My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
509 S Starboard Street - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Starboard St
>
509 S Starboard St
>
509 S Starboard Street - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:17:30 PM
Creation date
6/6/2025 1:16:59 PM
Metadata
Fields
Template:
Plan
Permit Number
20183762
101120511
Full Address
509 S Starboard St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOMEOWNER:ANDY NGUYEN <br />PH: 714.200.4535 <br />ADDRESS:509 S. STARBOARD STREET <br />SANTA ANA, CA 92704 <br />DATE: 7/24/24 <br />ING ELECTRIC INC. <br />1451 DOMINGUEZ RANCH ROAD <br />CORONA, CA 92882 <br />PH: 951.399.2555 <br />ING ELECTRIC INC. C10 - 1048140 <br />CE R <br />INSTALL (6) APTOS DNA-120-MF10-440W SOLAR ELECTRIC MODULES AND <br />(6) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY <br />COMPOSITION ROOF IN ADDITION TO AN EXISTING SYSTEM. REPLACE EXISTING <br />INVERTER WITH (1) SOLAREDGE ENERGY HUB SE7600H-US INVERTER WITH <br />INTEGRATED DC DISCONNECT, (1) DC DISCONNECT, AND INSTALL (1) LG CHEM <br />RESU 16H PRIME BATTERY, AND REWIRE THROUGH EXISTING SYSTEM. <br />EET <br /> <br />PLANS PREPARED BY: <br />JENNIFER KEMME <br />PH: 909.748.1300 <br />99523PV4 <br />TE IGNGETE IGNGE <br />ALL SIGNAGE SHALL BE REFLECTIVE, UV RESISTANT <br />PLASTIC, RED IN COLOR WITH WHITE LETTERING, AND <br />ATTACHED WITH WEATHERPROOF ADHESIVE OR <br />OTHER APPROVED METHOD. ALL LETTERS SHALL BE A <br />MINIMUM OF 3 8" HEIGHT AND ALL CAPITALIZED. <br />ALL CONDUIT, JUNCTION BOXES AND OTHER ENCLOSURES <br />SHALL BE MARKED AT 10' MAX INTERVALS AND AT ALL <br />BENDS, TERMINATIONS, SPLICES OR CONNECTIONS WITH <br />"WARNING: PHOTOVOLTAIC POWER SOURCE". <br />WARNING <br />ELECTRIC SHOCK HAZARD <br />DO NOT TOUCH TERMINALS <br />TERMINALS ON BOTH THE LINE <br />AND LOAD SIDES MAY BE ENERGIZED <br />IN THE OPEN POSITION <br />TO BE INSTALLED AT ALL SERVICEABLE PANELS <br />OR BOXES AND AT ALL DISCONNECTS: <br />WARNING <br />ELECTRIC SHOCK HAZARD <br />THE DC CONDUCTORS OF THIS <br />PHOTOVOLTAIC SYSTEM ARE <br />UNGROUNDED MAY BE ENERGIZED <br />CAUTION: MULTIPLE <br />SOURCES OF POWER <br />POWER TO THIS BUILDING IS ALSO <br />SUPPLIED FROM THE FOLLOWING SOURCES <br />WITH DISCONNECTS AS SHOWN. <br />ADDRESS: 509 S. STARBOARD STREET, SANTA ANA, CA 92704 <br />N <br />TO BE INSTALLED ON THE OUTSIDE COVER <br />OF THE MAIN SERVICE DISCONNECT: <br />PV SOLAR DC DISCONNECT <br />MAXIMUM VOLTAGE = 480.00 V <br />MAXIMUM CIRCUIT CURRENT = 30.00 A <br />MAXIMUM RATED OUTPUT CURRENT OF THE <br />DC-TO-DC CONVERTER = 15.00 A <br />TO BE INSTALLED ON THE <br />FRONT OF THE NEW DC DISCONNECT: <br />RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM <br />AC OUTPUT CURRENT = 32.00 A <br />NOMINAL OPERATING AC VOLTAGE = 240 V <br />TO BE INSTALLED ON THE <br />FRONT OF THE AC DISCONNECT: <br />WARNING <br />POWER SOURCE OUTPUT CONNECTION - <br />DO NOT RELOCATE THIS OVERCURRENT DEVICE <br />TO BE INSTALLED AT THE BACKFED <br />BREAKER SERVING THE PV SOLAR SYSTEM: <br />TURN RAPID SHUTDOWN <br />SWITCH TO THE <br />"OFF" POSITION TO <br />SHUT DOWN PV SYSTEM <br />AND REDUCE <br />SHOCK HAZARD <br />IN THE ARRAY <br />SOLAR ELECTRIC <br />PV PANELS <br />SOLAR PV SYSTEM EQUIPPED <br />WITH RAPID SHUTDOWN <br />TO BE INSTALLED ON THE FRONT OF THE MAIN SERVICE DISCONNECT: <br />"SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN" SHALL BE <br />BLACK LETTERING ON YELLOW BACKGROUND. THE REMAINDER OF <br />THE SIGN SHALL BE BLACK LETTERING ON WHITE BACKGROUND. <br />WARNING <br />ARC FLASH AND SHOCK HAZARD <br />APPROPRIATE PPE REQUIRED <br />DO NOT OPERATE CONTROLS OR OPEN <br />COVERS WITHOUT APPROPRIATE <br />PERSONAL PROTECTION EQUIPMENT. <br />FAILURE TO COMPLY MAY RESULT IN <br />INJURY OR DEATH! <br />REFER TO NFPA 70E FOR MINIMUM PPE REQUIREMENTS <br />TO BE INSTALLED ON THE <br />FRONT OF THE BATTERY: <br />ENERGY <br />STORAGE <br />SYSTEM <br />DISCONNECT <br />TO BE INSTALLED ON THE <br />FRONT OF THE INVERTER: <br />SOLAR ARRAY <br />(ON ROOF) <br />SERVICE POINT & <br />UTILITY METERING <br />PV SYSTEM DISCONNECT <br />FOR UTILITY OPERATION <br />INVERTER & <br />DC DISCONNECT <br />BATTERY <br />DC DISCONNECT <br />509 S Starboard <br />St-Solar9/16/2024
The URL can be used to link to this page
Your browser does not support the video tag.