My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2726 W Strawberry Ln & Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Strawberry Ln
>
2726 W Strawberry Ln Unit# 2
>
2726 W Strawberry Ln & Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:18:58 PM
Creation date
6/6/2025 1:18:24 PM
Metadata
Fields
Template:
Plan
Permit Number
101121202
Full Address
2726 W Strawberry Ln Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WoodWorks® Shearwalls 2726 Strawberry.wsw Jul. 21, 2024 11:26:22 <br /> At vertical element – Shearline <br />Posit'n – Position of stud pack that hold-down is attached to: <br /> V Elem – Vertical element: column or strengthened studs required where not at wall end or opening <br /> L or R End – At left or right wall end <br /> L or R Op n – At left or right side of opening n <br /> t @ Op n – Uplift force t at opening n from offset opening in perforated wall above, from SDPWS 4.3.6.4.2.1 <br />Location – Co-ordinates in Plan View <br />Tensile Hold-down or Compressive Stud Force – Upwards force on hold-down at one end of the wall or downward force on bottom plate under studs <br />at the other end, for each force direction. Includes forces transferred from upper levels. <br /> Shear – Overturning component = V x h / beff from SDPWS Eqn. 4.3-7; V = force on segment, ASD-factored by 0.70; h = wall height , beff = wall <br />segment length – (tension stud pack width + hold-down anchor bolt offset) – (1/2 compression stud pack width). For perforated walls = V x h / Co <br />sum (bi) from SDPWS Eqn. 4.3-8. <br /> Dead – Dead load resisting component, factored for ASD by 0.60 for tension and 1.0 for compression <br /> Ev – Vertical seismic load effect from ASCE 7 12.4.2.2 = -0.2 Sds x ASD factor x unfactored D = 0.233 SDS x factored D. Refer to Seismic <br />Information table for more details. <br /> Cmb'd – Sum of ASD-factored overturning, dead and vertical seismic forces. May also include the uplift force t from perforated walls from <br />SDPWS 4.3.6.4.2.1 when openings are staggered. <br />Hold-down – Device model number from hold-down database; "Compression" for bearing of end stud pack on bottom plate <br />Cap – Hold-downs: Allowable ASD tension load from database; Compression: Allowable ASD bearing force = Ct CM Cb Fcp A; A = cross sectional <br />area of end studs. Refer to Framing materials table for details. <br />Crit. Resp. – Critical Response = Combined ASD force/Allowable ASD tension load <br />Notes: <br />HDU2-SDS2.5 for studs with thickness > 0'-3" and depth > 0'-3.5" : Uses 6 1/4" x 2.5" SDS heavy-duty screws; 5/8" anchor bolt. <br />Combined force from ASCE 7 2.4.1 load combination 10 = - (0.6D - 0.7Ev + 0.7Eh); Eh (from 12.4.2.1) = - shear overturning force <br />Refer to the Shear Line Dimensions table for wall height h, effective segment length beff and perforated wall adjusted sum of bi, to the Story Table <br />for joist depth, and to the Shear Results table for perforated factor Co. <br />Designer is responsible for design of connection from wall to floor or foundation for shear force shown in Shear Results table. Refer to SDPWS <br />4.3.6.4.3 for foundation anchor bolt requirements. <br />19 <br />2726 W Strawberry Ln & <br />Unit# 23/17/2025
The URL can be used to link to this page
Your browser does not support the video tag.