My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1700 E St Andrew - Plan
PBA
>
Building
>
ProjectDox
>
S
>
St Andrew Pl
>
1700 E St Andrew Pl
>
1700 E St Andrew - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:19:16 PM
Creation date
6/6/2025 1:18:35 PM
Metadata
Fields
Template:
Plan
Permit Number
30147489
101120027
101120028
Full Address
1700 E St Andrew Pl
Text box
ID:
1
Creator:
Import Agent
Created:
6/6/2025 1:18 PM
Modified:
6/6/2025 8:49 AM
Text:
www.hilti.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
www.hilti.com <br />Hilti PROFIS Engineering 3.0.95 <br />Input data and results must be checked for conformity with the existing conditions and for plausibility! <br />PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan <br />3 <br />Company: <br />Address: <br />Phone I Fax: <br />Design: <br />Fastening point: <br /> | <br />Masonry - Jun 19, 2024 <br />Page: <br />Specifier: <br />E-Mail: <br />Date: <br />3 <br />6/19/2024 <br />2 Load case/Resulting anchor forces <br />Load case: Service loads <br />Anchor reactions [lb] <br />Tension force: (+Tension, -Compression) <br />Anchor Tension force Shear force Shear force x Shear force y <br />1 0 90 90 0 <br />2 477 90 90 0 <br />max. compressive strain: 0.02 [‰] <br />max. compressive stress: 28 [psi] <br />resulting tension force in (x/y)=(0.000/4.000): 477 [lb] <br />resulting compression force in (x/y)=(0.000/-5.063): 477 [lb] <br /> Anchor forces are calculated based on the assumption of a rigid anchor plate. <br />P1.20 <br />1700 E St Andrew Pl - <br />ADA Upgrades12/2/2024
The URL can be used to link to this page
Your browser does not support the video tag.