Laserfiche WebLink
1 (E) NORTH ELEVATION <br />3 (E) SOUTH ELEVATION <br />3 (E) EAST ELEVATION <br />4 (E) WEST ELEVATION <br />KEYNOTES <br />THE KEY NOTES DIRECTLY BELOW REFER TO THE ELEVATIONS ONLY2 <br />2 <br />2 <br />SHEET NUMBER <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br />SHEETSOF <br />REVISIONS <br />CONSTRUCTION SHALL CONFORM <br />TO THE ENGINEER. ALL <br />WORK. REPORT DISCREPANCIES <br />BEFORE PROCEEDING WITH THE <br />CHECK AND VERIFY ALL DIMENSIONS <br />DRAWN : <br />CHECKED : <br />DATE : <br />JOB NO. <br />TO THE C.B.C. <br />MARK DATE <br />PROJECT: <br />22-10072 <br />GA <br />GA <br />19 NOV 24 <br />. . <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />TITLE <br />AD <br />D <br />I <br />T <br />I <br />O <br />N <br /> <br />A <br />N <br />D <br /> <br />G <br />A <br />R <br />A <br />G <br />E <br /> <br />C <br />O <br />N <br />V <br />E <br />R <br />S <br />I <br />O <br />N <br />DA <br />H <br />L <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />3 <br />1 <br />2 <br />3 <br />ENGINEER: <br />Margarito Castillo, S.E. <br />23 <br />2 <br />0 <br /> <br />W <br /> <br />D <br />A <br />H <br />L <br /> <br />L <br />N <br /> <br />& <br /> <br />2 <br />3 <br />2 <br />0 <br /> <br />W <br /> <br />D <br />A <br />H <br />L <br /> <br />L <br />N <br /> <br /># <br />2 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />CASTILLO ENGINEERING <br />T: 562-961-5600 <br />WWW.CASTILLOENGINEERING.COM <br />1147 E MARKET ST, LONG BEACH, CA 90805 <br />A3.0 <br />EXISTING <br />ELEVATIONS <br />2320 W Dahl Ln & <br />Unit# 23/11/2025