Laserfiche WebLink
JOB NUMBER : 24058 <br />PLAN: <br />Story 1 Line :B Redundancy(ρ)1.3 X Dir. <br />Lateral loads : <br />at A <br />Max. Drag Force : 1769 lb Use Drag Type B (See Shear wall Schedule) <br />Total Wall Length : 36.50 ft Total Panel Length : 6.25 ft Net Length : 6.25 ft <br />Shear Diaphragm : 58 plf Design Wall Shear : 342 plf <br />Use ( 5 A35) or (4 LS50) Along Line Shear Panel or for Framing Clips Spacing See S.W. Schedule <br />USE TYPE 2 ok Ratio Shear : 0.90 <br />Max. Panel Deflection :1.428 " < 1.92 "ok <br />Holdown & Deflection Check <br />A 6.25 6.25 8 2759 2951 2759 2951 4X4 4X4 3 32" <br />Holdown L. R.Uplift <br />(lb) <br />Down <br />(lb)Holdown Uplift <br />(lb) <br />Span (ft) Deep (ft) Wind (lbs)Seis. (lbs) <br />(Per ASCE 7-16, IBC 2021,CBC 2022 & LABC 2023 Code) <br />SHEAR WALL DESIGN <br />Deflection (in.)A.B.Spacing <br />(in.) <br />HDU2 HDU2 0.2551 <br />21.5 37 1437 1195 <br />559 <br />Sum :2135 1754 <br />Right <br />1X_ROOF <br />2X_ROOF 13 17.25 455 <br />Post size <br />Panel Length <br />(ft) <br />Net L <br />(ft) <br />Height <br />(ft) <br />Left <br />Seis. Wall (lbs)243 <br />Down <br />(lb) <br />Span(ft) Seis. (lbs) Wind (lbs) <br />From Line 1 <br />Lateral Loads: <br />0% 0 0 <br />From Line 100% 0 0 <br />Uplift Above 00 lbs <br />DM = (4.0/1.0) X Ds X 1.4 = <br />0 5.25 15 21 23.5 26.25 30.25 36.536.536.536.5 <br />30.25 36.50000000000 <br />A <br />2201 W Seventh St <br />12/9/2024