Laserfiche WebLink
SolarMount Unirac Code-Compliant Installation Manual :FUNIRAC <br />[3.2.] Installing SolarMount with top mounting clamps <br />This section covers SolarMount rack assembly where the installer has elected to use top mounting clamps to secure modules to the <br />rails. It details the procedure for flush mounting SolarMount systems to a pitched roof. <br />7. <br />. Mid Clame\. <br />1 <br />End Clamp <br />V <br />SolarMount Rail <br />SerMount Rail <br />Figure 5. Exploded view of a.flushmount installation mounted with L-feet. <br />Table I 3.Wrenches and torque <br />Wrench Recommended <br />size torque (ft-lbs) <br />!4" hardware 16" IDE <br />34" hardware 30 <br />Torques are not designated /br use with wood connectors. <br />Top mounting domps and L-feet require the use <br />ofant,-seize. <br />All top down clamps and L-feet must be installed with <br />anti-seize to prevent galling and provide uniformity <br />in clamp load. UniRac Inc recommends Silver <br />Grade LocTite Anti-Seize Item numbers: 38181, <br />80209,76732,76759,76764,80206, and 76775, or <br />equivalent. 1/4" - 20 hardware used in conjunction <br />with top down clamps must be installed to 10.ft-lbs <br />of torque. When using UGC-1, UGC-2, WEEB 9.5 and <br />WEEB 6.7, 1/4" -20 hardware must be installed to <br />1012-lbs of torque. Additionally, when used with <br />a top down clamp, the moduleframe cross section <br />must be boxed shaped as opposed to a single, l-shaped <br />member. Please refer to installation supplement 910: <br />Galling and Its Preventionfor more information <br />on galling and anti-seize and installation manual <br />225: Top Mounting Unirac Grounding Clips <br />and WEEBLugsfor more information on Grounding <br />Clips." <br />0 <br />Pall <br />15