Laserfiche WebLink
X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />GFI <br />FE <br />+85" <br />K <br />5'-8" MIN. <br />ABBREVIATIONS,NOTES, <br />SYMBOLS,INDEX, MAP, <br />BUILDING DATA, ETC. <br />A-0.1 <br />ARCHITECTURAL PLANS <br />A-0.1 ABBREVIATIONS,NOTES, SYMBOLS,INDEX, MAP, BUILDING DATA, ETC. <br />A-0.2 GENERAL NOTES <br />A-0.3 GENERAL NOTES AND SPECIFICATIONS <br />A-0.4 OVERALL SITE PLAN <br />A-0.5 SITE PLAN AND ACCESSIBLE PATH OF TRAVEL <br />A-0.5A EXISTING AND PROPOSED OVERALL FIRST FLOOR PLAN <br />A-0.5B EXISTING AND PROPOSED OVERALL 2ND FLOOR PLAN <br />A-0.6 BASE BUILDING ACCESSIBILITY NOTES <br />A-0.6B BASE BUILDING ACCESSIBILITY NOTES <br />A-0.7 FIRST FLOOR - ENLARGED RESTROOM PLANS <br />A-0.7A FIRST FLOOR - ENLARGED RESTROOM PLANS <br />A-0.7B FIRST FLOOR - ENLARGED RESTROOM PLANS <br />A-0.7C FIRST FLOOR - ENLARGED RESTROOM PLANS <br />A-.07D SECOND FLOOR - ENLARGED RESTROOM PLANS <br />A-0.8A ENLARGED SITE PLAN EAST PARKING LOT - DEMOLITION PLAN <br />A-0.8B ENLARGED SITE PLAN EAST PARKING LOT - CONSTRUCTION PLAN <br />A-0.8C ENLARGED SITE PLAN EAST PARKING LOT - DEMOLITION AND CONSTRUCTION PLAN <br />A-0.8D ENLARGED SITE PLAN SOUTH EAST PARKING LOT - DEMOLITION AND CONSTRUCTION PLAN <br />A-0.8E ENLARGED SITE PLAN WEST PARKING LOT - DEMOLITION AND CONSTRUCTION PLAN <br />A-0.8F ENLARGED SITE PLAN SOUTH PARKING LOT - DEMOLITION AND CONSTRUCTION PLAN <br />A-0.8G ENLARGED SITE PLAN SOUTH PARKING LOT - DEMOLITION AND CONSTRUCTION PLAN <br />A-0.9 RAMP ENLARGED PLANS, ELEVATIONS, AND SITE DETAILS <br />A-0.9A EXTERIOR ELEVATIONS - CANOPIES AND FENCING <br />A-0.9B EXTERIOR ELEVATIONS - FENCING <br />A-30.0 DETAILS <br />STRUCTURAL PLANS <br />S1.1 GENERAL NOTES <br />S1.1.1 GENERAL NOTES <br />S2.0 OVERALL SITE PLAN <br />A3.1 SECTIONS AND DETAILS <br />ELECTRICAL PLANS (FOR REFERENCE ONLY) <br />E-0.1 ELECTRICAL LEGEND, NOTES, INDEX, AND ABBREVIATIONS <br />E-0.2 TITLE-24 INDOOR LIGHTING COMPLIANCE FORMS <br />E-0.3 GENERAL ELECTRICAL SPECIFICATIONS <br />E-1.1 LIGHTING SCHEDULE + DETAILS <br />E-2.1A 1ST FLOOR - POWER PLAN <br />A-2.1B 1ST FLOOR - DEMO POWER PLAN + POWER PLAN <br />A-3.1A 1ST FLOOR LIGHTING PLAN <br />A-3.1B 1ST FLOOR LIGHTING PLAN <br />PLUMBING PLANS (FOR REFERENCE ONLY) <br />P-0.1 PLUMBING LEGENDS, NOTES, INDEX, SCHEDULES, AND ABBREVIATIONS <br />P-0.2 PLUMBING DETAILS <br />P-0.3 PLUMBING SPECIFICATIONS <br />P-0.4 PLUMBING SPECIFICATIONS <br />P-1.1A PLUMBING DEMOLITION PLAN - 1ST FLOOR <br />P-1.1B PLUMBING DEMOLITIONS PLAN - 1ST FLOOR <br />P-2.1A PLUMBING NEW PLAN - 1ST FLOOR <br />P-2.1B PLUMBING NEW PLAN - 1ST FLOOR <br />CIVIL PLANS (FOR REFERENCE ONLY) <br />C-1.00 GENERAL NOTES, SHEET INDEX, LEGENDS AND ABBREVIATIONS <br />C-1.01 REFERENCE SURVEY <br />C-1.02 REFERENCE SURVEY <br />CD-1.00 SITE DEMOLITION PLAN <br />C-2.00 SITE CONTROL PLAN <br />C-2.01 CURVE DATA <br />C-3.00 SITE GRADING PLAN <br />C-5.00 MISCELLANEOUS DETAILS <br />C-6.00 EROSION CONTROL PLAN <br />C-6.01 EROSION CONTROL DETAILS <br />1. BUILDING PERMIT INFORMATION <br />BUILDING 1700 E ST ANDREW PL <br />ADDRESS:SANTA ANA, CA 92705 <br />BUILDING OWNER:MICHAEL EMBREE <br />DRAWBRIDGE SAINT ANDREW, LLC <br />3 EMBARCADERO CTR., SUITE 2310 <br />SAN FRANCISCO, CA 94111 <br />PHONE: 415-391-4440 <br />CONSTRUCTION TYPE:II-B <br />OCCUPANCY:B <br />SPRINKLER BUILDING:YES <br />NUMBER OF FLOORS:3 <br />TOTAL SITE AREA:±439,770 <br />TOTAL BUILDING AREA:1ST FLOOR ±74,172 SQ. FT. <br />2ND FLOOR ±56,414 SQ. FT. <br />3RD FLOOR ±39,466 SQ. FT. <br />TOTAL AREA ±170,052 SQ. FT. <br />AREA OF WORK:SITE ±45,500 SQ. FT. <br />1ST FLOOR ±1,965 SQ. FT. <br />2ND FLOOR ±855 <br />SCOPE OF WORK:TENANT IMPROVEMENT WORK ON 2,820 SQ. FT. OF THE TOTAL <br />FLOOR AREA ON THE FIRST AND SECOND FLOOR TO UPDATE <br />RESTROOMS TO BE ACCESSIBLY COMPLIANT. SITE IMPROVEMENTS <br />ON 45,500 SQ. FT. OF ACCESSIBILITY UPGRADES TO THE PARKING <br />STALLS AND PATH OF TRAVEL. ADDITIONAL SITE IMPROVEMENT <br />SCOPE INCLUDES NEW FENCING, NEW CANOPIES, AND LIGHTING <br />OVER DOORS AT CANOPIES. <br />2. C.E.C. TITLE 24/DISABLE ACCESS COMPLIANCE <br />THE PROJECT SHALL COMPLY WITH CCR TITLE 24 (PART 6 - CALIFORNIA ENERGY CODE) FOR ENERGY COMPLIANCE AND <br />THE AMERICANS WITH DISABILITIES ACT (ADA) FOR DISABLED ACCESS REQUIREMENTS. <br />3. EXISTING LIFE-SAFETY SYSTEMS TO BE MODIFIED <br />EXISTING FIRE/LIFE SAFETY SYSTEM IS TO BE MODIFIED TO COMPLY TO CURRENT FIRE/LIFE SAFETY STANDARDS. REFER <br />TO ELECTRICAL ENGINEER DRAWING FOR SCOPE OF WORK. <br />4. CODE COMPLIANCE <br />THE PROJECT SHALL COMPLY WITH CODES, ORDINANCES, OR LAWS HAVING JURISDICTION ON THE PROJECT. WHICH <br />INCLUDE, BUT ARE NOT LIMITED TO: <br /> 2022 CALIFORNIA BUILDING CODE - ( PART 2, TITLE 24, CCR ) <br /> 2022 CALIFORNIA ELECTRICAL CODE- ( PART 3, TITLE 24, CCR ) <br /> 2022 CALIFORNIA MECHANICAL CODE- ( PART 4, TITLE 24, CCR ) <br /> 2022 CALIFORNIA PLUMBING CODE- ( PART 5, TITLE 24, CCR ) <br /> 2022 CALIFORNIA FIRE CODE- (PART 9, TITLE 24, CCR ) <br /> 2022 CALIFORNIA BUILDING STANDARDS CODE ( PART 12, TITLE 24, CCR ) <br /> AMERICANS WITH DISABILITIES ACT (ADA) <br />5. SEPARATE PERMITS <br />KEY PLAN <br />LOCATION PLAN <br />PROJECT INFORMATION DRAWING INDEX <br />AS NOTED <br />N <br />1. LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALL <br />SCALE DRAWINGS. DETAILS TAKE PRECEDENCE OVER ALL. NOTIFY ARCHITECT OF <br />CONFLICTS OR DISCREPANCIES IN WRITING. <br />2. DIMENSION CONVENTIONS: <br />a) HORIZONTAL DIMENSIONS ARE SHOWN FROM FACE OF FINISH, UNLESS OTHERWISE NOTED. <br />b) DIMENSIONS NOTED "CLEAR" OR "CLR." MUST BE PRECISELY MAINTAINED: ALLOWING FOR THICKNESS OR <br />MATERIALS. <br />c) DIMENSIONS ARE NOT ADJUSTABLE WITHOUT ARCHITECT'S APPROVAL, UNLESS NOTED. <br />d) DIMENSIONS TO EXTERIOR WINDOW WALL ARE TO INSIDE FINISHED FACE OF THE WALL, UNLESS OTHERWISE <br />NOTED. <br />e) DIMENSIONS TO EXTERIOR GLAZING ARE TO THE INSIDE FACE OF THE EXTERIOR GLAZING. <br />f) VERTICAL DIMENSIONS ARE FROM THE TOP OF THE FINISHED FLOOR, UNLESS OTHERWISE NOTED. <br />g) DO NOTE SCALE DRAWINGS. IF ANY ITEM OF WORK CANNOT BE LOCATED, DO NOT PROCEED WITH THE WORK <br />BEFORE CLARIFYING WITH ARCHITECT. <br />h) VERIFY DIMENSIONS MARKED "V.I.F." PRIOR TO START OF CONSTRUCTION. REPORT INCONSISTENCIES TO <br />ARCHITECT. <br />3. DEFINITION OF TERMINOLOGY: <br />i) "TYPICAL" MEANS IDENTICAL FOR ALL CONDITIONS, UNLESS OTHERWISE NOTED. <br />j) "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. VERIFY DIMENSIONS AND <br />ORIENTATION ON PLANS AND ELEVATIONS. <br />k) "PROVIDE" MEANS FURNISH AND INSTALL, COMPLETE AND IN PLACE. <br />l) "FURNISH" MEANS FURNISH ONLY, INSTALLATION BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED. <br />m) "INSTALL" MEANS PUT INTO PLACE, SUPPLIED BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED. <br />n) "ALIGN" MEANS ACCURATELY LOCATE FINISH FACES IN THE SAME PLANE. <br />DRAFTING CONVENTION NOTES <br />FIRE PREVENTION <br />A8.4 <br />12 <br />A8.4 <br />12 <br />A <br />1 <br />12 <br />A8.4 <br />COLUMN GRID LINES <br />WORK POINT <br />CONTROL POINT <br />DATUM POINT <br />MATCH LINE <br />SHADED PORTION IS SIDE <br />CONSIDERED <br />DETAIL NUMBER <br />SHEET NUMBER <br />AREA OF DETAIL <br />THICKENED LINE <br />SHOWS <br />AREA OF SECTION <br />DETAIL <br />WALL SECTION KEY <br />DETAIL NUMBER <br />SHEET NUMBER <br />VIEW DIRECTION <br />DRAFTING CONVENTIONS <br />N.I.C. <br />C <br />D <br />A <br />A <br />B <br />INTERIOR ELEVATION <br />DETAIL NUMBER <br />SHEET NUMBER <br />VIEW(S) SHOWN <br />KEYNOTE <br />ALIGN SURFACES <br />NO WORK IN THIS AREA <br />(N.I.C.) <br />OWNER FURNISHED <br />ITEM <br />(NOT IN CONTRACT) <br />ADDENDUM <br />ADDENDUM LETTER <br />AREA OF REVISION <br />INSTALLED MILLWORK <br />1 REVISION <br />REVISION NUMBER <br />AREA OF REVISION <br />1.0 <br />N <br />NORTH <br />CL CENTER LINE <br /># <br />' <br />" <br />@ <br />& AND <br />ANGLE <br />AT <br />CENTERLINE <br />CHANNEL <br />DIAMETER OR ROUND <br />FOOT (FEET) <br />INCH (INCHES) <br />PERPENDICULAR <br />POUND OR NUMBER <br />SQUARE FOOT (FEET) <br />CL <br />ABV ABOVE <br />A/C AIR CONDITIONING <br />ACC ACCESS <br />ACOUS ACOUSTICAL <br />ACT ACOUSTIC TILE <br />ADJ ADJUSTABLE <br />AD ACCESS DOOR <br />AFF ABOVE FINISHED FLOOR <br />AL ACTIVE LEAF <br />ALUM ALUMINUM <br />ALT ALTERNATE <br />ANOD ANODIZED <br />AP ACCESS PANEL <br />APPROX` APPROXIMATE <br />APPV APPROVED <br />ARCH ARCHITECTURAL <br />AUTO AUTOMATIC <br />AVG AVERAGE <br />BD BOARD <br />BATT INSUL BATTEN INSULATION <br />BJ BUTT JOINT <br />BKG BACKING <br />BLDG BUILDING <br />BLK BLOCK <br />BLKG BLOCKING <br />BM BEAM <br />BMK BENCH MARK <br />BOW BACK OF WALL <br />BOT BOTTOM <br />BRKT BRACKET <br />BTWN BETWEEN <br />CAB CABINET <br />CLG CEILING <br />CLKG CAULKING <br />CLO CLOSET <br />CLR CLEAR <br />COL COLUMN <br />CONC CONCRETE <br />CONF CONFERENCE <br />CONN CONNECTION <br />CONSTR CONSTRUCTION <br />CONT CONTINUOUS <br />CORR CORRIDOR <br />CPT CARPET <br />CSMT CASEMENT <br />CT CERAMIC TILE <br />CTR CENTER <br />CWK CASEWORK <br />CFCI CONTRACTOR FURNISHED <br />CONTRACTOR INSTALLED <br />CIR CIRCULAR <br />CJ CONTROL JOINT <br />CNTR COUNTER <br />DBL DOUBLE <br />DEMO DEMOLISH (DEMOLITION) <br />DEPT DEPARTMENT <br />DET DETAIL <br />DF DRINKING FOUNTAIN <br />DIA DIAMETER <br />DIM DIMENSION <br />DISP DISPENSER <br />DIV DIVISION <br />DN DOWN <br />DO DOOR OPENING <br />DR DOOR <br />DW DISH-WASHER <br />DWG DRAWING <br />DWR DRAWER <br />DIAG DIAGONAL <br />E EAST <br />(E) EXISTING <br />EA EACH <br />EL ELEVATION <br />ELEC ELECTRICAL <br />ELEV ELEVATOR <br />EMER EMERGENCY <br />ENAM ENAMEL <br />ENCL ENCLOSURE <br />ENG ENGINEER <br />ENT ENTRANCE <br />EQ EQUAL <br />EQPT EQUIPMENT <br />EWC ELECTRIC WATER COOLER <br />EXH EXHAUST <br />EXP EXPANSION <br />EXPO EXPOSED <br />EXT EXTERIOR <br />FA FIRE ALARM <br />FD FLOOR DRAIN <br />FDC FIRE DEPARTMENT CONNECTION <br />FDN FOUNDATION <br />FE FIRE EXTINGUISHER <br />FEC FIRE EXTINGUISHER CABINET <br />FF FINISH FACE <br />FHC FIRE HOSE CABINET <br />FIN FINISH <br />FIX FIXTURE <br />FLR FLOOR <br />FLUOR FLUORESCENT <br />FO FACE OF <br />FRPF FIREPROOF <br />FR FIRE RESISTANT <br />FRMG FRAMING <br />FS FULL SIZE <br />FT FOOT OR FEET <br />FOC FACE OF CONCRETE <br />FOS FACE OF STUDS <br />FOW FACE OF WALL <br />FES FIR EXTINGUISHER SURFACE MOUNTED <br />FD FLOOR DRAIN <br />FURG FURRING <br />GB GRAB BAR <br />GD GARBAGE DISPOSAL <br />GEN GENERAL <br />GL GLASS <br />GND GROUND <br />GYP GYPSUM <br />GA GAGE OF GAUGE <br />GALV GALVANIZED <br />G GAS <br />GYP BD GYPSUM WALLBOARD <br />GC GENERAL CONTRACTOR <br />HDCP HANDICAPPED <br />HDF HIGH DENSITY FIBERBOARD <br />HDWD HARDWOOD <br />HDWE HARDWARE <br />HM HOLLOW METAL <br />HO HOLD OPEN <br />HOR HORIZONTAL <br />HR HOUR <br />HR HAND RAIL <br />HT HEIGHT <br />HVAC HEATING VENTING AIR CONDITIONING <br />HW HOT WATER <br />HWH HOT WATER HEATER <br />HDR HANDRAIL <br />HBD HARDBOARD <br />HTR HEATER <br />HT HEIGHT <br />HC HOLLOW CORE <br />HMI HOLLOW METAL INSULATED <br />INCAN INCANDESCENT <br />INCL INCLUDING <br />INFO INFORMATION <br />INSUL INSULATION <br />INT INTERIOR <br />INTER INTERMEDIATE <br />IN INCH <br />ID INSIDE DIAMETER <br />IDENT IDENTIFICATION <br />JAN JANITOR <br />JB JUNCTION BOX <br />JUNC JUNCTION <br />JT JOINT <br />JST JOIST <br />LTG LIGHTING <br />LTWT LIGHT WEIGHT <br />LIN LINEAR <br />LONG LONGITUDINAL <br />LP LOW POINT <br />LKR LOCKER <br />LVR LOUVER <br />MAX MAXIMUM <br />MDF MEDIUM DENSITY FIBERBOARD <br />MECH MECHANICAL <br />MED MEDIUM <br />MEMB MEMBRANE <br />MET METAL <br />MEZZ MEZZANINE <br />MFR MANUFACTURER <br />MIC MICROWAVE <br />MIN MINIMUM <br />MIR MIRROR <br />MISC MISCELLANEOUS <br />MUL MULLION <br />MACH MACHINE <br />MAINT MAINTENANCE <br />MSTC MASTIC <br />MATL MATERIAL <br />MT METALTHRESHOLD <br />MLDG MOLDING <br />MTD MOUNTED <br />N NORTH <br />N NEW <br />NAT NATURAL <br />NIC NOT IN CONTRACT <br />NO NUMBER <br />NOM NOMINAL <br />NRC NOISE REDUCTION COEFFICIENT <br />NTS NOT TO SCALE <br />OC ON CENTER <br />OD OUTSIDE DIAMETER DIMENSION <br />OFCI OWNER FURNISHED <br />CONTRACTOR INSTALLED <br />OH OPPOSITE HAND <br />OPNG OPENING <br />OVHD OVERHEAD <br />OFF OFFICE <br />OFOI OWNER FURNISHED <br />OWNER INSTALLED <br />P PAINT <br />PAR PARALLEL <br />PBD PARTICLE BOARD <br />PC PERSONAL COMPUTER <br />PC PIECE <br />PERP PERPENDICULAR <br />PL PLATE <br />PLAM PLASTIC LAMINATE <br />PLAS PLASTER <br />PLYWD PLYWOOD <br />PNL PANEL <br />POL POLISH <br />PR PAIR <br />PTN PARTITION <br />PTD PAPER TOWEL DISPENSER <br />PTDR PAPER TOWEL DISPENSER RECEPTACLE <br />PTR PAPER TOWEL RECEPTACLE <br />PLBG PLUMBING <br />PT POINT <br />LBS POUNDS <br />PSF POUND SQUARE FOOT <br />PSI POUND SQUARE INCH <br />PRCST PRECAST <br />PREFAB PREFABRICATED <br />PROJ PROJECTION <br />QTY QUANTITY <br />QUAL QUALITY <br />QT QUARRY TILE <br />QTRS QUARTERS <br />R RISER <br />R RELOCATED <br />RA RETURN AIR <br />RAD RADIUS <br />RB RESILIENT BASE <br />REBAR REINFORCING BAR <br />REF REFERENCE <br />REFL REFLECTED <br />REFR REFRIGERATOR <br />REINF REINFORCED <br />REQ REQUIRED <br />RESIL RESILIENT <br />REV REVISION / REVISED <br />RH RIGHT HAND <br />RM ROOM <br />RO ROUGH OPENING <br />RT RESILIENT TILE <br />RUB RUBBER <br />RND ROUND <br />RB RUBBER BASE <br />S SOUTH <br />SA SUPPLY AIR <br />SC SOLID CORE <br />SCH SCHEDULE <br />SFEC SEMI-RECESSED FIRE <br />EXTINGUISHER CABINET <br />SHT SHEET <br />SIM SIMILAR <br />SK SINK <br />SMD SEE MECHANI <br />SND SANITARY NAPKIN DISPENSOR <br />SNR SANITARY NAPKIN RECEPTACLE <br />SPD SEE PLUMBING DRAWINGS <br />SPEC SPECIFICATION (S) <br />SPKR SPEAKER <br />SQ SQUARE <br />SSD SEE STRUCTURAL DRAWINGS <br />STD STANDARD <br />STL STEEL <br />STOR STORAGE <br />STRL STRUCTURAL <br />SUR SURFACE <br />SUSP SUSPENDED <br />SYM SYMMETRICAL <br />SYS SYSTEM <br />SCD SEAT COVER DISPENSER <br />SECT SECTION <br />SSK SERVICE SINK <br />SD SOAP DISPENSER <br />SM SHEET METAL <br />STA STATION <br />T TREAD <br />TAN TANGENT <br />TBD TO BE DETERMINED <br />TEL TELEPHONE <br />TEMP TEMPERED <br />THRES THRESHOLD <br />THRU THROUGH <br />TO TOP OF <br />TPD TOILET PAPER DISPENSER <br />TV TELEVISION <br />TYP TYPICAL <br />TEMP TEMPERATURE <br />TER TERRAZZO <br />TOIL TOILET <br />TOC TOP OF CONCRETE <br />TC TOP OF CURB <br />TOS TOP OF STEEL <br />TS TUBULAR STEEL <br />TW TOP OF WALL <br />TB TOWEL BAR <br />UNF UNFINISHED <br />UON UNLESS OTHERWISE NOTED <br />UR URINAL <br />UTIL UTILITY <br />UL UNDERWRITERS LABORATORIES <br />VAR VARIABLE <br />VIF VERIFY IN FIELD <br />VIN VINYL <br />VERT VERTICAL <br />VEST VESTIBULE <br />VCT VINYL COMPOSITION TILE <br />VWC VINYL WALL COVERING <br />W WEST <br />W WITH <br />WC WALL COVERING <br />WC WATER CLOSET <br />WD WOOD <br />WIN WINDOW <br />WO WHERE OCCURS <br />WO WITHOUT <br />WP WATERPROOF <br />WPT WORK POINT <br />WR WATER RESISTANT <br />WS WEATHERSTRIPING <br />WT WEIGHT <br />WNSCT WAINSCOT <br />WDT WIDTH <br />K KEY <br />KL KEY LOCK <br />KP KICK PLATE <br />KIT KITCHEN <br />LAM LAMINATE <br />LAV LAVATORY <br />LH LEFT HANDED <br />LAB LABORATORY <br />LT LIGHT <br />ABBREVIATIONS <br />1. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY HAZARDOUS AREA OR WHEN <br />SERVING AN OCCUPANT LOAD OF 50 OR MORE. <br />2. EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR <br />EFFORT. (2022 CBC 1010.2). <br />3. EXCEPTION: THIS REQUIREMENT SHALL NOT APPLY TO EXTERIOR EXIT DOORS IN A GROUP "B" OCCUPANCY IF THERE <br />IS A VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR STATING "THIS DOOR TO REMAIN UNLOCKED WHEN <br />SPACE IS OCCUPIED". THE LETTERS SHALL BE NOT LESS THAN 1 INCH HIGH ON A CONTRASTING BACKGROUND. THE <br />LOCKING DEVICE MUST BE A TYPE THAT WILL BE READILY DISTINGUISHABLE AS LOCKED. <br />4. PANIC HARDWARE, WHEN INSTALLED, SHALL COMPLY WITH ALL APPLICABLE BUILDING CODE REQUIREMENTS. THE <br />ACTIVATING MEMBER SHALL BE MOUNTED AT A HEIGHT OF NOT LESS THAN 34 INCHES NOR MORE THAN 44 INCHES <br />ABOVE THE FLOOR. THE UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS WHEN APPLIED IN THE DIRECTION OF <br />EXIT TRAVEL. <br />5. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE SHALL BE ILLUMINATED AT ALL TIMES THE BUILDING <br />SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE <br />LESS THAN 1 FOOT-CANDLE (11-LUX) AT THE WALKING SURFACE LEVEL. (2022 CBC 1008.1, 1008.2 AND 1008.2.1) <br />6. EXIT ILLUMINATION SHALL COMPLY WITH 2022 CBC SECTION 1008 AND 1013. <br />7. EXIT SIGNS SHALL BE INSTALLED AT REQUIRED EXIT DOORWAYS AND WHERE OTHERWISE NECESSARY TO CLEARLY <br />INDICATE THE DIRECTION OF EGRESS WHEN THE EXIT SERVES AN OCCUPANT LOAD OF 50 OR MORE. <br />8. EXCEPTION: MAIN EXTERIOR EXIT DOORS WHICH OBVIOUSLY AND CLEARLY ARE IDENTIFIABLE AS EXITS NEED NOT BE <br />SIGNED WHEN APPROVED BY THE BUILDING OFFICIAL. <br />9. WHEN NECESSARY, THE FINAL LOCATION AND QUANTITY OF EXIT SIGNS SHALL BE DETERMINED BY THE FIRE <br />DEPARTMENT PRIOR TO CONSTRUCTION OF ANY WORK. <br />10. THE COLOR AND DESIGN OF LETTERING, ARROWS AND OTHER SYMBOLS ON EXIT SIGN SHALL BE IN HIGH CONTRAST <br />WITH THEIR BACKGROUND (3/4" x 6" LETTERS MIN.) <br />11. ALL RATED CORRIDOR DOORS SHALL HAVE A THRESHOLD WITH A SMOKE AND DRAFT SEAL AT HEAD AND JAMBS. <br />12. INTERIOR WALL AND CEILING FINISHES SHALL BE NON-COMBUSTIBLE OR HAVE A FLAME SPREAD INDEX OF 0 TO 25; <br />SMOKE-DEVELOPED INDEX 0-450. <br />13. ALL DRAPES, HANGING CURTAINS AND OTHER DECORATIVE MATERIALS SHALL BE TREATED AND MAINTAINED IN A <br />FLAME RETARDANT CONDITION. <br />14. FIRE DAMPERS OR DOORS SHALL BE PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED WALLS OR CEILING AS <br />PER 2022 CBC SECTION 716. SMOKE DAMPERS SHALL BE PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED <br />WALLS OR CEILING AS PER 2022 CBC SECTION 716. <br />15. IF THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER SYSTEM OR HAS A FIRE/LIFE SAFETY SYSTEM, EXTEND/MODIFY <br />FIRE/LIFE SAFETY SYSTEM AS REQUIRED. <br />16. IF THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER SYSTEM OR HAS A FIRE/LIFE SAFETY SYSTEM, EXTEND FIRE <br />SPRINKLERS SYSTEMS AS REQUIRED. <br />17. IF THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER SYSTEM OR HAS A FIRE/LIFE SAFETY SYSTEM, FIRE <br />SPRINKLER/OR LIFE SAFETY PLANS MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL PRIOR TO <br />BUILDING PERMIT ISSUANCE. <br />18. IF THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER SYSTEM OR HAS A FIRE/LIFE SAFETY SYSTEM, FIRE SPRINKLER <br />SYSTEM PLAN MUST BE REVISED AND APPROVED BY THE CITIES FIRE DEPARTMENT PRIOR TO THE INSTALLATION OR <br />MODIFICATION OF SPRINKLER SYSTEMS. <br />19. A PORTABLE FIRE EXTINGUISHER WITH A MINIMUM 2A10BC RATING SHALL BE PROVIDED EVERY 75' OF TRAVEL <br />DISTANCE FROM ANY POINT WITHIN THE AREA DEFINED AS SCOPE OF WORK PER THESE PLANS. PROVIDE FIRE <br />EXTINGUISHERS AS REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR. <br />20. ALL EMERGENCY LIGHTING SOURCES SHALL EMIT A MINIMUM VALUE OF ONE FOOT CANDLE MEASURED AT FLOOR <br />LEVEL. <br />21. PROVIDE EMERGENCY NOTIFICATION SYSTEM FOR THE HEARING AND VISUAL IMPAIRED PER A.D.A. REQUIREMENTS. <br />XX <br />XX <br />1 <br />CLOSE <br />STOP <br />OPEN <br />B <br />L C 4 <br />2 <br />CONTROL PANEL <br />SEE BELOW <br />4' <br />- <br />0 <br />" <br /> <br />M <br />A <br />X <br />. <br />LC <br />2'- <br />1 <br />1 <br />" <br />MI <br />N <br />. <br /> <br />A <br />. <br />F <br />. <br />F <br />. <br /> <br />ELEVATOR SIGNAGE <br />IDENTIFICATION FOR THE VISUALLY IMPAIRED SHALL BE AS FOLLOWS PASSENGER ELEVATOR CONTROLS SHALL HAVE A MINIMUM <br />DIMENSION OF 3/4 INCHES AND SHALL BE RAISED 1/8 INCH PLUS OR MINUS 1/32 ABOVE THE SURROUNDING SURFACE. CONTROL <br />BUTTONS SHALL HAVE SQUARE SHOULDERS, AND SHALL BE ACTIVATED BY MECHANICAL MOTION WHICH IS DETECTABLE. ALL <br />CONTROL BUTTONS SHALL BE DESIGNATED BY A 5/8 INCH MINIMUM, ARABIC NUMERAL, STANDARD ALPHABET CHARACTER, OR <br />STANDARD SYMBOL IMMEDIATELY TO THE LEFT OF THE CONTROL BUTTON. A BRAILLE SYMBOL SHALL BE LOCATED IMMEDIATELY <br />BELOW THE NUMERAL, CHARACTER, OR STANDARD SYMBOL. A MINIMUM CLEARANCE OF 3/8 INCH OR OTHER SUITABLE MEANS <br />OF SEPARATION SHALL BE PROVIDED BETWEEN ROWS OF CONTROL BUTTONS. NOTE SEE FIGURE BELOW. THE RAISED <br />CHARACTERS SHALL BE WHITE ON BLACK BACKGROUND. CONTROLS AND EMERGENCY EQUIPMENT IDENTIFIED BY RAISED <br />SYMBOLS SHALL INCLUDE, BUT NOT BE LIMITED TO DOOR OPEN, DOOR CLOSED, ALARM BELL, EMERGENCY STOP, AND <br />TELEPHONES. <br />GENERAL NOTE: <br />PASSENGER ELEVATORS SHALL BE ACCESSIBLE. <br />ELEVATORS REQUIRED TO BE ACCESSIBLE SHALL BE <br />DESIGNATED AND CONSTRUCTED TO COMPLY WITH <br />CBC 2022 SECTION 11B-407 AND WITH ASME A17.1, <br />SAFETY CODE FOR ELEVATORS AND ESCALATORS. <br />HALL LANTERN <br />L C <br />LC <br />LC <br />FLOOR LANDING ON BOTH SIDES <br />CALL BUTTON <br />GRAB BAR <br />PASSENGER ELEVATOR LANDING JAMBS ON ALL ELEVATOR FLOORS, SHALL HAVE THE NUMBER OF THE FLOOR ON WHICH THE <br />JAMB IS LOCATED DESIGNATED BY RAISED ARABIC NUMERALS WHICH ARE A MINIMUM OF 2 INCHES IN HEIGHT AND RAISED <br />BRAILLE SYMBOLS TO BE LOCATED APPROXIMATELY 5 FEET ABOVE THE FLOOR ON THE JAMB PANELS ON BOTH SIDES OF THE <br />DOOR SO THAT THEY ARE VISIBLE FROM WITHIN THE ELEVATOR. RAISED BRAILLE SYMBOLS SHALL BE PLACED DIRECTLY TO THE <br />LEFT OF THE CORRESPONDING RAISED ARABIC NUMERALS. THE RAISED CHARACTERS SHALL BE ON A CONTRASTING BACKGROUND. <br />CENTER OPENING DOOR <br />ALARM <br />ELEVATOR CONTROL PANEL <br />S <br />3 <br />ELEVATOR EXTERIOR ELEVATION <br />ELEVATOR INTERIOR ELEVATION <br />GRAB BAR <br />SIDE OPENING DOOR <br />ELEVATOR TYPICAL MOUNTING HEIGHT ELEVATION <br />1 <br />1 2" <br />2" <br />PLACE STAR <br />ALONGSIDE <br />MAIN EXIST <br />FLOOR NUMBER <br />5 <br />8" MIN. CHARACTERS AND <br />SYMBOLS HEIGHT <br />4' <br /> <br />3 <br />" <br /> <br /> M <br />I <br />N <br />. <br />4' <br />6 <br />" <br /> <br />M <br />I <br />N <br />. <br />5"29 <br />" <br />B <br />A <br /> NOTE: THE AUTOMATIC DOOR REOPENING DEVICE <br />IS ACTIVATED IF AN OBJECT PASSES THROUGH <br />EITHER LINE A OR LINE B. LINE A AND LINE B <br />REPRESENT THE VERTICAL LOCATION OF THE DOOR <br />REOPENING DEVICE NOT REQUIRING CONTACT. <br />TYPICAL MOUNTING HEIGHT ELEVATION <br />PROJECT: <br />DATE: <br />DRAWN: <br />SCALE: <br />PROJECT NO: <br />REVIEWED: <br />SHEET NO: <br />SHEET TITLE: <br />STAMP AND SIGNATURE: <br />CONSULTANTS: <br />DATE DESCRIPTION DELTA <br />DRAWINGS ISSUE <br />06/21/2024 ISSUE FOR PLAN CHECK <br />6083 Bristol Parkway <br />Culver City, CA 90230 <br />515 South Flower St., Suite 1200 <br />Los Angeles, CA 90071 <br />18600 MacArthur Blvd., Suite 100 <br />Irvine, CA 92612 <br />485C US Route 1 South, Suite 105 <br />Iselin, NJ 08830 <br />www.saaia.com <br />T 310.553.3252 <br />T 213.929.1400 <br />T 949.724.8958 <br />San Francisco, CA 94105 <br />T 415.390.6793 <br />T 848.200.1200 <br />New York, NY 10017 <br />T 917.512.6688 <br />575 Market St., Suite 502 <br />711 3rd Ave., 6th Floor <br />OWNERSHIP AND USE OF DOCUMENTS ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF FURNISHED BY SAA INTERIORS ARE AND SHALL <br />REMAIN IT'S PROPERTY. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. FEDERAL LAW PROHIBITS THE REPRODUCTION, DISPLAY, SALE, <br />OR OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN CONSENT OF SHLEMMER ALGAZE ASSOCIATES. <br />COPYRIGHT © 2015 SHLEMMER ALGAZE ASSOCIATES ALL RIGHTS RESERVED <br />09/06/2024 <br />D.S. <br />K.L./M.P. <br />635330 <br />1700 E ST ANDREW <br />ACCESSIBLITY <br />UPGRADES <br />1700 E ST ANDREW PL <br />SANTA ANA, CA 92705 <br />C U L V E R C I T Y , C A • I R V I N E , C A • L O S A N G E L E S , C A <br />S A N F R A N C I S C O , C A • I S E L I N , N J • N E W Y O R K , N Y <br />IF DRAWINGS AND MATERIALS DEVELOPED AND PROVIDED BY SAA INTERIORS + ARCHITECTURE AT THE TIME OF AND RELATING TO COVID-19 CONTAIN <br />RECOMMENDATIONS FROM THE CENTER FOR DISEASE CONTROL AND PREVENTION (CDC) AND THE WORLD HEALTH ORGANIZATION (WHO), SUCH RECOMMENDATIONS <br />ARE ONLY VALID AS OF THE DATE THE DRAWINGS AND MATERIALS ARE PRODUCED. THE CDC AND/OR WHO MAY UPDATE OR MODIFY THEIR RECOMMENDATIONS AT <br />ANY TIME PER THEIR DISCRETION. IN USING RECOMMENDATIONS FROM THESE DRAWINGS AND MATERIALS, THE RECIPIENT ACKNOWLEDGES THAT IT WAS BASED ON <br />THEIR OWN DECISION AND TAKE FULL RESPONSIBILITY AND LIABILITY. THE INTENDED RECIPIENT INDEMNIFIES AND DEFENDS SAA FOR ANY USE OF THESE DRAWINGS <br />AND MATERIALS BY OTHERS. SAA'S SERVICES ARE INTENDED TO ONLY BE OF ASSISTANCE AND GUIDANCE FOR OUR CLIENT'S STRATEGIES AND DO NOT CONSTITUTE AS <br />REQUIREMENTS OR ANY FORM OF HEALTH, ILLNESS OR DISEASE ADVICE. SAA MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE ACCURACY OR <br />COMPLETENESS OF THE DRAWINGS AND MATERIALS. ANY RECOMMENDATIONS OR USE OF ANY CDC OR WHO INFORMATION DOES NOT CONSTITUTE ENDORSEMENT <br />BY THE U.S. GOVERNMENT, DEPARTMENT OF HEALTH AND HUMAN SERVICES OR THE CDC AND WHO NOR ITS AFFILIATES. <br />08/20/2024 ISSUE FOR PLAN CHECK - OCFA <br />09/06/2024 PLAN CHECK COMMENTS 01 1 <br />DOOR HANDLE <br />WALL MOUNTED F.L.S. <br />STROBE DEVICE. <br />CASEWORK MOUNTING HEIGHTS <br />CERTAIN ELEVATION DIMENSIONS ARE <br />ASSOCIATED WITH CODE REQUIRED MAXIMUM <br />OR MINIMUM MOUNTING HEIGHTS. SUCH <br />DIMENSIONS SHOULD BE HELD DESPITE <br />VARIATIONS IN THE SLAB. CODE DIMENSIONS <br />ARE IN PARENTHESIS WITH AN ASTERISK NEXT <br />TO THE CRITICAL DIMENSION. E.G.: (* +15" MIN.) <br />CONTROL ELEVATIONS ARE COMPRISED OF: <br />FINISH CEILING LEVEL (FCL) <br />FINISH FLOOR LEVEL (FFL) <br />TOP OF SLAB (TOS) <br />ALL DIMENSIONS GIVEN ARE FROM FFL DATUM. <br />FINISH FLOOR MATERIAL IS ASSUMED TO BE 3/8" <br />THICK GLUE DOWN CARPET. FLOOR FINISH AND <br />THICKNESS WILL VARY FROM LOCATION TO <br />LOCATION. REFER TO PLANS AND DETAILS FOR <br />SPECIFIC FLOORING INFORMATION. <br />NO ALLOWANCE HAS BEEN MADE FOR ANY <br />DEPRESSIONS OR ELEVATIONS IN THE SLAB. <br />ELEVATION HEIGHTS SHOULD TAKE INTO <br />ACCOUNT ANY VARIATIONS IN THE FLOOR SLAB. <br />ELECTRICAL MOUNTING HEIGHTS <br />CONTROL ELEVATIONS <br />KEY CARD READER OR THERMOSTAT <br />CLG. HT. <br />+60" <br />BOT. OF CASEWORK OVHDS. <br />(* +2'-10" MAX.) <br />COUNTER +2'-10" <br />+2'-6" <br />CASEWORK DESK <br />J BOX AT DESK +21" <br />TYP. J-BOX OUTLET +18"* <br />COAT CLOSET SHELF +48" <br />+34"-44" <br />DOOR HANDLE <br />FIN. FLR. 0'- 0" <br />FIRE EXTINGUISHER CABINET, SEE A2.0 <br />FOR TYPE. PAINT CABINET TO MATCH <br />ADJACENT WALL. PROVIDE NEW FIRE <br />EXTINGUISHER SUSPENDED IN CABINET <br />CL <br />CL <br />ADJUST CENTERLINE DIMENSION TO 12" AS <br />REQUIRED TO ACCOMMODATE MULTIPLE <br />GANGED DEVICES <br />WALL SWITCH, DIMMER OR WALL MOUNTED <br />MOTION SENSOR, WALL PHONES AND "J" <br />BOXES AT COUNTERS. MULTIPLE SWITCHES TO <br />BE GANGED INTO ONE COVER PLATE. <br />ELECT. WALL OUTLET. MULTIPLE OUTLETS TO <br />BE GANGED INTO ONE COVER PLATE. <br />CL DIMENSION SHOWN FOR REFERENCE ONLY. <br />FINAL LOCATION TO BE APPROVED BY SAA <br />AND/OR TENANT. <br />NOTES: <br />1. ALL VERTICAL DIMENSIONS ARE SHOWN <br />FROM FINISH FLOOR TO LOCATION SHOWN. <br />2. THE THERMOSTAT AND CARD READERS <br />SHALL BE LOCATED SO THAT THE TOP OF <br />THE OUTLET BOX IS NO MORE THAN 48" <br />NOR LESS THAN 15" TO THE BOTTOM OF <br />THE OUTLET BOX ABOVE THE FINISHED <br />FLOOR (2022 CBC 11B-308.2.1). <br />3'-0" <br />MIN. <br />6'-8" MIN. <br />42" MIN. <br />4' <br />- <br />6 <br />" <br /> <br />M <br />I <br />N <br />. <br />4' <br />- <br />3 <br />" <br /> <br />M <br />I <br />N <br />. <br />42" MIN. <br />3/4" <br />3/ <br />8 <br />" <br /> <br />MI <br />N <br />. <br /> <br />SE <br />P <br />A <br />R <br />A <br />T <br />I <br />O <br />N <br /> <br />RAIL4' <br />- <br />0 <br />" <br />EM <br />E <br />R <br />G <br />. <br /> <br />T <br />E <br />L <br />. <br />32 <br />" <br />6' <br />- <br />0 <br />" <br /> <br />T <br />O <br /> <br />6 <br />' <br />- <br />6 <br />" <br />PH <br />O <br />T <br />O <br />E <br />L <br />E <br />C <br />T <br />R <br />I <br />C <br /> <br />T <br />U <br />B <br />E <br />BY <br />P <br />A <br />S <br />S <br /> <br />S <br />W <br />I <br />T <br />C <br />H <br />1 1/2"MIN. <br />3'- <br />6 <br />" <br />6' <br />- <br />0 <br />" <br /> <br />M <br />I <br />N <br />. <br />5' <br />- <br />0 <br />" <br />1'- <br />6 <br />" <br />44 <br />" <br /> <br />A <br />. <br />F <br />. <br />F <br />. <br /> <br />M <br />A <br />X <br /> <br />T <br />O <br /> <br />T <br />O <br />P <br /> <br />O <br />F <br /> <br />B <br />O <br />X <br />+8 <br />0 <br />" <br />- <br />9 <br />6 <br />" <br /> <br />A <br />. <br />F <br />. <br />F <br />. <br /> <br />6" <br />MI <br />N <br />. <br /> <br />C <br />L <br />R <br />. <br />6" <br />12" <br />CONTACT DIRECTORY <br />CLIENT: <br />MICHAEL EMBREE <br />DRAWBRIDGE SAINT ANDREW, LLC <br />3 EMBARCADERO CTR., SUITE 2310 <br />SAN FRANCISCO, CA 94111 <br />PHONE: 415-391-4440 <br />CIVIL ENGINEER: <br />VCA ENGINEERS, INC. <br />2151 MICHELSON DRIVE, #240 <br />IRVINE, CA 92612 <br />PHONE: 949-679-0870 <br />CONTACT: ROGER ZELAYA <br />EMAIL: ROGER.ZELAYA@VCAENG.COM <br />1700 E ST ANDREW PL <br />SANTA ANA, CA 92705 <br />N SITE LOCATION <br />SCOPE OF WORK <br />SCOPE OF <br />WORK SCOPE OF WORK <br />SCOPE OF WORK <br />SCOPE OF WORK <br />SCOPE OF WORK <br />ARCHITECT: <br />SAA INTERIORS AND ARCHITECTURE <br />18600 MACARTHUR BLVD., SUITE 100 <br />IRVINE, CA 92612 <br />PHONE: 949-724-8958 <br />FAX: 949-724-1981 <br />CONTACT: MICHAEL PARR <br />EMAIL: MPARR@SAAIA.COM <br />CONSTRUCTION MANAGER: <br />BRIAN PROCK <br />TRESTLE COMPANIES <br />2151 MICHELSON DR. <br />IRVINE, CA 92612 <br />EMAIL: BRIAN.PROCK@TRESTLECOMPANIES.COM <br />GENERAL CONTRACTOR: <br />GREG GUBA <br />ESPLANADE BUILDERS <br />3002 DOW AVE., SUITE 102 <br />TUSTIN, CA 92780 <br />PHONE: 949-556-4930, EXT. 913 <br />EMAIL: GREG@ESPLANADEBUILDERS.COM <br />PLUMBING ENGINEER: <br />VISION CONSULTING SERVICES <br />30501 AGOURA RD., SUITE 150 <br />AGOURA HILLS, CA 91301 <br />CONTACT: BRANDON PULLEN <br />PHONE: 805-584-9719 <br />EMAIL: BRANDONP@VISIONMEP.COM <br />ELECTRICAL ENGINEER: <br />VISION CONSULTING SERVICES <br />30501 AGOURA RD., SUITE 150 <br />AGOURA HILLS, CA 91301 <br />CONTACT: BRANDON PULLEN <br />PHONE: 805-584-9719 <br />EMAIL: BRANDONP@VISIONMEP.COM <br />STRUCTURAL ENGINEER FOR RECORD: <br />RICHARD A. DAOUD, SE <br />PRINCIPAL <br />MELQART, INC. <br />714 W OLYMPIC BLVD., SUITE 617 <br />LOS ANGELES, CA 90015 <br />OFFICE: 213-590-6119 <br />CELL: 909-374-4339 <br />EMAIL: RICHARD.DAOUD@MELQARTINC.COM <br />PARKING SUMMARY <br />BUILDING OCCUPANCY: <br />B (OFFICE, BUSINESS USE) <br />BUILDING AREA <br />FIRST FLOOR = 74,172 SQ. FT. <br />SECOND FLOOR = 56,414 SQ. FT. <br />THIRD FLOOR = 39,466 SQ. FT. <br />TOTAL BUILDING AREA AREA = 170,052 SQ. FT. <br />REQUIRED PARKING <br />PER CITY OF SANTA ANA OFF-STREET PARKING REQUIREMENTS SEC. 41-1342, PARKING REQUIRED FOR OFFICE/BUSINESS <br />USE: <br />THREE (3) SPACES FOR EACH ONE THOUSAND (1,000) SQUARE FEET OF GROSS FLOOR AREA <br />REQUIRED PARKING = 172,652 SQ. FT. @ 3 STALLS/1,000 SQ. FT.= 511 STALLS REQUIRED <br />PROVIDED PARKING <br />TOTAL PARKING PROVIDED = 638 TOTAL STALLS PROVIDED <br />SURPLUS STALLS = 127 SURPLUS STALLS <br />ACCESSIBLE STALLS REQUIRED <br /> 2% OF TOTAL PROVIDED PARKING (PER CBC TABLE 11B-208.2)= 13 ACCESSIBLE STALLS REQUIRED <br />ACCESSIBLE STALLS PROVIDED = 14 ACCESSIBLE STALLS PROVIDED <br /> 8 STANDARD STALLS <br /> 6 VAN STALLS <br />SEE SHEET A-0.4 FOR ADDITIONAL PARKING INFORMATION AND FOR OVERALL SITE PLAN <br />1 <br />1 <br />1 NELSON <br />ALGAZE <br />No. C-21090 <br />REN. 03/31/2025 <br />L,CENSE ARC ,EC <br />S <br />AE O CAL,ORN,A <br />Bldg# 101120027-28 <br />Plmg# 30147489 <br /> <br />APPROVALS: <br />PLNG - FArias <br />BLDG - CSG Consultants <br />PLMG - CSG Consultants <br />1700 E St Andrew Pl - <br />ADA Upgrades12/2/2024