<br />A
<br />R
<br />Y
<br />
<br />T
<br />O
<br />
<br />TH
<br />E
<br />
<br />L
<br />A
<br />W
<br />.
<br />SEAL:
<br />5/
<br />2
<br />0
<br />/
<br />2
<br />0
<br />2
<br />4
<br />
<br />7
<br />:
<br />5
<br />5
<br />:
<br />5
<br />6
<br />
<br />A
<br />M
<br />N1
<br />GENERAL
<br />INFORMATION
<br />ATL
<br />23
<br />8
<br />0
<br />3
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />02
<br />/
<br />0
<br />2
<br />/
<br />2
<br />4
<br />02/02/24
<br />ST
<br />O
<br />R
<br />E
<br />
<br />N
<br />O
<br />:
<br />
<br />2
<br />5
<br />1
<br />7
<br />13
<br />5
<br />12/15/23
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />RD
<br />36
<br />0
<br />0
<br />
<br />W
<br />
<br />M
<br />C
<br />F
<br />A
<br />D
<br />D
<br />E
<br />N
<br />
<br />A
<br />V
<br />E
<br />,
<br />
<br />S
<br />A
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />4
<br />ISSUE BLOCK
<br />A1 Addendum1 02/22/2024
<br />A1
<br />LAOFCIF
<br />ANIRO
<br />RENEWAL
<br />DATE
<br />L
<br />I
<br />CENSE D A R CHITE
<br />C
<br />T
<br />PAGE WINKLER
<br />9-30-2025
<br />C-31839
<br />STATE
<br />05.17.2024
<br />3600 W McFadden Ave -
<br />1011183846/20/2024
|