IN CASE OF EMERGENCY, CALL: CONTRACTOR NAME ___________________________. <br />PHONE NUMBER:_________________. <br />A STAND-BY CREW FOR EMERGENCY WORK SHALL BE AVAILABLE AT ALL TIMES DURING THE RAINY <br />SEASON (NOVEMBER 1 TO APRIL 15). NECESSARY MATERIALS SHALL BE AVAILABLE ON-SITE AND <br />STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF EMERGENCY DEVICES <br />WHEN RAIN IS IMMINENT. <br />EROSION CONTROL DEVICES SHOWN ON THIS PLAN MAY BE REMOVED WHEN APPROVED BY THE BUILDING <br />OFFICIAL IF THE GRADING OPERATION HAS PROGRESSED TO THE POINT WHERE THEY ARE NO LONGER <br />REQUIRED. <br />GRADED AREAS ADJACENT TO FILL SLOPES LOCATED AT THE SITE PERIMETER MUST DRAIN AWAY FROM <br />THE TOP OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. ALL LOOSE SOILS AND DEBRIS THAT <br />MAY CREATE A POTENTIAL HAZARD TO OFF-SITE PROPERTY SHALL BE STABILIZED OR REMOVED FROM <br />THE SITE ON A DAILY BASIS. <br />ALL SILT AND DEBRIS SHALL BE REMOVED FROM ALL DEVICES WITHIN 24 HOURS AFTER EACH RAINSTORM <br />AND BE DISPOSED OF PROPERLY. <br />A GUARD SHALL BE POSTED ON SITE WHEREVER THE DEPTH OF WATER IN ANY DEVICE EXCEEDS TWO <br />FEET. THE DEVICE SHALL BE DRAINED OR PUMPED DRY WITHIN 24 HOURS AFTER EACH RAINSTORM. <br />PUMPING AND DRAINING OF ALL BASINS AND DRAINAGE DEVICES MUST COMPLY WITH THE APPROPRIATE <br />BMP FOR DEWATERING OPERATIONS. <br />THE PLACEMENT OF ADDITIONAL DEVICES TO REDUCE EROSION DAMAGE AND CONTAIN POLLUTANTS <br />WITHIN THE SITE IS LEFT TO THE DISCRETION OF THE QSP. ADDITIONAL DEVICES AS NEEDED SHALL BE <br />INSTALLED TO RETAIN SEDIMENTS AND OTHER POLLUTANTS ON SITE. <br />STORM WATER POLLUTION AND EROSION CONTROL DEVICES ARE TO BE MODIFIED, AS NEEDED, AS THE <br />PROJECT PROGRESSES, THE DESIGN AND PLACEMENT OF THESE DEVICES IS THE RESPONSIBILITY OF THE <br />FIELD ENGINEER. PLANS REPRESENTING CHANGES MUST BE SUBMITTED FOR APPROVAL IF REQUESTED <br />BY THE BUILDING OFFICIAL. <br />EVERY EFFORT MUST BE MADE TO ELIMINATE THE DISCHARGE OF NONSTORM WATER FROM THE PROJECT <br />SITE AT ALL TIMES. <br />ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON-SITE AND MAY NOT BE <br />TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE COURSES, <br />OR WIND. <br />STOCKPILES OF EARTH AND OTHER CONSTRUCTION-RELATED MATERIALS MUST BE PROTECTED FROM <br />BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR WATER. <br />FUELS, OILS, SOLVENTS, AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH THEIR <br />LISTINGS AND ARE NOT TO CONTAMINATE THE SOILS AND SURFACE WATERS. ALL APPROVED STORAGE <br />CONTAINERS ARE TO BE PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP IMMEDIATELY <br />AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE DRAINAGE SYSTEM. <br />EXCESS OR WASTE CONCRETE MAY NOT BE WASTED INTO THE PUBLIC WAY OR ANY OTHER DRAINAGE <br />SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON-SITE UNTIL THEY CAN BE <br />DISPOSED OF AS SOLID WASTE. <br />TRASH AND CONSTRUCTION-RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED RECEPTACLE <br />TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND. <br />SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE <br />CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS FROM BEING <br />DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY <br />NOT BE WASHED DOWN BY RAIN OR OTHER MEANS. <br />ANY SLOPES WITH DISTURBED SOILS OR DENUDED OF VEGETATION MUST BE STABILIZED SO AS TO INHIBIT <br />EROSION BY WIND AND WATER. ALL WORK SHALL BE IN ACCORDANCE WITH THE EROSION CONTROL <br />PLANS. <br />EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE <br />DAILY RAINFALL PROBABILITY EXCEEDS 40%. <br />EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING <br />THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT <br />CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL <br />DEVICES AT ALL TIME. <br />CONTROLS SHALL BE SET UP AND MAINTAINED AS CONSTRUCTION PROCEEDS. ADJUSTMENTS TO THE <br />EROSION CONTROL PLANS ARE ALLOWABLE AS REQUIRED AND APPROVED BY CITY. <br />ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL IMPLEMENT STRUCTURAL AND <br />NONSTRUCTURAL BEST MANAGEMENT PRACTICES (BMPS) IN CONFORMANCE WITH THE GUIDELINES OF <br />THE CALIFORNIA STORM WATER BMP HANDBOOKS. <br />AFTER A RAINSTORM, ALL SEDIMENT AND DEBRIS SHALL BE REMOVED FROM STREETS, BERMS AND <br />DESILTING BASINS. ANY GRADED SLOPE SURFACE PROTECTION MEASURES DAMAGED DURING A <br />RAINSTORM SHALL BE IMMEDIATELY REPAIRED. <br />THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS <br />TO PREVENT TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATED A HAZARDOUS CONDITION. <br />EROSION AND SEDIMENT GENERAL NOTES: <br />12. <br />13. <br />10. <br />11. <br />7. <br />8. <br />9. <br />5. <br />6. <br />3. <br />4. <br />1. <br />2. <br />EROSION CONTROL <br />EC1 - SCHEDULING <br />EC2 - PRESERVATION OF EXISTING VEGETATION <br />EQUIPMENT TRACKING CONTROL <br />TC1 - STABILIZED CONSTRUCTION ENTRANCE EXIT <br />NON-STORMWATER MANAGEMENT <br />NS2 - DEWATERING OPERATIONS <br />NS3 - PAVING AND GRINDING OPERATIONS <br />NS12 - CONCRETE CURING <br />NS13 - CONCRETE FINISHING <br />NS14 - MATERIAL AND EQUIPMENT USE <br />TEMPORARY SEDIMENT CONTROL <br />SE1 - SILT FENCE <br />SE7 - STREET SWEEPING AND VACUUMING <br />SE8 - GRAVEL BAG BARRIER <br />WIND EROSION CONTROL <br />WE1 - WIND EROSION CONTROL <br />WASTE MANAGEMENT & MATERIAL <br />POLLUTION CONTROL <br />WM1 - MATERIAL DELIVERY AND STORAGE <br />WM2 - MATERIAL USE <br />WM3 - STOCKPILE MANAGEMENT <br />WM5 - SOLID WASTE MANAGEMENT <br />WM6 - HAZARDOUS WASTE MANAGEMENT <br />WM8 - CONCRETE WASTE MANAGEMENT <br />WM9 - SANITARY/SEPTIC WASTE MANAGEMENT <br />WM10 - LIQUID WASTE MANAGEMENT <br />1.SOIL/SLOPE STABILIZATION PRACTICES SHALL BE DESIGNED TO PRESERVE EXISTING VEGETATION WHERE <br />FEASIBLE AND TO REVEGETATE OPEN AREAS AS SOON AS FEASIBLE AFTER GRADING. THESE CONTROL <br />PRACTICES SHALL INCLUDE TEMPORARY SEEDING, PERMANENT SEEDING, MULCHING, SOD STABILIZATION, <br />VEGETATIVE BUFFER STRIPS, PROTECTION OF TREES, OR OTHER SOIL STABILIZATION PRACTICES. <br />2.SOIL STABILIZATION SHALL BE IMPLEMENTED ON ALL INACTIVE DISTURBED AREAS FROM NOVEMBER 1 THRU <br />APRIL 15 AND ON ALL DISTURBED AREAS DURING A RAIN EVENT OR POTENTIAL RAIN. <br />3.STABILIZATION PRACTICES SHALL CONTROL/PREVENT EROSION FROM THE FORCES OF WIND AND WATER. <br />4.STABILIZATION PRACTICES SHALL BE IMPLEMENTED IN CONJUNCTION WITH SEDIMENT TRAPPING/FILTERING <br />PRACTICES AND PRACTICES TO REDUCE THE TRACKING OF SEDIMENT ONTO PAVED ROADS. <br />5.WHEN USING STRAW MULCHING, THE MINIMUM APPLICATION SHALL BE 2 TONS/ACRE. MULCH MUST BE <br />ANCHORED IMMEDIATELY TO MINIMIZE LOSS BY WIND OR WATER. <br />6.WHEN USING HYDROSEEDING/MULCHING, THE MINIMUM APPLICATION OF WOOD FIBER SHALL BE 1,500 <br />LBS/ACRE,THAT DOES NOT CONTAIN MORE THAN 50 PERCENT NEWSPRINT. <br />7.FOR SEEDING RECOMMENDATIONS, USDA, NATURAL RESOURCES CONSERVATION SERVICE. <br />NOTES: <br />SEDIMENTS AND OTHER MATERIALS SHALL NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE <br />CONSTRUCTION ENTRANCE ROADWAYS SHALL BE STABILIZED SO AS TO PREVENT SEDIMENTS FROM BEING DEPOSITED <br />INTO THE PUBLIC ROADS. DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN <br />OR OTHER MEANS INTO THE STORM DRAIN SYSTEM. <br />STABILIZED CONSTRUCTION ENTRANCE SHALL BE: <br />A. LOCATED AT ANY POINT WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION <br /> SITE RD OR FROM A PUBLIC RIGHT OF WAY, STREET, ALLEY, AND SIDEWALK OR PARKING AREA. <br />B. A SERIES OF STEEL PLATES WITH "RUMBLE STRIPS", AND/OR MIN 4" COARSE AGGREGATE <br /> WITH LENGTH, WIDTH & THICKNESS AS NEEDED TO ADEQUATELY PREVENT ANY TRACKING ONTO <br /> PAVED SURFACES. <br />ADDING A WASH RACK WITH A SEDIMENT TRAP LARGE ENOUGH TO COLLECT ALL WASH WATER CAN GREATLY IMPROVE <br />EFFICIENCY. <br />ALL VEHICLES ACCESSING THE CONSTRUCTION SITE SHALL UTILIZE THE STABILIZED CONSTRUCTION ENTRANCE SITES. <br />REMOVE ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS IMMEDIATELY. <br />SWEEP PAVED AREAS THAT RECEIVE CONSTRUCTION TRAFFIC WHENEVER SEDIMENT BECOMES VISIBLE. <br />PAVEMENT WASHING WITH WATER IS PROHIBITED IF IT RESULTS IN A DISCHARGE TO THE STORM DRAIN SYSTEM. <br />REGULAR SWEEPING SCHEDULES SHALL BE SET UP, PARTICULARLY AFTER HEAVY RAINFALL OR CONSTRUCTION <br />ACTIVITIES, TO ADDRESS VISIBLE DEBRIS AND ENSURE THE ROADWAYS REMAIN CLEAR OF CONTAMINANTS. VACUUM <br />SWEEPERS, IN PARTICULAR, ARE HIGHLY EFFECTIVE AT COLLECTING FINE DUST AND PARTICLES THAT ARE HARDER TO <br />CAPTURE WITH TRADITIONAL MECHANICAL SWEEPERS. <br />STREET MAINTENANCE <br />CONSTRUCT THE SILT FENCE ALONG A LEVEL CONTOUR. <br />SILT FENCES SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREA IS PERMANENTLY STABILIZED. <br />PROVIDE SUFFICIENT ROOM FOR RUNOFF TO POND BEHIND THE FENCE AND ALLOW SEDIMENT <br />REMOVAL EQUIPMENT TO PASS BETWEEN THE SILT FENCE AND TOE OF SLOPE OR OTHER <br />OBSTRUCTIONS. ABOUT 1200 SQ. FT. OF PONDING AREA SHALL BE PROVIDED FOR EVERY ACRE <br />DRAINING TO THE FENCE. <br />TURN THE ENDS OF THE FILTER FENCE UPHILL TO PREVENT STORMWATER FROM FLOWING AROUND <br />THE FENCE. <br />LEAVE AN UNDISTURBED OR STABILIZED AREA IMMEDIATELY DOWNSLOPE FROM THE FENCE. <br />DO NOT PLACE IN LIVE STREAM OR INTERMITTENTLY FLOWING CHANNELS. <br />WHEN STANDARD FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED <br />SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY-DUTY WIRE STAPLES AT LEAST 1 <br />INCH LONG. TIE WIRES OR HOG RINGS. <br />NOTES: <br />SILT FENCE <br /> MAXIMUM <br />SLOPE <br />LENGTH <br />COMPACTED <br />BACKFILL <br />TURN LOST 6' OF <br />FENCE UP-SLOPE <br />MAXIM <br />U <br />M <br />WIDTH <br />= <br />5 <br />0 <br />0 <br />' <br />6" <br />6" <br />18 <br />" <br />MAXIMUM TRIBUTARY <br />AREA .25 ACRE/100FT <br />OF FENCE <br />SILT FENCE CONSTRUCTED <br />ALONG LEVEL CONTOUR <br />POST O <br />10" OC (MAX) <br />1. <br />FLOW <br />FILTER FABRIC <br />1. <br />2. <br />3. <br />4. <br />3 EROSION CONTROL <br />4 STABILIZED CONSTRUCTION ENTRANCE / EXIT PER TC-1 <br />14. <br />15. <br />16. <br />17. <br />18. <br />19. <br />30 <br />1. <br />2. <br />3. <br />DIRT AND OTHER CONSTRUCTION RELATED MATERIALS PLACED IN THE STREET OR ON OTHER IMPERVIOUS SURFACES <br />MUST BE CONTAINED WITH SANDBAGS OR OTHER MEASURES TO PREVENT TRANSPORT TO THE STORMDRAIN SYSTEM. <br />ANY CONSTRUCTION MATERIAL STORED OR STOCKPILED ON-SITE SHALL BE PROTECTED FROM BEING TRANSPORTED <br />BY THE FORCE OF WIND OR WATER. <br />GRAVEL BAGS <br />PLACE TIGHTLY TOGETHER <br />ALL AROUND MATERIAL <br />1. <br />2. <br />NOTES: <br />STOCKPILED MATERIAL <br />AS THE PROJECT OWNER OR AUTHORIZED AGENT OF THE OWNER, I HAVE READ AND <br />UNDERSTAND THE REQUIREMENTS TO CONTROL STORM WATER POLLUTION FROM <br />SEDIMENTS, EROSION, AND CONSTRUCTION MATERIALS, AND I CERTIFY THAT I WILL <br />COMPLY WITH THESE REQUIREMENTS. I, OR MY REPRESENTATIVE, CONTRACTOR, <br />DEVELOPER, OR ENGINEER, WILL MAKE CERTAIN THAT ALL BMP'S SHOWN ON THIS PLAN <br />WILL BE FULLY IMPLEMENTED, AND ALL EROSION CONTROL DEVICES WILL BE KEPT CLEAN <br />AND FUNCTIONING. PERIODIC INSPECTIONS OF THE BMPs WILL BE CONDUCTED AND A <br />CURRENT LOG, SPECIFYING THE EXACT NATURE OF THE INSPECTION AND ANY REMEDIAL <br />MEASURES, WILL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES AND WILL BE <br />AVAILABLE FOR THE REVIEW BY THE BUILDING OFFICIAL. <br />AS THE PROJECT OWNER OR AUTHORIZED AGENT OF THE OWNER, "I CERTIFY THAT THIS <br />DOCUMENT AND ALL ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR <br />SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED <br />PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED. BASED <br />ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE THE SYSTEM OR THOSE <br />PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION, TO THE BEST OF <br />MY KNOWLEDGE AND BELIEF, THE INFORMATION SUBMITTED IS TRUE, ACCURATE, AND <br />COMPLETE. I AM AWARE THAT SUBMITTING FALSE AND/OR INACCURATE INFORMATION, <br />FAILING TO UPDATE THE LOCAL SWPPP TO REFLECT CURRENT CONDITIONS, OR FAILING <br />TO PROPERLY AND/OR ADEQUATELY IMPLEMENT THE LOCAL SWPPP MAY RESULT IN <br />REVOCATION OF GRADING AND/OR OTHER PERMITS OR OTHER SANCTIONS PROVIDED BY <br />THE LAW." <br />OWNER OR AUTHORIZED REPRESENTATIVE (PERMITEE) DATE <br />OWNER STATEMENT OF UNDERSTANDING: <br />STATEMENT OF UNDERSTANDING <br />NOTES: <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />7 <br />COMPACTED <br />BACKFILL <br />NOT TO SCALE <br />NOT TO SCALE <br />MATERIAL STORAGE PER WM-3 <br />NOT TO SCALE5 <br />6 SILT FENCE PER SE-1 <br />NOT TO SCALE <br />2 GRAVEL BAG DETAIL <br />NOT TO SCALE <br />A <br />SECTION A-A <br />A <br />3" MIN OPENING BETWEEN <br />TOP ROW BAGS <br />20. <br />21. <br />22. <br />4. <br />FILE NO.:TENANT IMPROVEMENT PLAN <br />PROJECT LIMITS <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />REVISIONS REFERENCES <br />NUMBER DATE INITIALS DESCRIPTION APPROVED INSTALLED <br />CONSTRUCTION COMPLETED:SHEET _ OF 8 <br />BENCHMARK NO.:ELEV.: <br />DATE <br />08/2024DESIGNED: AL DRAWN: RF CHECKED: TD <br />08/2024 <br />RECOMMENDED FOR <br />CONSTRUCTION: <br />REVIEWED FOR <br />CONSTRUCTABILITY: <br />PRINCIPAL CIVIL ENGINEER <br />08/2024 <br />PRINCIPAL CIVIL ENGINEER <br />PREPARED UNDER <br />THE SUPERVISION <br />OF: <br />RCE NO.:36079 <br />RCE NO.: <br />SENIOR CIVIL ENGINEER <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />O <br />. <br /> <br />Y <br />Y <br />- <br />N <br />N <br />N <br />N <br />: <br /> <br />1 <br />0 <br />0 <br />1 <br /> <br />S <br /> <br />G <br />R <br />A <br />N <br />D <br /> <br />A <br />V <br />E <br />. <br />EROSION CONTROL PLAN <br />8 <br />NARESH ARAYA 11/26/2024 <br />C-5.1 <br />HANK (ALL STAR PAVING CO.) <br />(714) 835-9177 <br />Behrooz Sarlak 4/7/2025