Laserfiche WebLink
CITY OF SANTA ANA <br />Planning and Building Agency <br />STATE OF CALIFORNIA <br />Sign Lighting <br />ADDroved <br />CALIFORNIA EIJE,YgUANCE <br />CERTIFICATE OF COMPLIANCE <br />NRCC-LTS-E <br />Project Name: FRESENIUS <br />Report Page: <br />(Page 3 of 4) <br />600 West Santa Ana Blvd #111, SANTA ANA , CA 92701. <br />1Date Prepared: 2025 <br />9:29 05:00 <br />G. LIGHT SOURCES AND CONTROLS <br />This table includes illuminated signs using the Alternate Lighting Sources compliance method per 140.8(by 170.2(e) as indicated on Table B of this compliance document. It also <br />demonstrates compliance with mandatory controls requirements from 130.3 / 160.5(d) by indicating control types for each sign. <br />01 <br />02 <br />03 <br />04 <br />05 <br />Mandatory Controls <br />Field Inspector <br />Name or Item Tag <br />Complete Sign Description <br />Compliant Light Sources',' <br />Demand <br />Shut -Off <br />Dimming <br />Response s <br />Pass <br />Fail <br />Astronomical <br />NA: Illuminated <br />1 <br />CHANNEL LETTER WALL SIGN <br />LED + pwr supply 80%+ eff. <br />Time Switch <br /><1 hour during <br />❑ <br />❑ <br />(outdoor) <br />day <br />* NOTES: Controls with a * require a note in the space below explaining how compliance is achieved. EX: Sign within tunnel illuminated day and night, • EXCEPTION to 130.342A. <br />'FOOTNOTE: Dropdown choices have been abbreviated, please refer to 140.8(b) / 170.2(e) to confirm compliance with the specific light source technologies listed. <br />2 Authority having jurisdiction may ask for cutsheets to confirm compliance of light source. <br />3 Demand response controls are only required for on Electronic Message Center having anew connected lighting power load greater than 15 kW per 110.12(d). <br />I. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION <br />Selections have been made based on information provided in this document. If any selection have been changed by permit applicant an explanation should be included in Table E. <br />Additional Remarks. These documents must be provided to the building inspector during construction and can be found online <br />Form/Title <br />NRCI-LTS-E - Must be submitted for all buildings <br />J. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE <br />There are no forms required for this project. <br />Generated Date/Time: <br />Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Compliance ID: 277549-0225-0002 <br />Schema Version: rev 20220101 Report Generated: 2025-02-2811:17:32 <br />