Laserfiche WebLink
:FUNIRAC Unirac Code-Compliant Installation Manual SolarMount <br />[3.2.5] Installing the modules <br />Pre-wiring Modules: If modules are the Plug and Play type, <br />no pre-wiring is required, and you can proceed directly to <br />"Installing the First Module" below. <br />If modules have standard J-boxes, each module should be <br />pre-wired with one end of the intermodule cable for ease of <br />installation. For safety reasons, module pre-wiring should not be <br />performed on the roof. <br />1 <br />Leave covers off J-boxes. They will be installed when the I <br />modules are installed on the rails. <br />30f 14 9/4 <br />1 <br />ZZ- J-boxes <br />Installing the First Module: In high-profile installations, the <br />best practice would be to install a safety bolt (W'-20 x 1/2")and <br />flange nut (both installer provided) fastened to the module bolt <br />slot at the aligned (lower) end of each rail. It will prevent the <br />lower end clamps and clamping bolts from sliding out of the rail <br />slot during installation. <br />Figure 17 <br />2 Module frame <br />1/2" minimum - <br />L ·i <br />If there is a return cable to the inverter, connect it to the first 9., 1/4" module bolt <br />module. Close the J-box cover. Secure the first module with -4 and flange nut <br />T-bolts and end clamps at the aligned end ofeach rail. Allow i <br />half an inch between the rail ends and the end clamps (Fig.18). <br />Finger tighten flange nuts, center and align the module as -Railneeded, and securely tighten the flange nuts (10 ft lbs).End clamp -1 ## , <br />Installing the Other Modules: Lay the second module face <br />down (glass to glass) on the first module. Connect intermodule <br />cable to the second module and close the J-box cover. Turn the <br />second module face up (Fig. 17). With T-bolts, mid-clamps and <br />flange nuts, secure the adjacent sides of the first and second <br />modules. Align the second module and securely tighten the <br />flange nuts (Fig. 19). <br />For a neat installation, fasten wire management devices to rails <br />with self-drilling screws. <br />Repeat the procedure until all modules are installed. Attach the <br />outside edge of the last module to the rail with end clamps. <br />Trim off any excess rail, being careful not to cut into the roof. <br />Allow half an inch between the end clamp and the end of the rail <br />(Fig <br />Figure 18 <br />Module frames <br />1/4" module bolt,/.- and flange nut <br />f Rail <br />Mid clamp <br />.18). <br />Ir <br />High-lipped module <br />(cross section) <br />Figure 19 <br />Spacer <br />1 1 Low-lipped module(cross section) <br />I l, <br />. . 4, <br />/\ <br />solarMount rail SolarMount rail <br />Figure 20. Mid clamps and end clampsfor tipped-frame modules are identical. A spacerfor the end clamps is necessary only if the lips are <br />located high on the moduleframe. <br />0 <br />Page. <br />20