PA / PM:
<br />DRAWN BY:
<br />PROJECT NUMBER:
<br />TH
<br />E
<br />S
<br />E
<br />
<br />D
<br />R
<br />A
<br />W
<br />I
<br />N
<br />G
<br />S
<br />
<br />A
<br />N
<br />D
<br />
<br />S
<br />P
<br />E
<br />C
<br />I
<br />F
<br />I
<br />C
<br />A
<br />T
<br />I
<br />O
<br />N
<br />S
<br />
<br />A
<br />R
<br />E
<br />
<br />T
<br />H
<br />E
<br />
<br />P
<br />R
<br />O
<br />P
<br />E
<br />R
<br />T
<br />Y
<br />
<br />A
<br />N
<br />D
<br />
<br />C
<br />O
<br />P
<br />Y
<br />R
<br />I
<br />G
<br />H
<br />T
<br />
<br />O
<br />F
<br />
<br />M
<br />O
<br />I
<br />R
<br />E
<br />
<br />S
<br />T
<br />U
<br />D
<br />I
<br />O
<br />
<br />A
<br />N
<br />D
<br />
<br />S
<br />H
<br />A
<br />L
<br />L
<br />
<br />N
<br />O
<br />T
<br />
<br />B
<br />E
<br />
<br />U
<br />S
<br />E
<br />D
<br />
<br />O
<br />N
<br />
<br />A
<br />N
<br />Y
<br />
<br />O
<br />T
<br />H
<br />E
<br />R
<br />
<br />W
<br />O
<br />R
<br />K
<br />
<br />E
<br />X
<br />C
<br />E
<br />P
<br />T
<br />
<br />B
<br />Y
<br />
<br />A
<br />G
<br />R
<br />E
<br />E
<br />M
<br />E
<br />N
<br />T
<br />
<br />W
<br />I
<br />T
<br />H
<br />
<br />M
<br />O
<br />I
<br />R
<br />E
<br />
<br />S
<br />T
<br />U
<br />D
<br />I
<br />O
<br />
<br />W
<br />R
<br />I
<br />T
<br />T
<br />E
<br />N
<br />
<br />D
<br />I
<br />M
<br />E
<br />N
<br />S
<br />I
<br />O
<br />N
<br />S
<br />
<br />S
<br />H
<br />A
<br />L
<br />L
<br />
<br />T
<br />A
<br />K
<br />E
<br />
<br />P
<br />R
<br />E
<br />F
<br />E
<br />R
<br />E
<br />N
<br />C
<br />E
<br />
<br />O
<br />V
<br />E
<br />R
<br />
<br />S
<br />C
<br />A
<br />L
<br />E
<br />D
<br />
<br />D
<br />I
<br />M
<br />E
<br />N
<br />S
<br />I
<br />O
<br />N
<br />S
<br />
<br />A
<br />N
<br />D
<br />
<br />S
<br />H
<br />A
<br />L
<br />L
<br />
<br />B
<br />E
<br />
<br />V
<br />E
<br />R
<br />I
<br />F
<br />I
<br />E
<br />D
<br />
<br />O
<br />N
<br />
<br />T
<br />H
<br />E
<br />
<br />J
<br />O
<br />B
<br />
<br />S
<br />I
<br />T
<br />E
<br />.
<br />
<br />A
<br />N
<br />Y
<br />
<br />D
<br />I
<br />S
<br />C
<br />R
<br />E
<br />P
<br />A
<br />N
<br />C
<br />Y
<br />
<br />S
<br />H
<br />A
<br />L
<br />L
<br />
<br />B
<br />E
<br />
<br />B
<br />R
<br />O
<br />U
<br />G
<br />H
<br />T
<br />
<br />T
<br />O
<br />
<br />T
<br />H
<br />E
<br />
<br />N
<br />O
<br />T
<br />I
<br />C
<br />E
<br />
<br />O
<br />F
<br />
<br />M
<br />O
<br />I
<br />R
<br />E
<br />
<br />S
<br />T
<br />U
<br />D
<br />I
<br />O
<br />
<br />P
<br />R
<br />I
<br />O
<br />R
<br />
<br />T
<br />O
<br />
<br />T
<br />H
<br />E
<br />
<br />C
<br />O
<br />M
<br />M
<br />E
<br />N
<br />C
<br />E
<br />M
<br />E
<br />N
<br />T
<br />
<br />O
<br />F
<br />
<br />A
<br />N
<br />Y
<br />
<br />W
<br />O
<br />R
<br />K
<br />.
<br />TN/TB
<br />TB
<br />24006
<br />architect's stamp:
<br />consultant's stamp:
<br />NO.DATE SUBMITTAL
<br />1 04-29-2024 PLAN CHECK SUBMITTAL
<br />2001 S BIRCH STREET,
<br />SANTA ANA, CA 92707
<br />RESTORATION
<br />BIRCH ST
<br />THE
<br />2125 Ocean Park Boulevard
<br />Santa Monica, CA 90405
<br />Tel: 949 395 1718
<br />C-35111
<br />REN. 2/28/2023
<br />2 06-26-2024 PC CORRECTIONS 1
<br />3 07-09-2024 PC CORRECTIONS 2
<br />T1.2
<br />GENERAL NOTES
<br />1.DO NOT SCALE DRAWINGS.
<br />2.THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE, AND
<br />ALL OTHER ORDINANCES, CODES AND REGULATIONS LISTED IN THE
<br />SPECIFICATIONS OR ON THE DRAWINGS, AND REQUIRED BY THE LOCAL
<br />BULDING AUTHORITIES. THE GOVERNING CODE, RULES AND
<br />REGULATIONS ARE COLLECTIVELY REFERRED TO AS "THE CODE". THE
<br />CONTRACTOR SHALL REPORT ANY INCONSISTENCIES, CONFLICTS OR
<br />OMISSIONS HE MAY DISCOVER TO THE ARCHITECT FOR INTERPRETATION
<br />PRIOR TO PERFORMING THE WORK.
<br />3.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS
<br />AND REPORT ANY DISCREPANCIES TO THE ARCHITECT AND STRUCTURAL
<br />ENGINEER BEFORE PROCEEDING WITH THE WORK.
<br />4.SHOULD ANY CONDITION ARISE WHERE THE INTENT ON THE DRAWINGS
<br />IS IN DOUBT OR WHERE THERE IS A DISCREPANCY BETWEEN THE
<br />DRAWINGS AND FIELD CONDITIONS, OR THERE APPEARS TO BE AN
<br />ERROR ON THE DRAWINGS, THE ARCHITECT AND STRUCTURAL ENGINEER
<br />SHALL BE NOTIFIED AS SOON AS POSSIBLE FOR THE PROCEDURE TO BE
<br />FOLLOWED.
<br />5.IN THE EVENT OF CONFLICTING REQUIREMENTS BETWEEN ITEMS ON THE
<br />DRAWINGS OR BETWEEN ITEMS IN THE SPECIFICATIONS, OR BETWEEN
<br />ITEMS ON THE DRAWINGS AND IN THE SPECIFICATIONS, THE MORE
<br />STRINGENT OR COSTLY SHALL GOVERN, UNLESS OTHERWISE DECIDED BY
<br />THE ARCHITECT.
<br />6.NOTED DIMENSIONS TAKE PRECEDENT OVER SCALE. ARCHITECT TO BE
<br />NOTIFIED IMMEDIATELY OF ANY DISCREPANCY BEFORE PROCEDING
<br />WITH ANY WORK. LARGE SCALE DETAILS GOVERN OVER SMALL SCALE
<br />DETAILS. ALL DIMENSIONS ARE TO THE FACE OF FINISH UNLESS
<br />OTHERWISE NOTED.
<br />7.NO DEVIATION FROM THE STRUCTURAL DESIGN WITHOUT WRITTEN
<br />APPROVAL OF THE STRUCTURAL AUTHORITY TO DEVIATE FROM THE
<br />PLANS OR SPECIFICATIONS.
<br />8.CONTRACTOR SHALL PROVIDE A FIRE PROTECTION SYSTEM DURING
<br />CONSTRUCTION.
<br />9.CONTRACTOR SHALL COORDINATE ALL SLAB AND WALL OPENINGS
<br />REQUIRED BY MECHANICAL AND ELECTRICAL DRAWINGS.
<br />10.ALL PIPE, DUCTS AND BUS DUCTS THAT PENETRATE FLOOR SLABS SHALL
<br />BE INSTALLED IN A MANNER THAT WILL PRESERVE FIRE RESISTIVE AND
<br />STRUCTURAL INTEGRITY OF THE BUILDING.
<br />11.ALL MECHANICAL DUCTS PENETRATING FIRE RATED PARTITIONS, CEILING
<br />AND SHAFT ENCLOSURES SHALL HAVE FIRE RATED DAMPERS. IT IS THE
<br />CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE
<br />ARCHITECTURAL DRAWINGS PRIOR TO SUBMISSION OF THE SHOP
<br />DRAWINGS.
<br />12.PROVIDE ACOUSTICAL BATT INSULATION AT ALL DUCTS, SHAFTS, TOILET
<br />ROOM WALLS AND MECHANICAL ROOM WALLS ADJACENT TO
<br />OCCUPIED TENANT SPACES.
<br />13.THE ARCHITECT APPROVAL OF SUCH SHOP DRAWINGS AND PRODUCT
<br />SUBMITTALS SHALL NOT RELIEVE THE GENERAL CONTRACTOR OR
<br />SUBCONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM THE
<br />DRAWINGS OR SPECIFICATIONS UNLESS HE HAS WRITING, CALLED THE
<br />ARCHITECT'S ATTENTION TO SUCH DEVIATIONS AT TIME OF SUBMISSIONS,
<br />NOR SHALL IT RELIEVE HIM FROM RESPONSIBILITY FOR ERRORS OF ANY
<br />SORT IN THE SHOP DRAWINGS.
<br />14.PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT SHALL
<br />HAVE EVIDENCE OF CURRENT WORKMAN'S COMPENSATION
<br />INSURANCE COVERAGE ON FILE WITH THE BUILDING DEPARTMENT IN
<br />COMPLIANCE WITH SECTION 3800 OF THE CALIFORNIA LABOR CODE.
<br />15.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND
<br />MAINTAIN WORKMAN'S COMPENSATION INSURANCE.
<br />16.CONTRACTOR SHALL PROVIDE PEDESTRIAN FENCE AND CANOPY AS
<br />REQUIRED. A PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS IS
<br />REQUIRED FOR A PROTECTION FENCE OR CANOPY ON OR OVER STREET
<br />OR PUBLIC SPACES, PER SEC 3303 C.B.C.
<br />17.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION SITE
<br />SAFETY, CONSTRUCTION METHODS AND TECHNIQUES AND SHALL AT ALL
<br />TIMES INSURE THE SAFETY OF WORKERS FROM CONSTRUCTION SITE
<br />ACCIDENTS. HE SHALL COMPLY WITH THE PERTINENT HEALTH AND
<br />SAFETY REGULATIONS FOR REQUIRED METHODS FOR PROTECTING THE
<br />PUBLIC AND CONSTRUCTION WORKER'S HEALTH AND SAFETY DURING
<br />THE CONSTRUCTION PERIOD.
<br />18.AN APPROVED SANITARY TOILET IS TO BE INSTALLED BEFORE WORK
<br />STARTS AND BE MAINTAINED FOR THE WORKMEN FOR THE DURATION OF
<br />THE CONTRACT.
<br />19.THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS FOR THE
<br />PROTECTION OF EXISTING FACILITIES ON AND ADJACENT TO THE SITE
<br />DURING CONSTRUCTION.
<br />20.THE CONTRACTOR SHALL SUPERVISE AND DIRECT WORK AND WILL BE
<br />SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,
<br />TECHNIQUE, SEQUENCES AND PROCEDURES.
<br />21.THE CONTRACTOR SHALL BE RESPONSIBLE OF ANY CONDITIONS WHICH
<br />IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE AND
<br />OF ENSURING PROPER ALIGNMENT ON ALL PLANES OF THE FINAL
<br />STRUCTURE.
<br />22.THE CONTRACTOR SHALL GIVE DUE AND LEGAL NOTICE TO ADJACENT
<br />PROPERTY OWNERS REGARDING THE PROTECTION OF THEIR PROPERTY
<br />AND STRUCTURES, WHICH MAY BE NECESSARY DUE TO EXCAVATION
<br />AND CONSTRUCTION INDICATED ON THESE PLANS, IN DUE TIME PRIOR
<br />TO THE START OF THE EXCAVATION.
<br />23.DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR
<br />MODIFICATIONS MAY BE REQUIRED TO SUIT THE FIELD DIMENSIONS OR
<br />CONDITIONS, AND SUCH MODIFICATIONS SHALL BE INCLUDED AS PART
<br />OF THE WORK OF THE CONTRACT.
<br />24.NOT WITHSTANDING ANY OMISSIONS, IT SHALL BE THE SOLE DUTY AND
<br />RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE ACTUAL
<br />CONSTRUCTION DETAILS AND FABRICATE AND INSTALL SAID DESIGN IN
<br />ACCORDANCE WITH GOOD PRACTICE AND PROCEDURE AND TO LET
<br />THE ARCHITECT KNOW AT THE TIME OF BIDDING IF SAID DRAWINGS AND
<br />DETAILS ARE NOT PRACTICAL, OR STRUCTURALLY SOUND IN THEIR INTENT
<br />AND PURPOSE, OR SUFFICIENTLY COMPLETE FOR CONSTRUCTION
<br />PURPOSES.
<br />25.THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE
<br />FINISHED STRUCTURE AND DO NOT INDICATE THE METHODS OF
<br />CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
<br />WORK AND SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS,
<br />METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES; INCLUDING
<br />BUT NOT LIMITED TO BRACING AND SHORING. OBSERVATION VISITS TO
<br />THE SITE BY FIELD REPRESENTATIVES OF THE ARCHITECT AND/OR
<br />ENGINEER SHALL NOT INCLUDE INSPECTIONS OF THE PROTECTIVE
<br />MEASURES OR THE CONSTRUCTION PROCEDURES. ANY SUPPORT
<br />SERVICES PERFORMED BY THE ARCHITECT AND/OR ENGINEER DURING
<br />THE CONSTRUCTION SHALL BE DISTINGUISHED FROM CONTINUOUS AND
<br />DETAILED INSPECTION SERVICES WHICH IS FURNISHED BY OTHERS. THESE
<br />SUPPORT SERVICES PERFORMED BY THE ARCHITECT AND/OR ENGINEER,
<br />WHETHER OF MATERIAL OR WORK, AND WHETHER PERFORMED PRIOR
<br />TO, DURING OR AFTER COMPLETION OF CONSTRUCTION, ARE
<br />PERFORMED SOLELY FOR THE PURPOSE OF ASSISTING IN QUALITY
<br />CONTROL AND IN ACHIEVING GENERAL CONFORMANCE WITH THE
<br />CONTRACT DOCUMENTS, BUT DO NOT GUARANTEE THE CONTRACTOR'S
<br />PERFORMANCE AND SHALL NOT BE CONSTRUED AS SUPERVISION OF
<br />CONSTRUCTION.
<br />26.REFERENCE TO ANY DETAIL OR DRAWING IS FOR CONVENIENCE ONLY
<br />AND DOES NOT LIMIT THE APPLICATION OF SUCH DRAWING OR DETAIL.
<br />27.DIMENSIONS SHALL BE AS INDICATED ON THE DRAWINGS.
<br />CLARIFICATIONS, IF REQUIRED, SHALL BE OBTAINED FROM THE
<br />ARCHITECT. THE DRAWINGS SHALL NOT BE SCALED.
<br />28.THE CONTRACTOR SHALL VERIFY THE LOCATION AND SIZE OF ALL
<br />FLOOR, ROOF, AND WALL OPENINGS WITH ALL OTHER APPLICABLE
<br />DRAWINGS.
<br />29.THE CONTRACTOR SHALL VERIFY INSERTS AND EMBEDDED ITEMS WITH
<br />ALL APPLICABLE DRAWINGS BEFORE POURING CONCRETE.
<br />30.THE CONTRACTOR SHALL NOT MAKE ANY SUBSTITUTIONS WITHOUT THE
<br />PERMISSION OF THE ARCHITECT OR THE OWNER.
<br />31.ALL ITEMS MARKED N.I.C. ON THE SPECIFICATIONS AND/OR DRAWINGS
<br />MEANS "NOT IN CONTRACT".
<br />32.WORK INDICATED ON THE DRAWINGS OR IN THE SPECIFICATIONS AS
<br />N.I.C., OR "BY SEPARATE CONTRACTORS", IS NOT PART OF THIS
<br />CONTRACT. THE CONTRACTOR SHALL COOPORATE FULLY WITH ALL
<br />SEPARATE CONTRACTORS EMPLOYED BY THE OWNER.
<br />75.THE CENTER OF THE GRIP OF THE OPERATING HANDLE OF SWITCHES
<br />INTENDED TO BE USED BY THE OCCUPANT OF THE ROOM OR AREA TO
<br />CONTROL LIGHTING AND RECEPTACLE OUTLETS, APPLIANCES, OR
<br />COOLING, HEATING AND VENTILATION EQUIPMENT, SHALL NOT BE LESS
<br />THAN 3-FEET NOR MORE THAN 4-FEET ABOVE THE FLOOR OR WORKING
<br />PLATFORM.
<br />76.THE CENTER OF THE FIRE ALARM INITIATION DEVICES (BOXES)(IF
<br />PROVIDED) SHALL BE LOCATED 48-INCHES ABOVE THE LEVEL OF THE
<br />FLOOR, WORKING PLATFORM, GROUND SURFACE OR SIDEWALK.
<br />77.IF EMERGENCY WARNING SYSTEMS ARE REQUIRED THEY SHALL ACTIVATE
<br />A MEANS OF WARNING THE HEARING IMPAIRED. FLASHING VISUAL
<br />WARNING SHALL HAVE A FREQUENCY OF NOT MORE THAN 60 FLASHES
<br />PER MINUTE.
<br />78.FLOOR SURFACES SHALL BE SLIP RESISTANT MEETING THE REQUIREMENTS
<br />OF CALIFORNIA TITLE 24 AND ANSI A137.1
<br />79.IF TRENCHES OR EXCAVATIONS 5' OR MORE IN DEPTH ARE REQUIRED,
<br />G.C. TO OBTAIN NECESSARY ISSUANCE OF A BUILDING OR GRADING
<br />PERMIT.
<br />80.THE CONTRACTOR SHALL CHECK AND VERIFY SIZE AND LOCATION OF
<br />DUCT OPENINGS AND PLUMBING RUNS WITH MECHANICAL
<br />CONTRACTOR BEFORE FORMING WALLS, FLOORS, ETC.
<br />81.DEPUTY INSPECTOR SHALL BE REGISTERED WITH THE LOCAL AUTHORITY
<br />PRIOR TO INSPECTION OF WORK.
<br />82.THE CONSTRUCTION SHALL NOT RESTRICT A FIVE- FOOT CLEAR AND
<br />UNOBSTRUCTED ACCESS TO ANY WATER OR POWER DISTRIBUTION
<br />FACILITIES (POWER POLES, PULL-BOXES, TRANSFORMERS, VAULTS, PUMPS,
<br />VALVES, METERS APPURTENANCES, ETC.) OR TO THE LOCATION OF THE
<br />HOOKUP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY
<br />POWER LINES-WHETHER OR NOT THE LINES ARE LOCATED ON THE
<br />PROPERTY. FAILURE TO COMPLY MAY CAUSE CONSTRUCTION DELAYS
<br />AND/OR ADDITIONAL EXPENSES.
<br />83.AN APPROVED SEISMIC GAS SHUTOFF VALVE WILL BE INSTALLED ON THE
<br />FUEL GAS LINE ON THE DOWNSTREAM SIDE OF THE UTILITY METER AND BE
<br />RIGIDLY CONNECTED TO THE EXTERIOR OF THE BUILDING OR STRUCTURE
<br />CONTAINING THE FUEL GAS PIPING. (PER ORDINANCE 170,158)
<br />(SEPARATE PLUMBING PERMIT IS REQUIRED).
<br />84.PLUMBING FIXTURES ARE REQUIRED TO BE CONNECTED TO A SANITARY
<br />SEWER OR TO AN APPROVED SEWAGE DISPOSAL SYSTEM. R306.3
<br />85.KITCHEN SINKS, LAVATORIES, BATHTUBS, SHOWERS, BIDETS, LAUNDRY
<br />TUBS AND WASHING MACHINE OUTLETS SHALL BE PROVIDED WITH HOT
<br />AND COLD WATER AND CONNECTED TO AN APPROVED WATER SUPPLY.
<br />R306.4
<br />86.BATHTUB AND SHOWER FLOORS, WALLS ABOVE BATHTUBS WITH A
<br />SHOWERHEAD, AND SHOWER COMPARTMENTS SHALL BE FINISHED WITH
<br />A NONABSORBENT SURFACE. SUCH WALL SURFACES SHALL EXTEND TO A
<br />HEIGHT OF NOT LESS THAN 6 FEET ABOVE THE FLOOR. R307.2
<br />87.PROVIDE ULTRA-LOW FLUSH WATER CLOSETS FOR ALL NEW
<br />CONSTRUCTION. EXISTING SHOWER HEADS AND TOILETS MUST BE
<br />ADAPTED FOR LOW WATER CONSUMPTION.
<br />88.UNIT SKYLIGHTS SHALL BE LABELED BY A LA CITY APPROVED LABELING
<br />AGENCY. SUCH LABEL SHALL STATE THE APPROVED LABELING AGENCY
<br />NAME, PRODUCT DESIGNATION AND PERFORMANCE GRADE RATING.
<br />(RESEARCH REPORT NOT REQUIRED). R308.6.9
<br />89.WATER HEATER MUST BE STRAPPED TO WALL. SEC. 507.3, LAPC
<br />90.FOR EXISTING POOL ON SITE, PROVIDE AN ALARM FOR DOORS TO THE
<br />DWELLING THAT FORM A PART OF THE POOL ENCLOSURE. THE ALARM
<br />SHALL SOUND CONTINUOUSLY FOR A MIN. OF 30 SECONDS WHEN THE
<br />DOOR IS OPENED. IT SHALL AUTOMATICALLY RESET AND BE EQUIPPED
<br />WITH A MANUAL MEANS TO DEACTIVATE (FOR 15 SECS. MAX.) FOR A
<br />SINGLE OPENING. THE DEACTIVATION SWITCH SHALL BE AT LEAST 54"
<br />ABOVE THE FLOOR. 6109 OF LABC
<br />91.FOR EXISTING POOL ON SITE, PROVIDE ANTI– ENTRAPMENT COVER
<br />MEETING THE CURRENT ASTM OR ASME FOR THE SUCTION OUTLETS OF
<br />THE SWIMMING POOL, TODDLER POOL AND SPA FOR SINGLE FAMILY
<br />DWELLINGS PER ASSEMBLY BILL (AB) NO. 2977. 3162B
<br />92.AUTOMATIC GARAGE DOOR OPENERS, IF PROVIDED, SHALL BE LISTED IN
<br />ACCORDANCE WITH UL 325. R309.4
<br />93.SMOKE DETECTORS SHALL BE PROVIDED FOR ALL DWELLING UNITS
<br />INTENDED FOR HUMAN OCCUPANCY, WHERE A PERMIT IS REQUIRED FOR
<br />ALTERATIONS, REPAIRS, OR ADDITIONS. R314.2
<br />94.WHERE A PERMIT IS REQUIRED FOR ALTERATIONS, REPAIRS OR ADDITIONS,
<br />EXISTING DWELLINGS OR SLEEPING UNITS THAT HAVE ATTACHED
<br />GARAGES OR FUEL-BURNING APPLIANCES SHALL BE PROVIDED WITH A
<br />CARBON MONOXIDE ALARM IN ACCORDANCE WITH SECTION R315.2.
<br />CARBON MONOXIDE ALARMS SHALL ONLY BE REQUIRED IN THE SPECIFIC
<br />DWELLING UNIT OR SLEEPING UNIT FOR WHICH THE PERMIT WAS
<br />OBTAINED. R315.2
<br />95.EVERY SPACE INTENDED FOR HUMAN OCCUPANCY SHALL BE PROVIDED
<br />WITH NATURAL LIGHT BY MEANS OF EXTERIOR GLAZED OPENINGS IN
<br />ACCORDANCE WITH SECTION R303.1 OR SHALL BE PROVIDED WITH
<br />ARTIFICIAL LIGHT THAT IS ADEQUATE TO PROVIDE AN AVERAGE
<br />ILLUMINATION OF 6 FOOT-CANDLES OVER THE AREA OF THE ROOM AT A
<br />HEIGHT OF 30 INCHES ABOVE THE FLOOR LEVEL. R303.1
<br />96.A COPY OF THE EVALUATION REPORT AND/OR CONDITIONS OF LISTING
<br />SHALL BE MADE AVAILABLE AT THE JOB SITE
<br />33.THE OWNER, ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM
<br />PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT
<br />ALL TIMES DURING NORMAL WORKING HOURS.
<br />34.THE CONTRACTOR SHALL LEAVE THE BUILDINGS IN A LOCKABLE
<br />CONDITION DURING THE PERIOD OF THIS WORK WHEN THE
<br />CONTRACTOR'S WORKMEN ARE NOT ACTUALLY ON THE JOB.
<br />35.THE SITE AND PREMISES SHALL BE KEPT CLEAN AND HAZARD-FREE. THE
<br />CONTRACTOR AND EACH SUBCONTRACTOR SHALL BE RESPONSIBLE
<br />FOR MAINTAINING HIS EQUIPMENT, MATERIALS AND WORK IN A NEAT,
<br />CLEAN, ORDERLY AND SAFE CONDITION AT ALL TIMES.
<br />36.DEACTIVATE ALL UTILITY LINES IN CONTRACT AREA BEFORE STARTING
<br />WORK. SECURE PERMISSION FROM THE OWNER PRIOR TO
<br />DEACTIVATION.
<br />37.BRACING AND TEMPORARY SUPPORTS SHALL BE PROVIDED AS
<br />REQUIRED TO HOLD THE WORK SECURELY IN PLACE AND SUSTAIN ALL
<br />LOADS THAT MAY OCCUR DURING ERECTION AND UNTIL SUBSEQUENT
<br />CONSTRCTION IS ADEQUATE TO REPLACE TEMPORARY BRACING.
<br />38.ALL MATERIALS SHALL BE NEW, OR GRADE SPECIFIED AND BE
<br />GUARANTEED AGAINST INHERENT AND/OR DEVELOPED DEFECTS.
<br />39.WOOD SILLS AND OTHER WOOD MEMBERS IN CONTACT WITH
<br />CONCRETE NEXT TO THE EARTH AND EXPOSED TO THE WEATHER SHALL
<br />BE PRESSURE TREATED.
<br />40.NO STRUCTURAL MEMBERS SHALL BE CUT FOR PIPES, VENTS, DUCTS AND
<br />OTHER SIMILAR OPENINGS EXCEPT AS DETAILED OR SPECIFIED.
<br />41.2 INCH SOLID BLOCKING SHALL BE PLACED BETWEEN RAFTERS AT ALL
<br />POINTS OF SUPPORT UNLESS SPECIFICALLY CALLED OUT TO BE OMITTED.
<br />42.ALL BOLTS SHALL BE FITTED WITH STANDARD CUT WASHERS. HOLES FOR
<br />BOLTS IN LUMBER SHALL BE BORED WITH A BIT WHOSE DIAMETER IS 1/32"
<br />LARGER THAN THE NOMINAL BOLT DIAMETER.
<br />43.INSTALL FIREBLOCKING AND DRAFTSTOPPING AS PER SECTION 718, OF
<br />THE C.B.C.
<br />44.INSTALL FLASHING FOR ALL ROOF OPENINGS AS PER SECTION 1503 OF
<br />THE C.B.C.
<br />45.ALL LATH AND PLASTER SHALL COMPLY WITH SECTION 2507 OF THE
<br />C.B.C
<br />46.NON-STRUCTURAL PARTITIONS MAY BE FASTENED TO THE FLOOR SLAB
<br />WITH "RAMSET" ICBO#1639, 7/32" X 3-1/2" "TRUSSET" DRIVE PINS WITH
<br />DISCS @ 3'-0" O.C. IN LIEU OF 1/2"Ø X 10" BOLTS@ 6'-0" O.C. (1'-0"
<br />MINIMUM FROM ENDS).
<br />47.ALL UTILITY SERVICES SHALL BE INSTALLED COMPLETELY READY FOR USE
<br />INCLUDING CONNECTIONS TO ALL MAINS. CONFER WITH AND OBTAIN
<br />PERMITS FROM ALL UTILITY COMPANIES.
<br />48.WINDOW AND DOOR DIMENSIONS FOR PREFABRICATED WINDOW AND
<br />DOOR UNITS HAVE BEEN ROUNDED TO THE NEAREST INCH ON THE
<br />DRAWINGS. SPECIFIC DIMENSIONS BY MANUFACTURERS MAY VARY
<br />FROM THE DRAWINGS.
<br />49.ALL EXTERIOR DOORS AND WINDOWS SHALL BE WEATHERPROOFED.
<br />50.GLAZING USED FOR DOORS AND PANELS FOR SHOWER AND BATHTUB
<br />ENCLOSURES SHALL BE LAMINATED GLASS (1/8" MIN,) OR APPROVED
<br />PLASTIC.
<br />51.GLASS DOORS, ADJACENT PANELS AND OTHER GLAZED PANELS WITHIN
<br />18" OF THE FLOOR SHALL BE TEMPERED GLASS.
<br />52.SMOKE DETECTORS SHALL BE LOCATED IN ALL SLEEPING ROOMS, AREAS
<br />LEADING TO SLEEPING ROOMS AND ALL AREAS REQUIRED TO HAVE A
<br />SMOKE DETECTOR IN ACCORDANCE WITH LOCAL CODES. ALL SMOKE
<br />DETECTORS SHALL BE INTERCONNECTRED, PERMANENTLY WIRED TO THE
<br />BUILDING, AND HAVE A BATTERY BACKUP.
<br />53.IN LIEU OF REQUIRED OPENINGS FOR NATURAL VENTILATION IN
<br />BATHROOMS CONTAINING A TUB OR SHOWER OR COMBINATION
<br />THEREOF, LAUNDRY ROOMS AND SIMILAR ROOMS, A MECHANICAL
<br />VENTILATION SYSTEM CONNECTED DIRECTLY TO THE OUTSIDE CAPABLE
<br />OF PROVIDING 5 AIR CHANGES AN HOUR SHALL BE PROVIDED. THE
<br />POINT OF DISCHARGE OF EXHAUST AIR SHALL BE AT LEAST 3 FEET FROM
<br />ANY OPENING INTO THE BUILDING. BATHROOMS WHICH CONTAIN ONLY
<br />A WATER CLOSET OR LAVATORY OR COMBINATION THEREOF AND
<br />SIMILAR ROOMS MAY BE VENTILATED WITH AN APPROVED
<br />MECHANICAL RECIRCULATING FAN OR SIMILAR DEVICE DESIGNED TO
<br />REMOVE ODORS FROM THE AIR.
<br />54.NEWLY INSTALLED BATHROOM EXHAUST FANS SHALL BE ENERGY STAR
<br />COMPLIANT AND BE DUCTED TO TERMINATE TO THE OUTSIDE OF THE
<br />BUILDING (9.506.1).
<br />55.NEWLY INSTALLED BATHROOM EXHAUST FANS, NOT FUNCTIONING AS A
<br />COMPONENT OF A WHOLE HOUSE VENTILATION SYSTEM, MUST BE
<br />CONTROLLED BY HUMIDISTAT WHICH SHALL BE READILY ACCESSIBLE
<br />(9.506.1).
<br />56.AN APPROVED CARBON MONOXIDE ALARM SHALL BE INSTALLED IN
<br />DWELLING UNITS AND IN SLEEPING UNITS WITHIN WHICH FUEL-BURNING
<br />APPLIANCES ARE INSTALLED AND IN DWELLING UNITS THAT HAVE
<br />ATTACHED GARAGES. CARBON MONOXIDE ALARMS SHALL BE
<br />PROVIDED OUTSIDE OF EACH SEPARATE DWELLING UNIT SLEEPING AREA
<br />IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EVERY LEVEL
<br />OF A DWELLING UNIT INCLUDING BASEMENT UNITS (R315).
<br />57.THE STRUCTURAL PLANS SHALL BE USED IN CONJUCTION WITH
<br />ARCHITECTURAL, MECHANICAL AND ELECTRICAL PLANS AND THE
<br />STAMPED APPROVED ARCHITECTURAL / STRUCTURAL SET OF PLANS
<br />SHALL BE KEPT ON THE JOB SITE AND BE MADE AVAILABLE TO
<br />AUTHORIZED REPRESENTATIVES FROM THE DEPARTMENT OF BUILDING
<br />AND SAFETY.
<br />58.WHERE CONTINUOUS INSPECTION IS REQUIRED IT SHALL BE PERFORMED
<br />BY A REGISTERED DEPUTY INSPECTOR WHOSE QUALIFICATIONS AND
<br />PERFORMANCE ON THE JOB SHALL BE SUBJECT TO THE APPROVAL OF
<br />THE DEPARTMENT OF BUILDING AND SAFETY.
<br />59.HARDWARE CALL OUTS MAY BE SUBSTITUTED BY EQUIVALENT
<br />HARDWARE ONLY UPON THE APPROVAL OF THE ENGINEER.
<br />ENGINEERING CATALOG OR BROCHURE OF EQUIVALENT HARDWARE
<br />MUST BE SUBMITTED TO THE ENGINEER WHEN REQUESTING SUBSTITUTION.
<br />60.NO DEVIATIONS WILL BE MADE FROM THE ARCHITECTURAL /
<br />STRUCTURAL PLANS AND DETAILS WITHOUT THE WRITTEN APPROVAL OF
<br />THE ARCHITECT AND/OR ENGINEER. APPROVAL BY THE CITY INSPECTOR
<br />DOES NOT CONSTITUTE AUTHORITY TO DEVIATE FROM THE PLANS AND /
<br />OR SPECIFICATIONS.
<br />61.THE WORD "TYPICAL", AS IT IS USED ON THESE PLANS, REFERS TO ITEMS
<br />OUTLINED ON A SPECIFIC DETAIL AND THAT ARE VALID ANDE REPEAT
<br />THEMSELVES IN THE SAME OR SIMILAR DETAILS REFERRED TO IN OTHER
<br />AREAS OF THE PLANS.
<br />62.RECESSED LIGHTS AT INSULATED CEILINGS SHALL BE UL LISTED FOR
<br />DIRECT CONTACT WITH INSULATION. (ITC FIXTURES).
<br />63.EXTERIOR STUCCO SHALL COMPLY WITH CHAPTER 25 C.B.C. PROVIDE
<br />SEPARATE INSPECTION FOR EACH PHASE OF EXTERIOR PLASTER AS
<br />FOLLOWS: SCRATCH COAT, BROWN COAT, AND COLOR COAT.
<br />64.TILE MUST BE APPLIED OVER CEMENT PLASTER BACKING AT SURFACES
<br />SUBJECT TO WATER SPLASH. (SHOWERS, TUBS AND COMMERCIAL
<br />RESTROOMS, ETC).
<br />65.NO GALVANIZED WATER PIPING ALLOWED WITHIN THE BUILDING.
<br />66.PROVIDE MOIST-STOP FLASHING AROUND ALL NEW WINDOWS, DOORS
<br />AND OTHER OPENINGS.
<br />67.PROVIDE BITUTHENE AT OTHER NEEDED LOCATIONS SUCH AS
<br />INTERSECTING EXTERIOR CONSTRUCTION SURFACES, SMALL EXTERIOR
<br />SHELVES AND AT EXTERIOR PENETRATION.
<br />68.PROVIDE ONLY FURRING NAILS AT ALL WIRE LATH THAT SUPPORTS
<br />STUCCO.
<br />69.FOLLOW ALL MANUFACTURER'S REQUIREMENTS REGARDING
<br />SPECIFICATIONS, ASSEMBLIES, MATERIALS, AND ADVISE ARCHITECT OF
<br />ANY DISCREPANCIES OR CONTRADICTIONS WITH THESE DOCUMENTS.
<br />70.EXPANSION ANCHORS BY HILTI SHALL BE AT 4'-0" O.C. MAX. TYPICAL &
<br />HAVE L.A. R.R. #23272 & I.C.B.O. #1372
<br />71.SHOT PINS BY HILTI SHALL BE AT 4' - 0" O.C. MAX. TYPICAL & SHALL HAVE
<br />L.A. R.R. #2582 & I.C.B.O.#1609
<br />72.PROVIDE 2 COATS CLEAR INDUSTRIAL GLOSS ENAMEL OVER PRIMER ON
<br />ALL EXPOSED STRUCTURAL STEEL MEMBERS, STEEL SUPPORT, STRUCTURAL
<br />RAILINGS, PIPE CHANNELS AND BRACING, U.N.O.
<br />73.UNLESS NOTED OTHERWISE NOTED, ALL CONCRETE SURFACES TO BE
<br />PAINTED SHALL RECEIVE A MINIMUM OF THREE COATS OR TWO COATS
<br />ON PRIMER. CONCRETE TO BE ONE COAT OVER PRIMER.
<br />74.THE CENTER OF RECEPTACLE OUTLETS SHALL NOT BE LESS THAN
<br />12-INCHES ABOVE THE FLOOR OR WORKING AREA.
<br />HOLD-2001 S Birch
<br />St10/30/2024
|