IN CASE OF EMERGENCY, CALL: CONTRACTOR NAME ___________________________.
<br />PHONE NUMBER:_________________.
<br />A STAND-BY CREW FOR EMERGENCY WORK SHALL BE AVAILABLE AT ALL TIMES DURING THE RAINY
<br />SEASON (NOVEMBER 1 TO APRIL 15). NECESSARY MATERIALS SHALL BE AVAILABLE ON-SITE AND
<br />STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF EMERGENCY DEVICES
<br />WHEN RAIN IS IMMINENT.
<br />EROSION CONTROL DEVICES SHOWN ON THIS PLAN MAY BE REMOVED WHEN APPROVED BY THE BUILDING
<br />OFFICIAL IF THE GRADING OPERATION HAS PROGRESSED TO THE POINT WHERE THEY ARE NO LONGER
<br />REQUIRED.
<br />GRADED AREAS ADJACENT TO FILL SLOPES LOCATED AT THE SITE PERIMETER MUST DRAIN AWAY FROM
<br />THE TOP OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. ALL LOOSE SOILS AND DEBRIS THAT
<br />MAY CREATE A POTENTIAL HAZARD TO OFF-SITE PROPERTY SHALL BE STABILIZED OR REMOVED FROM
<br />THE SITE ON A DAILY BASIS.
<br />ALL SILT AND DEBRIS SHALL BE REMOVED FROM ALL DEVICES WITHIN 24 HOURS AFTER EACH RAINSTORM
<br />AND BE DISPOSED OF PROPERLY.
<br />A GUARD SHALL BE POSTED ON SITE WHEREVER THE DEPTH OF WATER IN ANY DEVICE EXCEEDS TWO
<br />FEET. THE DEVICE SHALL BE DRAINED OR PUMPED DRY WITHIN 24 HOURS AFTER EACH RAINSTORM.
<br />PUMPING AND DRAINING OF ALL BASINS AND DRAINAGE DEVICES MUST COMPLY WITH THE APPROPRIATE
<br />BMP FOR DEWATERING OPERATIONS.
<br />THE PLACEMENT OF ADDITIONAL DEVICES TO REDUCE EROSION DAMAGE AND CONTAIN POLLUTANTS
<br />WITHIN THE SITE IS LEFT TO THE DISCRETION OF THE QSP. ADDITIONAL DEVICES AS NEEDED SHALL BE
<br />INSTALLED TO RETAIN SEDIMENTS AND OTHER POLLUTANTS ON SITE.
<br />STORM WATER POLLUTION AND EROSION CONTROL DEVICES ARE TO BE MODIFIED, AS NEEDED, AS THE
<br />PROJECT PROGRESSES, THE DESIGN AND PLACEMENT OF THESE DEVICES IS THE RESPONSIBILITY OF THE
<br />FIELD ENGINEER. PLANS REPRESENTING CHANGES MUST BE SUBMITTED FOR APPROVAL IF REQUESTED
<br />BY THE BUILDING OFFICIAL.
<br />EVERY EFFORT MUST BE MADE TO ELIMINATE THE DISCHARGE OF NONSTORM WATER FROM THE PROJECT
<br />SITE AT ALL TIMES.
<br />ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON-SITE AND MAY NOT BE
<br />TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE COURSES,
<br />OR WIND.
<br />STOCKPILES OF EARTH AND OTHER CONSTRUCTION-RELATED MATERIALS MUST BE PROTECTED FROM
<br />BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR WATER.
<br />FUELS, OILS, SOLVENTS, AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH THEIR
<br />LISTINGS AND ARE NOT TO CONTAMINATE THE SOILS AND SURFACE WATERS. ALL APPROVED STORAGE
<br />CONTAINERS ARE TO BE PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP IMMEDIATELY
<br />AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE DRAINAGE SYSTEM.
<br />EXCESS OR WASTE CONCRETE MAY NOT BE WASTED INTO THE PUBLIC WAY OR ANY OTHER DRAINAGE
<br />SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON-SITE UNTIL THEY CAN BE
<br />DISPOSED OF AS SOLID WASTE.
<br />TRASH AND CONSTRUCTION-RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED RECEPTACLE
<br />TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND.
<br />SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE
<br />CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS FROM BEING
<br />DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY
<br />NOT BE WASHED DOWN BY RAIN OR OTHER MEANS.
<br />ANY SLOPES WITH DISTURBED SOILS OR DENUDED OF VEGETATION MUST BE STABILIZED SO AS TO INHIBIT
<br />EROSION BY WIND AND WATER. ALL WORK SHALL BE IN ACCORDANCE WITH THE EROSION CONTROL
<br />PLANS.
<br />EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE
<br />DAILY RAINFALL PROBABILITY EXCEEDS 40%.
<br />EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING
<br />THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT
<br />CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL
<br />DEVICES AT ALL TIME.
<br />CONTROLS SHALL BE SET UP AND MAINTAINED AS CONSTRUCTION PROCEEDS. ADJUSTMENTS TO THE
<br />EROSION CONTROL PLANS ARE ALLOWABLE AS REQUIRED AND APPROVED BY CITY.
<br />ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL IMPLEMENT STRUCTURAL AND
<br />NONSTRUCTURAL BEST MANAGEMENT PRACTICES (BMPS) IN CONFORMANCE WITH THE GUIDELINES OF
<br />THE CALIFORNIA STORM WATER BMP HANDBOOKS.
<br />AFTER A RAINSTORM, ALL SEDIMENT AND DEBRIS SHALL BE REMOVED FROM STREETS, BERMS AND
<br />DESILTING BASINS. ANY GRADED SLOPE SURFACE PROTECTION MEASURES DAMAGED DURING A
<br />RAINSTORM SHALL BE IMMEDIATELY REPAIRED.
<br />THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS
<br />TO PREVENT TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATED A HAZARDOUS CONDITION.
<br />EROSION AND SEDIMENT GENERAL NOTES:
<br />12.
<br />13.
<br />10.
<br />11.
<br />7.
<br />8.
<br />9.
<br />5.
<br />6.
<br />3.
<br />4.
<br />1.
<br />2.
<br />EROSION CONTROL
<br />EC1 - SCHEDULING
<br />EC2 - PRESERVATION OF EXISTING VEGETATION
<br />EQUIPMENT TRACKING CONTROL
<br />TC1 - STABILIZED CONSTRUCTION ENTRANCE EXIT
<br />NON-STORMWATER MANAGEMENT
<br />NS2 - DEWATERING OPERATIONS
<br />NS3 - PAVING AND GRINDING OPERATIONS
<br />NS12 - CONCRETE CURING
<br />NS13 - CONCRETE FINISHING
<br />NS14 - MATERIAL AND EQUIPMENT USE
<br />TEMPORARY SEDIMENT CONTROL
<br />SE1 - SILT FENCE
<br />SE7 - STREET SWEEPING AND VACUUMING
<br />SE8 - GRAVEL BAG BARRIER
<br />WIND EROSION CONTROL
<br />WE1 - WIND EROSION CONTROL
<br />WASTE MANAGEMENT & MATERIAL
<br />POLLUTION CONTROL
<br />WM1 - MATERIAL DELIVERY AND STORAGE
<br />WM2 - MATERIAL USE
<br />WM3 - STOCKPILE MANAGEMENT
<br />WM5 - SOLID WASTE MANAGEMENT
<br />WM6 - HAZARDOUS WASTE MANAGEMENT
<br />WM8 - CONCRETE WASTE MANAGEMENT
<br />WM9 - SANITARY/SEPTIC WASTE MANAGEMENT
<br />WM10 - LIQUID WASTE MANAGEMENT
<br />1.SOIL/SLOPE STABILIZATION PRACTICES SHALL BE DESIGNED TO PRESERVE EXISTING VEGETATION WHERE
<br />FEASIBLE AND TO REVEGETATE OPEN AREAS AS SOON AS FEASIBLE AFTER GRADING. THESE CONTROL
<br />PRACTICES SHALL INCLUDE TEMPORARY SEEDING, PERMANENT SEEDING, MULCHING, SOD STABILIZATION,
<br />VEGETATIVE BUFFER STRIPS, PROTECTION OF TREES, OR OTHER SOIL STABILIZATION PRACTICES.
<br />2.SOIL STABILIZATION SHALL BE IMPLEMENTED ON ALL INACTIVE DISTURBED AREAS FROM NOVEMBER 1 THRU
<br />APRIL 15 AND ON ALL DISTURBED AREAS DURING A RAIN EVENT OR POTENTIAL RAIN.
<br />3.STABILIZATION PRACTICES SHALL CONTROL/PREVENT EROSION FROM THE FORCES OF WIND AND WATER.
<br />4.STABILIZATION PRACTICES SHALL BE IMPLEMENTED IN CONJUNCTION WITH SEDIMENT TRAPPING/FILTERING
<br />PRACTICES AND PRACTICES TO REDUCE THE TRACKING OF SEDIMENT ONTO PAVED ROADS.
<br />5.WHEN USING STRAW MULCHING, THE MINIMUM APPLICATION SHALL BE 2 TONS/ACRE. MULCH MUST BE
<br />ANCHORED IMMEDIATELY TO MINIMIZE LOSS BY WIND OR WATER.
<br />6.WHEN USING HYDROSEEDING/MULCHING, THE MINIMUM APPLICATION OF WOOD FIBER SHALL BE 1,500
<br />LBS/ACRE,THAT DOES NOT CONTAIN MORE THAN 50 PERCENT NEWSPRINT.
<br />7.FOR SEEDING RECOMMENDATIONS, USDA, NATURAL RESOURCES CONSERVATION SERVICE.
<br />NOTES:
<br />SEDIMENTS AND OTHER MATERIALS SHALL NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE
<br />CONSTRUCTION ENTRANCE ROADWAYS SHALL BE STABILIZED SO AS TO PREVENT SEDIMENTS FROM BEING DEPOSITED
<br />INTO THE PUBLIC ROADS. DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN
<br />OR OTHER MEANS INTO THE STORM DRAIN SYSTEM.
<br />STABILIZED CONSTRUCTION ENTRANCE SHALL BE:
<br />A. LOCATED AT ANY POINT WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION
<br /> SITE RD OR FROM A PUBLIC RIGHT OF WAY, STREET, ALLEY, AND SIDEWALK OR PARKING AREA.
<br />B. A SERIES OF STEEL PLATES WITH "RUMBLE STRIPS", AND/OR MIN 4" COARSE AGGREGATE
<br /> WITH LENGTH, WIDTH & THICKNESS AS NEEDED TO ADEQUATELY PREVENT ANY TRACKING ONTO
<br /> PAVED SURFACES.
<br />ADDING A WASH RACK WITH A SEDIMENT TRAP LARGE ENOUGH TO COLLECT ALL WASH WATER CAN GREATLY IMPROVE
<br />EFFICIENCY.
<br />ALL VEHICLES ACCESSING THE CONSTRUCTION SITE SHALL UTILIZE THE STABILIZED CONSTRUCTION ENTRANCE SITES.
<br />REMOVE ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS IMMEDIATELY.
<br />SWEEP PAVED AREAS THAT RECEIVE CONSTRUCTION TRAFFIC WHENEVER SEDIMENT BECOMES VISIBLE.
<br />PAVEMENT WASHING WITH WATER IS PROHIBITED IF IT RESULTS IN A DISCHARGE TO THE STORM DRAIN SYSTEM.
<br />REGULAR SWEEPING SCHEDULES SHALL BE SET UP, PARTICULARLY AFTER HEAVY RAINFALL OR CONSTRUCTION
<br />ACTIVITIES, TO ADDRESS VISIBLE DEBRIS AND ENSURE THE ROADWAYS REMAIN CLEAR OF CONTAMINANTS. VACUUM
<br />SWEEPERS, IN PARTICULAR, ARE HIGHLY EFFECTIVE AT COLLECTING FINE DUST AND PARTICLES THAT ARE HARDER TO
<br />CAPTURE WITH TRADITIONAL MECHANICAL SWEEPERS.
<br />STREET MAINTENANCE
<br />CONSTRUCT THE SILT FENCE ALONG A LEVEL CONTOUR.
<br />SILT FENCES SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREA IS PERMANENTLY STABILIZED.
<br />PROVIDE SUFFICIENT ROOM FOR RUNOFF TO POND BEHIND THE FENCE AND ALLOW SEDIMENT
<br />REMOVAL EQUIPMENT TO PASS BETWEEN THE SILT FENCE AND TOE OF SLOPE OR OTHER
<br />OBSTRUCTIONS. ABOUT 1200 SQ. FT. OF PONDING AREA SHALL BE PROVIDED FOR EVERY ACRE
<br />DRAINING TO THE FENCE.
<br />TURN THE ENDS OF THE FILTER FENCE UPHILL TO PREVENT STORMWATER FROM FLOWING AROUND
<br />THE FENCE.
<br />LEAVE AN UNDISTURBED OR STABILIZED AREA IMMEDIATELY DOWNSLOPE FROM THE FENCE.
<br />DO NOT PLACE IN LIVE STREAM OR INTERMITTENTLY FLOWING CHANNELS.
<br />WHEN STANDARD FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED
<br />SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY-DUTY WIRE STAPLES AT LEAST 1
<br />INCH LONG. TIE WIRES OR HOG RINGS.
<br />NOTES:
<br />SILT FENCE
<br /> MAXIMUM
<br />SLOPE
<br />LENGTH
<br />COMPACTED
<br />BACKFILL
<br />TURN LOST 6' OF
<br />FENCE UP-SLOPE
<br />MAXIM
<br />U
<br />M
<br />WIDTH
<br />=
<br />5
<br />0
<br />0
<br />'
<br />6"
<br />6"
<br />18
<br />"
<br />MAXIMUM TRIBUTARY
<br />AREA .25 ACRE/100FT
<br />OF FENCE
<br />SILT FENCE CONSTRUCTED
<br />ALONG LEVEL CONTOUR
<br />POST O
<br />10" OC (MAX)
<br />1.
<br />FLOW
<br />FILTER FABRIC
<br />1.
<br />2.
<br />3.
<br />4.
<br />3 EROSION CONTROL
<br />4 STABILIZED CONSTRUCTION ENTRANCE / EXIT PER TC-1
<br />14.
<br />15.
<br />16.
<br />17.
<br />18.
<br />19.
<br />30
<br />1.
<br />2.
<br />3.
<br />DIRT AND OTHER CONSTRUCTION RELATED MATERIALS PLACED IN THE STREET OR ON OTHER IMPERVIOUS SURFACES
<br />MUST BE CONTAINED WITH SANDBAGS OR OTHER MEASURES TO PREVENT TRANSPORT TO THE STORMDRAIN SYSTEM.
<br />ANY CONSTRUCTION MATERIAL STORED OR STOCKPILED ON-SITE SHALL BE PROTECTED FROM BEING TRANSPORTED
<br />BY THE FORCE OF WIND OR WATER.
<br />GRAVEL BAGS
<br />PLACE TIGHTLY TOGETHER
<br />ALL AROUND MATERIAL
<br />1.
<br />2.
<br />NOTES:
<br />STOCKPILED MATERIAL
<br />AS THE PROJECT OWNER OR AUTHORIZED AGENT OF THE OWNER, I HAVE READ AND
<br />UNDERSTAND THE REQUIREMENTS TO CONTROL STORM WATER POLLUTION FROM
<br />SEDIMENTS, EROSION, AND CONSTRUCTION MATERIALS, AND I CERTIFY THAT I WILL
<br />COMPLY WITH THESE REQUIREMENTS. I, OR MY REPRESENTATIVE, CONTRACTOR,
<br />DEVELOPER, OR ENGINEER, WILL MAKE CERTAIN THAT ALL BMP'S SHOWN ON THIS PLAN
<br />WILL BE FULLY IMPLEMENTED, AND ALL EROSION CONTROL DEVICES WILL BE KEPT CLEAN
<br />AND FUNCTIONING. PERIODIC INSPECTIONS OF THE BMPs WILL BE CONDUCTED AND A
<br />CURRENT LOG, SPECIFYING THE EXACT NATURE OF THE INSPECTION AND ANY REMEDIAL
<br />MEASURES, WILL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES AND WILL BE
<br />AVAILABLE FOR THE REVIEW BY THE BUILDING OFFICIAL.
<br />AS THE PROJECT OWNER OR AUTHORIZED AGENT OF THE OWNER, "I CERTIFY THAT THIS
<br />DOCUMENT AND ALL ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR
<br />SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED
<br />PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED. BASED
<br />ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE THE SYSTEM OR THOSE
<br />PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION, TO THE BEST OF
<br />MY KNOWLEDGE AND BELIEF, THE INFORMATION SUBMITTED IS TRUE, ACCURATE, AND
<br />COMPLETE. I AM AWARE THAT SUBMITTING FALSE AND/OR INACCURATE INFORMATION,
<br />FAILING TO UPDATE THE LOCAL SWPPP TO REFLECT CURRENT CONDITIONS, OR FAILING
<br />TO PROPERLY AND/OR ADEQUATELY IMPLEMENT THE LOCAL SWPPP MAY RESULT IN
<br />REVOCATION OF GRADING AND/OR OTHER PERMITS OR OTHER SANCTIONS PROVIDED BY
<br />THE LAW."
<br />OWNER OR AUTHORIZED REPRESENTATIVE (PERMITEE) DATE
<br />OWNER STATEMENT OF UNDERSTANDING:
<br />STATEMENT OF UNDERSTANDING
<br />NOTES:
<br />2.
<br />3.
<br />4.
<br />5.
<br />6.
<br />7.
<br />7
<br />COMPACTED
<br />BACKFILL
<br />NOT TO SCALE
<br />NOT TO SCALE
<br />MATERIAL STORAGE PER WM-3
<br />NOT TO SCALE5
<br />6 SILT FENCE PER SE-1
<br />NOT TO SCALE
<br />2 GRAVEL BAG DETAIL
<br />NOT TO SCALE
<br />A
<br />SECTION A-A
<br />A
<br />3" MIN OPENING BETWEEN
<br />TOP ROW BAGS
<br />20.
<br />21.
<br />22.
<br />4.
<br />FILE NO.:TENANT IMPROVEMENT PLAN
<br />PROJECT LIMITS
<br />CITY OF SANTA ANA
<br />PUBLIC WORKS AGENCY
<br />REVISIONS REFERENCES
<br />NUMBER DATE INITIALS DESCRIPTION APPROVED INSTALLED
<br />CONSTRUCTION COMPLETED:SHEET _ OF 8
<br />BENCHMARK NO.:ELEV.:
<br />DATE
<br />08/2024DESIGNED: AL DRAWN: RF CHECKED: TD
<br />08/2024
<br />RECOMMENDED FOR
<br />CONSTRUCTION:
<br />REVIEWED FOR
<br />CONSTRUCTABILITY:
<br />PRINCIPAL CIVIL ENGINEER
<br />08/2024
<br />PRINCIPAL CIVIL ENGINEER
<br />PREPARED UNDER
<br />THE SUPERVISION
<br />OF:
<br />RCE NO.:36079
<br />RCE NO.:
<br />SENIOR CIVIL ENGINEER
<br />PR
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />N
<br />O
<br />.
<br />
<br />Y
<br />Y
<br />-
<br />N
<br />N
<br />N
<br />N
<br />:
<br />
<br />1
<br />0
<br />0
<br />1
<br />
<br />S
<br />
<br />G
<br />R
<br />A
<br />N
<br />D
<br />
<br />A
<br />V
<br />E
<br />.
<br />EROSION CONTROL PLAN
<br />8
<br />NARESH ARAYA 11/26/2024
<br />C-5.1
<br />HANK (ALL STAR PAVING CO.)
<br />(714) 835-9177
<br />Behrooz Sarlak 4/7/2025
|