My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1927 & 1929 S Hickory St - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hickory St
>
1927 S Hickory St
>
1927 & 1929 S Hickory St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:19:07 PM
Creation date
6/6/2025 1:18:33 PM
Metadata
Fields
Template:
Plan
Permit Number
102121150
Full Address
1927 S Hickory St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
· During and after excavation for footings to verify the adequacy of underlying materials. <br /> <br />· After pre-saturation of slab subgrade earth materials, if any, prior to pouring concrete. <br /> <br />· After compaction of subgrade soils and/or aggregate base for exterior slabs and or <br />driveway, if any. <br /> <br />· During backfill of drainage and utility line trenches, if any, to verify proper compaction. <br /> <br />· When/If any unusual geotechnical conditions are encountered. <br /> <br />Note: If Geotechnical International is not provided the opportunity to perform the geotechnical <br />observation/testing during the construction phase, Geotechnical International will take no <br />responsibility for the conclusions and recommendations contained in our report in the event <br />that subsurface conditions differ from those interpreted and anticipated during our preliminary <br />investigation phase prior to the start of construction. <br />CLOSURE <br />The conclusion and recommendations contained in this report are presented based on <br />geotechnical data as described herein which are believed representative of the total project <br />area. However, earth materials can vary in characteristics, both laterally and vertically, and <br />those variations could affect the conclusions and recommendations contained herein. As such, <br />observation and testing by a qualified geotechnical consultant during the construction phase of <br />the project are essential to confirming the basis of this report. <br />This report has been prepared consistent with that level of care being provided by other <br />professionals providing similar services at the locale and time period. The contents of this <br />report are professional opinions and as such, are not to be considered a guaranty or warranty. <br />This report should be reviewed and updated after a period of one year or if the lot ownership <br />or site conditions / proposed development change from that described herein. <br />The following are attached and complete our report: <br /> Appendix A - References <br />Appendix B-Geotechnical Log of Test Hole and Laboratory Test Results <br />Appendix C-Seismic Data <br />Figure 1 - Vicinity Map <br />Figure 2-Site Plan/Geotechnical Map <br />1927 & 1929 S <br />Hickory St2/12/2025
The URL can be used to link to this page
Your browser does not support the video tag.