CONCRETE NOTES <br />All reinforcing to be accurately and securely located prior to pouring concrete. <br />All horizontal reinforcement to have matching dowels at corners of walls. All vertical <br />reinforcement to have matching dowels to footing, U.O.N. <br />2. <br />3. <br />Concrete is reinforced and cast-in-place unless otherwise noted. Where reinforcing is not <br />specifically shown or where details are not given, provide reinforcing similar to that shown for <br />similar conditions, subject to review by the owner's representative. <br />1. <br />All phases of work pertaining to the concrete construction shall conform to the latest edition of <br />ACI318 "Building Code Requirements for Reinforced Concrete", and the latest edition of ACI117 <br />"Specifications for tolerances for concrete construction and materials". <br />2. <br />All structural concrete shall have a minimum compressive strength at 28 days shall be min 2500 <br />psi, U.N.O. <br />3. <br />No more than one grade of concrete shall be on the job site at any one time.4. <br />Concrete mixes shall be prepared with type II/V portland cement conforming to ASTM C150.5. <br />Concrete mix designs containing fly ash may be used where concrete is not visually exposed. Fly <br />ash shall conform with ASTM C618 and may replace up to 20% porland cement by volume. <br />6. <br />Concrete mix proportioning shall meet statistical strength requirements of ACI 301 and ACI <br />214R. Mix designs showing compliance with strength requirements to be submitted to E.O.R for <br />review. <br />7. <br />Normal weight concrete aggregates shall conform to ASTM C33. Light weight concrete <br />aggregates shall conform to ASTM C330. <br />8. <br />Concrete strength test reports shall be in compliance with ACI 318 and shall be submitted to <br />E.O.R. <br />9. <br />Water used in mixing concrete shall conform with ASTM C1602.10. <br />Thoroughly clean and roughen all hardened concrete and masonry surfaces to receive new <br />concrete. Interface shall be roughened to a full amplitude of 1/4", U.O.N. <br />11. <br />REIFORCING STEEL NOTES <br />Reinforcing steel shall conform to ASTM A615, Grade 60 for all sizes.1. <br />4.Coverage shall be: 3" clear for concrete cast against earth, 2" clear for concrete exposed to <br />moisture but not cast against earth, and 1 1/2" for all other conditions. (U.N.O) <br />Framing contractor should notify E.O.R. in writing if the roofing weight exceeds 10 psf prior to <br />construction. <br />Typical ceiling joists with dead load DL = 6.0 psf, live load LL = 10.0 psf: <br />- Floor: 23/32" APA rated Sturd-I-Floor T&G Exp I with min. span rating of 24" o.c. with 10d <br />common nails (B.N. @ 6" o.c., E.N. @ 6" o.c., F.N. @ 12" o.c.) <br />All Versa-lam laminated veneer lumber members (LVL) shall be fabricated and erected in <br />accordance with ICC ES ESR-1040 <br />9.Stud walls perpendicular to a concrete or masonry wall shall be bolted to the concrete or <br />masonry wall with 5/8" diameter x 8" A307 bolts at top, mid-height and bottom. <br />8. <br />6. <br />2x4 2x6 2x8 <br />Spacing Max spanMax spanSpacingMax spanSpacing <br />12" <br />16" <br />24"7'-7" <br />8'-10" <br />9'-10"12" <br />16" <br />24"12'-6" <br />14'-5" <br />16'-0"12" <br />16" <br />24"15'-9" <br />18'-4" <br />20'-5" <br />WOOD SPECIFICATIONS & NOTES <br />- Beams/ Post/ Rafters & all other structural framing:2x, 4x members: No. 2 <br />6x, 8x members: No. 1 <br />- Beam/Headers with 1 3/4" wide:Fb = 2800 psi, Fv = 285 psi, E = 2.0E6 psi <br />Sawn framing lumber - Douglas Fir-Larch U.N.O:1. <br />Engineered lumber:2. <br />Hold-down connector bolts into wood framing require approved plate washers; and hold-downs <br />shall be finger tight and wrench turned just prior to covering the wall framing. Connector bolts <br />into wood framing require steel plate washers on the post on the opposite side of the <br />anchorage device. Plate size shall be a minimum of 0.299 inch by 3 inches by 3 inches.(2305.5) <br />- Roof diaphragm nailing to be inspected before covering. Face grain of plywood shall be <br />perpendicular to supports. Floor shall have tongue and groove or blocked panel edges. <br />Plywood spans shall conform with Table 2304.8(1). <br />- Studs: use Stud grade if height up to 9'-0" and No. 2 if taller than 9'-0". <br />- Plates and blocking: No. 2 <br />- All lumber in contact with concrete or masonry to be pressure preservative treated. <br />- All framing lumber shall have 19% maximum moisture content at time of installation and fabrication. <br />- Beam/Headers with 3 1/2" and wider:Fb = 3100 psi, Fv = 285 psi, E = 2.0E6 psi <br />- Rimboard:Fb = 1750 psi, Fv = 225 psi, E = 1.3E6 psi <br />- Roof: use 15/32" APA rated sheathing Exp 1 with a min. panel index of 32/16 with 8d <br />common nails (B.N. @ 6" o.c., E.N. @ 6" o.c., F.N. @ 12" o.c.) <br />Diaphragm (U.N.O. on plan):3. <br />- All structural rated panels must be stamped by one of the following approved agencies, APA, <br />PFS/TECO or Pittsburg. <br />- Refer to NER 108 for installation and conditions of use <br />Structural Glued laminated members:4. <br />b. Adhesive shall be exterior type adhesive meeting requirements of US commercial standard <br />PS-56 and ASTM D3737. <br />a. All structural glued laminated members shall be combination 24F-V4 DF/DF (24F-V8 DF/DF <br />at all continuous or cantilever applications) fabricated and erected in accordance with <br />ANSI/ASTM standard A190.1 and ASTM D3737. <br />c. The fabricator shall furnish AITC certificates to the structural engineer and the building <br />inspection department prior to framing inspection. <br />SIZE, HEIGHT AND SPACING OF WOOD STUDS <br />Bearing Walls 10ft max.Non-Bearing Walls <br />maximum spacing when supporting <br />Stud Height Max. <br />SpacingRoofOne floor <br />& roof <br />Two floor <br />& roof <br />One floor <br />only <br />Stud size <br />Bearing walls exceeding 10'-0" must be designed case by case. <br />2x4 <br />3x4 <br />2x6 <br />2-2x4 <br />2-2x6 <br />24 <br />24 <br />24 <br />- <br />- <br />16 <br />24 <br />24 <br />- <br />- <br />16 <br />16 <br />16 <br />24 <br />(inches)(inches)(inches)(inches)(inches)(feet) <br />24 <br />24 <br />24 <br />14 <br />14 <br />20 <br />24 <br />24 <br />24 <br />not allowed <br />-- <br />- <br />- <br />- <br />Typical stud wall table:5. <br />- <br />I-joists shall be manufactured by Weyerhaeuser or equivalent approved ICC manufactured <br />product. <br />7. <br />Install windows and doors in stud walls after dead loads are applied, and provide a 1/2" shim <br />space at the head condition. <br />10. <br />All posts shall be full height from foundation to roof. Where posts are discontinous at joist space <br />and/or from top of beams/headers to lower top plate, block this space with stud post. <br />11. <br />Blocking and bridging - provide as follows: <br />- 2x solid blocking between joists and rafters over support. <br />- 2x solid blocking between joists and rafter not over 8'-0" on center nor more than 8'-0" from <br />support. <br />- Omit blocking between ceiling joists and rafters 2x8 and smaller. <br />12. <br />- Adhesive used to attach floor sheathing to framing elements shall conform with APA <br />specification AFG-01. <br />All vertical pipes through plates and/or solid rim beams must be drilled clean cut w/ 1/16" <br />tolerance. do not notch or cut plates. <br />13. <br />14. <br />NAILING SCHEDULE TABLE R602.3 (1) <br />1. Joist to sill or girder <br />2. Bridging to joist <br />3. 1" X 6" subfloor or less to each joist <br />4. Wider than 1" x 6" subfloor to each joist <br />5. 2" subfloor to joist or girder <br />6. Sole plate to joist or blocking <br /> Sole plate to joist or blocking <br /> at braced wall panel <br />7. Top plate to stud <br />8. Stud to sole plate 2x4 Stud <br />2x6 Stud <br />2x8 Stud <br />9. Double studs <br />6-8d <br />4-16d <br />8-8d <br />6-16d <br />11. Blocking between joist or rafters <br />to top plate <br />12. Rim joist to top plate <br />13. Top plates, laps and intersections <br />14. Continuous header, two pieces <br />15. Ceiling joists to plate <br />16. Continuous header to stud <br />17. Ceiling joists, laps over partitions <br />18. Ceiling joists to parallel rafters <br />19. Rafter to plate <br />20. 1" diagonal brace to each stud and plate <br />21. 1" x 8" sheathing to each bearing <br />22. Wider than 1" x 8" sheathing to each <br /> bearing <br />24. Built-up girder and beams 20d at 32" O.C. <br />2-20d <br />2. Joist can be either sawn lumber or i-joist per plan <br />Notes: 1. Common nails shall be used (u.n.o.) <br />3-8d <br />2-8d <br />2-8d <br />3-8d <br />2-16d <br />16d (box) at 16" O.C. <br />(3) 16d (box) at 16" <br />2-16d <br />4-8d <br />2-16d <br />16d (box) at 24" O.C. <br />10. Doubled top plates 16d (box) at 16" O.C. <br /> Double top plates 8-16d <br />3-8d <br />8d at 6" O.C. <br />2-16d <br />16d <br />3-8d <br />4-8d <br />3-16d <br />3-16d <br />3-8d <br />2-8d <br />3-8d <br />3-8d <br />23. Built-up corner studs 16d <br />25. 2" planks 16d <br />CONNECTION NAILING <br />26. Collar tie to rafter <br />27. Jack rafter to hip <br />28. Roof rafter to 2-by ridge beam <br />29. Joist to band joist <br />30. Ledger strip <br />3-10d <br />3-10d <br />2-16d <br />2-16d <br />2-16d <br />3-16d <br />3-16d <br />LOCATION <br />Toenail <br />Toenail ea. end <br />Face nail <br />Face nail <br />Blind and face nail <br />Typical face nail <br />Braced wall panels <br />Blind and face nail <br />Toenail <br />End nail <br />Toenail <br />End nail <br />Toenail <br />End nail <br />Face nail <br />Typical face nail <br />Toenail <br />Toenail <br />24" O.C. <br />16" O.C. <br />At each bearing <br />Face nail <br />Face nail <br />16" O.C. along edge <br />Toenail <br />Toenail <br />Face nail <br />Face nail <br />Lap splice <br />Toenail <br />Face nail <br />Face nail <br />Face nail <br />Face nail at top & <br />bottom staggered <br />on opposite sides <br />Face nail at ends & <br />ateach splice <br />Toenail <br />Face nail <br />Toenail <br />Face nail <br />Face nail <br />Face nail <br />NAILING & HARDWARE NOTES <br />All machine bolts shall conform to ASTM A307. <br />At interior non-shear walls, use Simpson PHNW series 0.145∅ pins with a penetration of 1 1/4" <br />into slab at 16" O.C. to be installed in accordance with ICC ESR-2138. <br />All nails shall be sinker nails and staggered U.N.O., except as shown in Nailing Schedule. <br />Connectors for wood construction noted on plans and details shall be Simpson company <br />Strong-tie connectors or approved equal. <br />All joist hangers shall be Simpson U hanger, all beam hangers shall be Simpson HU hangers <br />U.N.O. on plan or detail. Follow manufacturer's recommendations for installation. <br />3. <br />4. <br />5. <br />6. <br />7. <br />Fasteners penetrating pressure-preservative treated and fire-retardant treated wood shall be hot <br />depped galvanized per ASTM A153, Class D. <br />2. <br />All diaphragm and shear wall nailing shall utilize common nails or galvanized box. <br />1. <br />Lag screws per ANSI/ASME standard B18.2.1 provide lead hole same diameter and depth as <br />shank and then drill hole 60%-70% of shank diameter for threaded portions. <br />Typically sills on concrete footing shall be anchored with 5/8" diameter x 12" min. length <br />machine bolts with 7" embedment at 72" o.c.. Locate bolts 6" min. and 12" max. from each end <br />of each stick. There shall be at least 2 bolts in each stick. <br />Where notches for pipes, etc. , exceed 1/3 the width of the sill, place a bolt within 6" of each side <br />of notch. Tiedown bolts shall not be considered as sill bolts. <br />Bolt holes in wood and steel shall be the diameter of the bolt plus 1/16" <br />At shear walls, anchor bolt spacing not over 48" o.c. See shear wall schedule for specific spacing <br />of anchor bolts which may be noted as less than 48" o.c.. Anchor bolts shall be installed with <br />plate washers of min. 3" sq. x 0.229" thick between sill plate and nut. Edge(s) of plate washers <br />shall be 1/2" max. from inside face of shear panel(s) per detail 1/SD.0. <br />At non shear wall, round washers shall be used on all bolts and should conform with ANSI/ASME <br />B 18.22.1. Use min. 1 3/8" Ø x 7/64" thick washer for 1/2" Ø bolt, 1 3/4" Ø x 9/64" thick washer <br />for 5/8" Ø bolt and 2 1/2" Ø x 11/64" thick washer for 1" Ø bolt. U.N.O. <br />8. <br />9. <br />10. <br />11. <br />13. <br />12. <br />Provide #3 X 24" dowel at 24" o.c. and 12" from the corner at all concrete stoops and porches. <br />Provide min. (1) #4 reinforcing for electrical ground, location to be verified with the electrical <br />contractor. <br />Verify min. foundation depth, width, reinforcing steel and additional expansive soil requirements <br />with valid soils report and if more stringent, they shall supersede the above minimum <br />requirements. See note #3 under reinforced concrete for concrete strength. <br />Footings shall be examined and certified in writing by the project soil/geology engineer prior to <br />inspection and placement of concrete. <br />Concrete shall be to the strength and slump as specified per structural design, and consist of <br />Portland cement ASTM C-150 Type V per soils engineer's recommendations and Building Code <br />section 1904 (ACI 318 section 19.3.2.1) when exposed to sulfate containing solutions. <br />Aggregates shall be per ASTM C-33. Water to be clean and potable. <br />Placement shall be in one continuous operation unless otherwise specified. Slab surface shall be <br />cured with 'Hunts' compound or equal or cured with other methods in accordance with good <br />construction practice at contractor's option. <br />Contractor shall dampen slab underlayment of sand/membrane just prior to concrete placement <br />to assist uniform concrete curing. Slabs must not be poured during or immediately after <br />rainstorms. The specified sand over visqueen should not be saturated at the time of the concrete <br />pour. Any free water trapped in the sand layer must be removed prior to the concrete pour. <br />The bottoms of footing excavations shall be level, clean and free of loose material or water when <br />concrete is placed. Over excavation shall be filled with concrete or properly compacted fill that <br />has been tested and approved by the soils engineer. Backfill shall not be placed until supporting <br />foundations, walls and slab have attained sufficient strength to support lateral soil pressure. <br />Concrete placement shall be monolithic in one continuous operation uniformly placed and must <br />be vibrated and well consolidated unless shown otherwise on plans. Dual pour is defined by ACI <br />as to when 1st. & 2nd. pour can not be vibrated together. <br />Requirements for pre-saturation of subgrade soils and daylight setback of exterior footings from <br />any descending slope shall comply with soil report recommendations. <br />Finish grade around the perimeter of slab shall be constructed such that rain and irrigation <br />water is drained away from the slab. <br />All site and pad preparation, such as but not limited to shading, compacting of the fill, <br />pre-saturation, and concrete slab base preparation, shall be performed in accordance with the <br />soil engineer's recommendation and soils report. <br />Foundation drawings prepared by E.O.R. reflect the structural requirements. Refer to <br />architectural plans for dimensions, depressions, slope, shelves, patios, stoops and porches not <br />shown in foundation drawings. Accuracy of the dimensions and final fit of the building shall be <br />reviewed by the architect and the contractor prior to construction. <br />Waiting period for concrete slabs-on-grade prior to start of construction is as follows: <br />No pipes or conduits shall extend under isolated column footing or under continuous wall <br />footings unless specifically detailed or approved by the architect, structural engineer and the <br />building official. <br />The contractor shall arrange for observation of the work by the soils engineer. The following are <br />requirements of the soils engineer: <br />a. All footing excavations shall be inspected and certified in compliance with the soils report by <br />the soil engineer prior to placing of concrete or steel. <br />b. Soil conditions, including compacting and moisture content, shall be inspected and certified <br />to be in compliance with the soil report by the soils engineer prior to placing of concrete or <br />steel. <br />c. A certificate of compliance shall be submitted to the building official prior to his foundation <br />inspection and to the architect and structural engineer. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9.Floor slab shall be poured level to 1/8" in 10'. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />a. Do not walk on slab until 24 hours after concrete has been poured. <br />b. Begin wall framing 4-5 days after concrete poured. <br />c. Begin roof/floor framing 7-10 days after concrete poured. <br />d. Do not load roof prior to 14 days after concrete poured. <br />Prior to the contractor requesting a Building Department foundation inspection, the soil <br />engineer shall advise the building official in writing that: <br />a. The building pad was prepared in accordance with the soil report. <br />b. The utility trenches have been properly backfilled and compacted <br />c. The foundation excavations, the soils expansive characteristics and bearing capacity <br />conform to the soils report. <br />All grade beams shall be poured monolithically for their entire length. <br />FOUNDATION NOTES <br />Admixtures in concrete mix. containing calcium chlorides shall not be used. <br />18. <br />19. <br />20. <br />SHEET INDEX <br />S-0 General Notes & Requirements. <br />S-1 Foundation & Roof Framing Plan. <br />SD.0 Structural Details. <br />GENERAL NOTES <br />DESIGN CRITERIA <br />Reference to codes, rules, regulations, standards, manufacturer's instructions or <br />requirements of regulatory agencies is to the latest printed edition of each in <br />effect at the date of submission of bid unless the document date is shown. <br />Do not use scaled dimensions, use written dimensions. Where no dimension is <br />provide, consult the architect for clarification before proceeding with the work. <br />Field measure existing dimensions not noted. <br />Omissions or conflicts between various elements of the drawings, notes, and <br />details shall be brought to the attention of the architect and resolved before <br />proceeding with the work. <br />Details of construction not shown shall be of same nature as those shown for <br />similar conditions. Refer to the typical detail sheets for typical details of <br />construction. Typical details apply to all construction unless specifically noted or <br />shown otherwise. Where conditions require modifications of a typical detail, the <br />contractor shall submit modified detail for approval by the EOR to fabrication <br />and installation. <br />Drawings and specifications represent finished structure. Contractor shall be <br />responsible for means and methods of construction, including but not limited to <br />shoring and temporary bracing. The contractor shall take all necessary measures <br />to insure safety of all persons and structures at the site and adjacent to the site. <br />Observation visits to the site by the architect, engineer or construction manager <br />shall not relieve the contractor of such responsibility. <br />Structural information shown on framing plans is for the main structural <br />elements. Non-structural elements shall be constructed per approved code <br />requirements. <br />Specifications related to waterproofing, including but not limited to membranes, <br />waterstops, sealants, flashing, vapor barrier, are as specified by architect/water <br />proofing consultant. <br />1. <br />4. <br />5. <br />3. <br />8. <br />9. <br />2. <br />1 <br />Building code <br />A. GENERAL <br />2022 CBC <br />Risk category II <br />Soil enginieer N/A <br />Report number N/A <br />Date N/A <br />Allowable soil bearing pressure 1500 PSF <br />Allowable passive pressure - <br />Site class <br />D <br />Short period spectral acceleration, S <br />1 <br />1st period spectral acceleration, S <br />D-Default <br />Short period acceleration parameter, S <br />1.296 <br />1 second acceleration parameter, S <br />0.463 <br />Seismic response coeffiecient, C <br />1.037 <br />0.567 <br />Response modification factor, R 6.5 <br />Seismic design category <br />0.16 <br />Seismic importance factor, I <br />Design base shear V = 0.7C W 0.112W <br />B. SOIL PARAMETERS <br />D. SEISMIC DESIGN PARAMETERS <br />S <br />DS <br />D1 <br />S <br />C. WIND DESIGN PARAMETERS <br />Design speed <br />Exposure category <br />e <br />95 MPH <br />C <br />S <br />The contractor shall verify the location of existing utilities before beginning work. <br />Special care shall be taken to project utilities that are to remain in service during <br />construction. <br />6. <br />Construction materials shall be distributed when placed on the structure such <br />that loads do not exceed design live loads or result in an unbalanced condition. <br />10. <br />The contractor shall inform the engineer in writing of any deviation from the <br />contract documents. <br />7. <br />E. GRAVITY DESIGN PARAMETERS (PSF) <br />Dead <br />Roof live <br />Live <br />15 <br />20 <br />8 <br />10 <br />Roof Ceiling Exterior wall Interior wall <br />17 <br />- <br />LOAD <br />10 <br />SPECIAL INSPECTION: <br />The owner shall employ one or more special inspectors to provide inspections during construction. The <br />special inspector shall be a qualified person who shall demonstrate competence, to the satisfaction of the <br />building official, for inspection of the particular type of construction or operation requiring special <br />inspection. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />INSPECTION SCHEDULE <br />Soil condition <br />Concrete work <br />Shotcrete work <br />Reinforcing steel <br />Post installed anchors <br />Structural steel <br />Structural steel welding <br />High strength bolting <br />Massonry work <br />High load diaphragms <br />Structural wood <br />Cold formed steel <br />Driven deep foundation element <br />Cast in place deep foundation <br />REQ'DINSPECTION ITEMS REMARKSCODE REFERENCE <br />CBC Table 1705.3 <br />CBC Table 1705.3 <br />CBC Table 1705.2.2, 1705.3 <br />CBC Table 1705.3 <br />CBC 1705.2 <br />CBC 1705.2 <br />CBC 1705.2 <br />CBC 1705.4 <br />CBC 1705.1 <br />CBC 1705.10.1, 1705.11.2 <br />CBC 1705.10.2, 1705.11.3 <br />CBC Table 1705.7 <br />CBC Table 1705.8 <br />CBC Table 1705.6 <br />See also ICC approval <br />See note #8 above <br />See soils report for <br />compliance <br />Structural wood, periodic special inspection is required for wood shearwalls, shear panels, and <br />diaphragms, including nailing, bolting, anchoring, and other fastening of components of the seismic <br />force resisting system, including wood shearwalls, wood diaphragms, drag struts, braces, shear panels, <br />and holdowns, exception: special inspection is not required for wood shearwalls, shear panels and <br />diaphragms, including nailing, bolting, anchoring and other fastening to other components of the <br />seismic force resisting system, where the fastener spacing of the sheathing is more than 4 inches on <br />center. Inspections shall be performed befor covering. <br />9. <br />Special inspection shall be provided per CBC section 1704 & 1707, see inspection schedule <br />below, only checked items are required. <br />Special inspections are not required where the work is done on the premises of a fabricator registered <br />and approved to perform such work without special inspection. Approved fabricators must submit a <br />certificate of compliance for offsite fabrications such as structural steel, precast concrete, glued laminated <br />timber, etc. <br />All inspections shall be performed by independent special inspectors. Job site visits by the structural <br />engineer or building official do not constitute and are not a substitute for inspections by a special <br />inspector. <br />All inspection reports shall be submitted to building official and E.O.R. The final reports by the special <br />inspectors must certify that the entire structural system complies with the approved plans and <br />specifications. <br />It is solely the contractor's responsibility to see that these inspections are performed. <br />Work requiring special inspection shall be inspected by the special inspector who is present in the area <br />where the work is performed and at the completion of work. Continuous inspection consists of full time <br />inspection; Periodic inspection consists of part time or intermittent inspection. <br />The following special inspections are in addition to inspections by the building official. This list is not <br />intended to be all inclusive. <br />Epoxy dowels ESR 2508 <br />PROJECT CONTACT <br />OWNERSHIP <br />IT IS THE SUBCONTRACTORS RESPONSIBILITY PRIOR TO OR DURING <br />CONSTRUCTION TO NOTIFY THE DESIGNERS OR JOB FOREMAN IN WRITING <br />OR IN VERBAL OF ANY PERCEIVED ERRORS OR OMISSIONS IN THE PLANS <br />AND SPECIFICATIONS OF WHICH A SUBCONTRACTOR THOROUGHLY <br />KNOWLEDGEABLE WITH THE BUILDING CODES AND METHODS OF <br />CONSTRUCTION SHOULD REASONABLY BE AWARE. WRITTEN OR VERBAL <br />INSTRUCTIONS ADDRESSING SUCH PERCEIVED ERRORS OR OMISSIONS <br />SHALL BE RECEIVED FROM THE DESIGNERS OR JOB FOREMAN PRIOR TO <br />THE SUBCONTRACTORS BEFORE PROCEEDING WITH THE WORK. THE <br />OWNERS WILL NOT BE RESPONSIBLE FOR ANY DEFECTS IN <br />CONSTRUCTION IF THESE PROCEDURES ARE NOT BEING FOLLOWED. <br />DESCRIPTIONDATEDELTA <br />CONVERT 439 SQ.FT <br />GARAGE TO JADU <br />(1 BEDROOMS, <br />1 BATHROOMS, <br />1KITCHEN ) <br />C <br />NAHT NEYUGNC <br />IVI L <br />H . <br />A <br />LACF <br />No. C81016 <br />Exp. 9/30/23 <br />OETTSA INROFI <br />THANH NGUYEN <br />08/03/23 <br />14572 HARPER STREET - MIDWAY CITY, CA 92655 <br />Tel.: +1 909 534 7760 | Email. Tyke7074@yahoo.com <br />THANH NGUYEN <br />REGISTERED PROFESS IONAL ENGINEER <br />DATE <br />2 11/22/2024 2nd Plan Check <br />20 <br />1 <br />9 <br /> <br />W <br /> <br />C <br />a <br />m <br />d <br />e <br />n <br /> <br />P <br />l <br />, <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />CO <br />N <br />V <br />E <br />R <br />T <br /> <br />G <br />A <br />R <br />A <br />G <br />E <br />TO <br /> <br />J <br />A <br />D <br />U <br />S-0 <br />GENERAL NOTES <br />& REQUIREMENTS <br />2019 W Camden Pl & <br />Unit# 24/15/2025