Laserfiche WebLink
ELECTRICAL <br />SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />ANSI B <br />11" X 17" <br />Signature with Seal <br />PROJECT NAME & ADDRESS <br />ESPV-0A <br />DATE: 09/26/2024 <br />61 <br />7 <br /> S <br /> <br />B <br />R <br />O <br />A <br />D <br />W <br />A <br />Y <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />CA <br /> 92 <br />7 <br />0 <br />1 <br />, <br /> <br />U <br />S <br />A <br />ZA <br />B <br />A <br />L <br />E <br />T <br />A <br />, <br /> <br />G <br />R <br />A <br />C <br />I <br />E <br />L <br />A <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />PH <br /> <br />N <br />O <br />. <br /> <br />(9 <br />4 <br />9 <br />) <br /> <br />3 <br />0 <br />3 <br />- <br />9 <br />0 <br />9 <br />3 <br />REVDATEDESCRIPTION <br />REVISIONS <br />EM <br />A <br />I <br />L <br /> <br />I <br />D <br />: <br /> <br />za <br />v <br />a <br />l <br />e <br />t <br />a <br />p <br />3 <br />4 <br />8 <br />@ <br />g <br />m <br />a <br />i <br />l <br />. <br />c <br />o <br />m <br />SUNNOVA ENERGY <br />CORPORATION <br />20 GREENWAY PLAZA, SUITE 475 <br />HOUSTON, TX 77046 <br />P: 281.985.9900 <br />L: 1003498 <br />A08/24/2024REVISION <br />B09/26/2024REVISION <br />ELECTRICAL NOTES: <br />·THE EQUIPMENT AND ALL ASSOCIATED WIRING AND INTERCONNECTION SHALL BE INSTALLED ONLY BY QUALIFIED PEOPLE. A QUALIFIED PERSON IS ONE WHO HAS SKILLS <br />AND KNOWLEDGE RELATED TO THE CONSTRUCTION AND OPERATION OF THE ELECTRICAL EQUIPMENT AND INSTALLATIONS AND HAS RECEIVED SAFETY TRAINING TO <br />RECOGNIZE AND AVOID THE HAZARDS INVOLVED. (CEC 690.4(E) AND 705.6) <br />·LOCAL UTILITY PROVIDER SHALL BE NOTIFIED PRIOR TO USE AND ACTIVATION OF ANY SOLAR PHOTOVOLTAIC INSTALLATION. FOR A LINE SIDE TAP CONNECTION, UTILITY <br />NEEDS TO BE NOTIFIED WELL IN ADVANCE TO COORDINATE BUILDING ELECTRICAL SHUT OFF. <br />·NEW CONDUIT ROUTING SHOWN IS ESSENTIALLY SCHEMATIC. SUBCONTRACTOR SHALL LAY OUT RUNS TO SUIT FIELD CONDITIONS AND THE COORDINATION REQUIREMENTS <br />OF OTHER TRADES. <br />·ARRAY WIRING SHOULD NOT BE READILY ACCESSIBLE EXCEPT TO QUALIFIED PERSONNEL. <br />·ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES SHALL BE WATERTIGHT AND APPROVED FOR USE IN WET LOCATIONS. (CEC 314.15A). <br />·WIRING METHODS FOR PV SYSTEM CONDUCTORS AREN'T PERMITTED WITHIN 10 IN. OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE LOCATED DIRECTLY BELOW THE <br />ROOF SURFACE THAT'S COVERED BY PV MODULES AND ASSOCIATED EQUIPMENT WIRING <br />·BACK-FED BREAKER MUST BE AT THE OPPOSITE END OF BUS BAR FROM THE MAIN BREAKER OR MAIN LUG SUPPLYING CURRENT FROM THE UTILITIES. <br />·ALL CONDUCTORS AND WIRE TIES EXPOSED TO SUNLIGHT ARE LISTED AS UV RESISTANT. <br />·CONTRACTOR SHALL FOLLOW ALL ELECTRICAL EQUIPMENT LABELING REQUIREMENTS IN CEC 690 AND CFC 2022 <br />·PV SOURCE, OUTPUT AND INVERTER CIRCUITS SHALL BE IDENTIFIED AT ALL POINTS OF TERMINATION, CONNECTION, AND SPLICES. THE MEANS OF ID CAN BE SEPARATE <br />COLOR CODING, MARKING TAPE, TAGGING ETC. (CEC 690.4). <br />·MEASURE THE LINE-TO-LINE AND LINE-TO-NEUTRAL VOLTAGE OF ALL SERVICE ENTRANCE CONDUCTORS PROIR TO INSTALLING ANY SOLAR EQUIPMENT. THE VOLTAGES FOR <br />THE 240 V AC RATED. <br />NOTES <br />617 S Broadway <br />2/25/2025