Laserfiche WebLink
By: J.P. <br />Date: 8/21/24 <br />Gravity Loads: <br />DEMAND DECREASED BY 39.13% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 1.37% < 10% = OK! <br />Anchorage: <br />DEMAND OF 290.8LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRA <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />8/21/2024 9:00 AM <br />7 of 7 <br />©McPherson Engineering <br />310 W Carriage Dr Unit# <br />B11/18/2024