My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3040 S Bradford Pl Unit# B - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bradford Pl
>
3040 S Bradford Pl Unit# B
>
3040 S Bradford Pl Unit# B - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 5:40:19 AM
Creation date
6/6/2025 1:18:23 PM
Metadata
Fields
Template:
Plan
Permit Number
20183789
101120534
Full Address
3040 S Bradford Pl Unit# B
Street Number
3040
Street Direction
S
Street Name
Bradford
Street Suffix
Pl
Unit Number
B
Text box
ID:
1
Creator:
Import Agent
Created:
6/6/2025 1:18 PM
Modified:
6/6/2025 9:10 AM
Text:
mailto:projects@evengineersnet.com
ID:
2
Creator:
Import Agent
Created:
6/6/2025 1:18 PM
Modified:
6/6/2025 9:10 AM
Text:
http://www.evengineersnet.com/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
08/06/2024 <br />RE: Structural Certification for Installation of Residential Solar <br /> MARIA PAZ:3040 BRADFORD PL B, SANTA ANA, CA 92707 <br />Attn: To Whom It May Concern <br />Design Criteria <br />Code 2022 California Building Code (ASCE 7-16) <br />Risk category II Wind Load (component and Cladding) <br />Roof Dead Load Dr 10 psf V 95 mph <br />PV Dead Load DPV 3 psf Exposure B <br />Roof Live Load Lr 20 psf <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV <br />system to existing roof framing. From the field observation report, the roof is made of Composition shingle <br />roofing over roof plywood supported by 2X8 Rafters at 16 inches. The slope of the roof was approximated to be 2 <br />degrees. <br /> the existing roof <br />framing has been determined to be adequate to support the imposed loads without structural upgrades. <br />Contractor shall verify that existing framing is consistent with the described above before install. Should they find <br />any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity <br />calculations were done in accordance with applicable building codes. <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />3040 S Bradford Pl Unit# <br />B9/5/2024
The URL can be used to link to this page
Your browser does not support the video tag.