My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 W Dahl Ln & Unit# 2 - Plan
PBA
>
Building
>
ProjectDox
>
D
>
Dahl Ln
>
2320 W Dahl Ln Unit# 2
>
2320 W Dahl Ln & Unit# 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:19:04 PM
Creation date
6/6/2025 1:18:28 PM
Metadata
Fields
Template:
Plan
Permit Number
101121144
Full Address
2320 W Dahl Ln Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASTILLO ENGINEERING INC.Project 2320 W DAHL LN <br />1327 Loma Avenue <br />Long Beach, CA 90804 <br />Engr.Date:Job No.22-10072 Sheet <br />Tag <br />Beam 5 <br /> L =6.25 ft <br />Member=2x6 A =8.25 in^2 <br /> S =7.6 in^3 <br />No. of members=1 I =20.8 in^4 <br />CD=1.25 E =1,600,000 psi <br />CF=1.30 Va =0.990 kips <br /> CV=1.00 Ma =0.567 k-ft <br />Cr=1.15 <br /> <br />Total Load L/n=180 <br />Live Load L/n=240 <br />L=6.25ft <br /> <br /> <br />0.15 0.15 <br />Uniform load (W1) <br />D L Trib <br />w1,1 (15 +20)x 1.33 =19.95 +26.6 <br />w1,2 (16 +)x 0 =0 +0 <br />w1,3 (+)x 0 =0 +0 <br />w1,4 (+)x 0 =0 +0 <br />w1,5 (+)x 0 =0 +0 <br />W1 =19.95 +26.6 =0.047 klf <br />Triangular load (W2) <br />D L Trib ` <br />w2,1 (0 +0)x 0 =0 +0 <br />w2,2 (0 +0)x 0 =0 +0 <br />w2,3 (0 +0)x 0 =0 +0 <br />w2,4 (0 +0)x 0 =0 +0 <br />w2,5 (0 +0)x 0 =0 +0 <br />W2 =0 +0 =0.000 klf <br />Point Load (P1) <br />D L Trib.1 Trib.2 <br />p1,1 (+)x 0 x 0 =0 +0 <br />p1,2 (+)x 0 x 0 =0 +0 <br />p1,3 (+)x 0 x 0 =0 +0 <br />p1,4 (+)x 0 x 0 =0 +0 <br />p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) <br />P1 =0 +0 =0.00 kips 0 6.25 <br />Point Load (P2) <br />D L Trib.1 Trib.2 <br />p2,1 (+)x 0 x 0 =0 +0 <br />p2,2 (+)x 0 x 0 =0 +0 <br />p2,4 (+)x 0 x 0 =0 +0 <br />p2,4 (+)x 0 x 0 =0 +0 <br />p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) <br />P2 =0 +0 =0.00 kips 0 6.25 <br />Shear <br />R1=0.145 kips <br />R2=-0.145 kips Stress Ratio <br />Vmax=0.15 kips Vallow.=1.24 x 1 =1.2375 kips OK .12 <br />Flexure <br />M=0.23 k-ft Mallow.=1.06 x 1 =1.0599 k-ft OK .21 <br />Deflection <br />D =D w1 +Dw2 +D p1 +Dp2 <br />D (D+L)=0.048 +0.000 +0.000 +0.000 =0.05 =L <L OK deflection:.12 <br /> 1562 180 <br />0.048 +0 <br />D (L Only)=0.027 +0 +0 +0 =0.03 =L L OK deflection:.09 <br />2733 240 <br />USE:1- 2X6 <br />shear: <br />7/25/24 12:00 AM <br />RJ2 <br />flexure: <br />26 2320 W Dahl Ln & <br />Unit# 23/11/2025
The URL can be used to link to this page
Your browser does not support the video tag.