Laserfiche WebLink
By:J.P. <br />Date:8/13/24 <br />Gravity Loads: <br />DEMAND DECREASED BY 10.81% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 5.05% < 10% = OK! <br />Anchorage: <br />DEMAND OF 273.6LB. < CAPACITY OF 982.4LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />8/13/2024 10:54 AM <br />7 of 7 <br />©McPherson Engineering <br />2425 W Bobby Ln <br />10/21/2024