GENERAL NOTES FOR STRUCTURAL OBSERVATION: <br />1.STRUCTURAL OBSERVATION IS REQUIRED FOR THE STRUCTURAL SYSTEM IN <br />ACCORDANCE WITH THE INFORMATION BULLETIN NO. IB/P/BC 2017-024. STRUCTURAL <br />OBSERVATION IS THE VISUAL OBSERVATION AT THE CONSTRUCTION SITE OF THE <br />ELEMENTS AND CONNECTIONS OF THE STRUCTURAL SYSTEM AT SIGNIFICANT <br />CONSTRUCTION STAGES AND THE COMPLETE STRUCTURE FOR GENERAL <br />CONFORMANCE TO THE APPROVED PLANS AND SPECIFICATIONS. STRUCTURAL <br />OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE INSPECTIONS REQUIRED <br />OF THE BUILDING INSPECTOR OR THE DEPUTY INSPECTOR. <br />2.THE OWNER SHALL EMPLOY A STATE OF CALIFORNIA REGISTERED CIVIL OR <br />STRUCTURAL ENGINEER OR LICENSED ARCHITECT TO PERFORM THE STRUCTURAL <br />OBSERVATION. THE DEPARTMENT OF BUILDING AND SAFETY RECOMMENDS THE USE OF <br />THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN WHO ARE <br />INDEPENDENT OF THE CONTRACTOR. <br />3.THE STRUCTURAL OBSERVER SHALL PROVIDE EVIDENCE OF EMPLOYMENT BY THE <br />OWNER OR THE OWNER'S REPRESENTATIVE. A LETTER FROM THE OWNER, THE <br />OWNER'S REPRESENTATIVE, OR A COPY OF THE AGREEMENT FOR SERVICES SHALL BE <br />SENT TO THE BUILDING INSPECTOR BEFORE THE FIRST SITE VISIT. <br />4.THE OWNER OR OWNER'S REPRESENTATIVE SHALL COORDINATE AND CALL FOR A <br />MEETING BETWEEN THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE <br />STRUCTURAL DESIGN, STRUCTURAL OBSERVER, CONTRACTOR, AFFECTED <br />SUBCONTRACTORS AND DEPUTY INSPECTORS. THE PURPOSE OF THE MEETING SHALL <br />BE TO IDENTIFY THE MAJOR STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT <br />THE VERTICAL AND LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW <br />SCHEDULING OF THE REQUIRED OBSERVATIONS. A RECORD OF THE MEETING SHALL BE <br />INCLUDED IN THE FIRST OBSERVATION REPORT SUBMITTED TO THE BUILDING <br />INSPECTOR. <br />5.THE STRUCTURAL OBSERVER SHALL PERFORM SITE VISITS AT THOSE STEPS IN THE <br />PROGRESS OF THE WORK THAT ALLOW FOR CORRECTION OF DEFICIENCIES WITHOUT <br />SUBSTANTIAL EFFORT OR UNCOVERING OF THE WORK INVOLVED. AT A MINIMUM, THE <br />LISTED SIGNIFICANT CONSTRUCTION STAGES ON THE FOLLOWING STRUCTURAL <br />OBSERVATION/SIGNIFICANT CONSTRUCTION STAGES TABLE REQUIRE A SITE VISIT AND <br />AN OBSERVATION REPORT FROM THE STRUCTURAL OBSERVER. <br />6.THE STRUCTURAL OBSERVER SHALL PREPARE A REPORT OF THE STRUCTURAL <br />OBSERVATION REPORT FORM IN/FORM.08 (PART 1) FOR EACH SIGNIFICANT STAGE OF <br />CONSTRUCTION OBSERVED. THE ORIGINAL OF THE STRUCTURAL OBSERVATION <br />REPORT SHALL BE SENT TO THE BUILDING INSPECTOR'S OFFICE AND SHALL BE SIGNED <br />AND SEALED (WET STAMP) BY THE RESPONSIBLE STRUCTURAL OBSERVER. ONE COPY <br />OF THE OBSERVATION REPORT SHALL BE ATTACHED TO THE APPROVED PLANS. THE <br />COPY ATTACHED TO THE PLANS SHALL BE SIGNED AND SEALED (WET STAMP) BY THE <br />RESPONSIBLE STRUCTURAL OBSERVER OR THEIR DESIGNEE. COPIES OF THE REPORT <br />SHALL ALSO BE GIVEN TO THE OWNER, CONTRACTOR, AND DEPUTY INSPECTOR. ANY <br />DEFICIENCY NOTED ON THE OBSERVATION REPORT WILL BECOME THE RESPONSIBILITY <br />OF THE STRUCTURAL ENGINEER OF RECORD TO VERIFY ITS COMPLETION BY HIM (HER), <br />OR BY A REGISTERED DEPUTY INSPECTOR AT THE DISCRETION OF THE STRUCTURAL <br />OBSERVER. <br />7.A FINAL OBSERVATION REPORT AND THAT OF THE REGISTERED DEPUTY INSPECTOR <br />MUST BE SUBMITTED WHICH SHOWS THAT ALL OBSERVED DEFICIENCIES WERE <br />RESOLVED AND STRUCTURAL SYSTEM GENERALLY CONFORMS WITH THE APPROVED <br />PLANS AND SPECIFICATIONS. THE DEPARTMENT OF BUILDING AND SAFETY WILL NOT <br />ACCEPT THE STRUCTURAL WORK WITHOUT THIS FINAL OBSERVATION REPORT AND <br />THAT OF THE REGISTERED DEPUTY INSPECTOR (WHEN PROVIDED) AND THE <br />CORRECTION OF SPECIFIC DEFICIENCIES NOTED DURING NORMAL BUILDING <br />INSPECTION. <br />8.THE STRUCTURAL OBSERVER SHALL PROVIDE THE ORIGINAL STAMPED AND SIGNED <br />STRUCTURAL THE COUNTY OF LOS ANGELES OBSERVATION REPORT TO INSPECTOR. <br />9.WHEN THE OWNER ELECTS TO CHANGE THE STRUCTURAL OBSERVER OF RECORD, THE <br />OWNER SHALL: <br />A) NOTIFY THE BUILDING INSPECTOR IN WRITING BEFORE THE NEXT INSPECTION BY <br />SUBMITTING COMPLETED "STRUCTURAL OBSERVATION PROGRAM AND DESIGNATION OF <br />THE STRUCTURAL OBSERVER" FORM IN/FORM.08 (PART 2) <br />B) CALL AN ADDITIONAL PRECONSTRUCTION MEETING. <br />C) FURNISH THE REPLACEMENT STRUCTURAL OBSERVER WITH A COPY OF ALL <br />PREVIOUS OBSERVATION REPORTS. THE REPLACEMENT STRUCTURAL OBSERVER <br />SHALL APPROVE THE CORRECTION OF THE ORIGINAL OBSERVED DEFICIENCIES UNLESS <br />OTHERWISE APPROVED BY PLAN CHECK SUPERVISION. THE POLICY OF THE <br />DEPARTMENT SHALL BE TO CORRECT ANY PROPERTY NOTED DEFICIENCIES WITHOUT <br />CONSIDERATION OF THEIR SOURCE. <br />10. THE ENGINEER OR ARCHITECT OF RECORD SHALL DEVELOP ALL CHANGES RELATING TO <br />THE STRUCTURAL SYSTEMS. THE BUILDING DEPARTMENT SHALL REVIEW AND APPROVE <br />ALL CHANGES T6 THE APPROVED PLANS AND SPECIFICATIONS. <br />SHEET <br />NUMBER <br />CONSULTANT <br />The above drawings, specifications, ideas, and <br />arrangements represented thereby are and shall remain <br />property of GxG CO-op Design and no part thereof shall <br />be copied, disclosed to others or used in connection <br />with any other project other than the specific project for <br />which they have been prepared and developed, without <br />the written consent of GxG CO-op Design. Visual <br />contact with these drawings or specifications shall <br />constitute conclusive evidence of acceptance of these <br />restrictions. Written dimensions on these drawings shall <br />have precedence over scaled dimensions. Contractors <br />shall verify and be responsible for all dimensions and <br />conditions on the job, and this office must be notified of <br />any variations from the dimensions and conditions <br />shown by these drawings. Shop details must be <br />submitted to this office for approval before proceding <br />with fabrication.2021 <br />DATE <br />SCALE <br />DRAWN <br />JOB no. <br />REVISIONS <br />INDICATED <br />FEB. 29, 2024 <br />13637 RUTHER AVE. UNIT R <br />SOUTH GATE, CA 90280 <br />TELEPHONE: 310 749.7536 <br />E-MAIL: LOOKING4GIO@GMAIL.COM <br />GIOVANNI QUINTERO <br />1401 S. Lowell Street, <br />Santa Ana, CA 92707 <br />NEW PATIO <br />COVER <br />GENERAL NOTES AND SPECIFICATIONS <br />WOOD <br />1- WOOD FRAMING GENERAL <br />PROVIDE DOUBLE JOISTS UNDER AND PARALLEL TO ALL BEARINGS PARTITIONS. <br />ALL BOLT HOLES SHALL DE DRILLED 1/32" TO 1/16" OVERSIZED. <br />2x12 JOISTS SHALL BE BLOCKED AT THE SUPPORTS AND AT 8 FEET o.c. (AND RAFTERS <br />GREATER THAN 10" DEPTHS AT THE SUPPORTS AND AT 10 FEET O.C.) WITH SOLID 2x <br />BLOCKING 2" SHALLOWER THAN JOISTS OR APPROVED METAL CROSS BRIDGING. <br />WOOD FRAMING MEMBERS: DOUGLAS FIR-LARCH N°2 UNLESS OTHERWISE MARKED ON <br />THE PLANS. <br />RAFTER TIES SPACED AT 4 FEET (MAX.) ON CENTER ARE REQUIRED IMMEDIATELY ABOVE <br />CEILING JOISTS WHICH ARE NOT PARALLEL TO THE RAFTERS. <br />NAILING SCHEDULE <br />CONNECTION FASTENING LOCATION <br />JOIST TO SILL OR GIRDER 3-8d TOENAIL <br />BRIDGING TO JOIST 2-10d TOENAIL EACH END <br />1"x6" SUBFLOOR OR LESS TO EA. JOIST 2-8d FACE NAIL <br />WIDER THAN 1"x8" SHEATHINGS TO EACH <br />BEARING 3-8d FACE NAIL <br />2" SUBFLOOR TO JOIST OR GIRDER 2-16d BLIND AND FACE NAIL <br />SOLE PLATE TO JOIST OR BLOCKING 16d @16" O.C.TYP. FACE NAIL <br />SOLE PLATE TO JOIST OR BLOCKING 2-16d @16" O.C.BRACED WALL PANELS <br />TOP PLATE TO STUD 2-16d END NAIL <br />STUD TO SOLE PLATE 4-8d TOE NAIL <br />2-16d END NAIL <br />DOUBLE STUDS 16d @24" O.C.FACE NAIL <br />DOUBLE TOP PLATES 16d @16" O.C.TYP. FACE NAIL <br />DOUBLE TOP PLATES 8-16d LAP SPLICE <br />BLOCKING BETWEEN JOISTS OR RAFTERS TO <br />TOP PLATE 3-8d TOE NAIL <br />RIM JOIST TO TOP PLATE 8d @6" O.C.TOE NAIL <br />TOP PLATES, LAPS AND INTERSECTIONS 2-16d FACE NAIL <br />CONTINUOUS HEADER, TWO PIECES 16d @16" O.C.EACH EDGE <br />CEILING JOISTS TO PLATE 3-8d TOE NAIL <br />CONTINUOUS HEADER TO STUD 4-8d TOE NAIL <br />CEILING JOISTS, LAPS OVER PARTITIONS 3-16d FACE NAIL <br />CEILING JOISTS TO PARALLEL RAFTERS 3-16d FACE NAIL <br />RAFTER TO PLATE 3-10d TOE NAIL <br />1"x BRACE TO EACH STUD AND PLATE 2-8d FACE NAIL <br />1"x6" SHEATHING OR LESS TO EACH BEARING 2-8d FACE NAIL <br />WIDER THAN 1"x8" SHEATHINGS TO EACH <br />BEARING 3-8d FACE NAIL <br />BUILT IT-UP CORNER STUDS 16d @24" O.C. <br />BUILT-UP GIRDER & BEAMS <br />20d @32" O.C.FACE NAIL TOP & BOTTOM <br />STAGGERED <br />2-20d ENDS <br />2"x PLANKS 2-16d EACH BEARING <br />WOOD SHEAR AND DIAPHRAGMS <br />COMMON NAILS SHALL BE USED FOR ALL DIAPHRAGMS AND SHEAR WALL NAILING. <br />ROOF SHEATHING: 1/2" 5/8" THICK PLYWOOD CDX WITH INDEX 32/16. 8d 10d NAILS @ 6" <br />o.c. AT PANELS EDGES, AND 8d NAILS @ 12" o.c. AT PANEL FIELD. ALLOW 1/8" SPACING <br />AT PANEL EDGES, UNLESS OTHERWISE RECOMMENDED BY THE PANEL <br />MANUFACTURER. <br />PLYWOOD DIAPHRAGMS: PRODUCT STANDARD PS 1-19, DOUGLAS FIR-LARCH. <br />WATERPROOFING: STUCCO OVER PLYWOOD SHEAR WALL WILL BE WATERPROOFED <br />WITH A MINIMUM OF TWO 15# (GRADE D) UNDERLAYMENTS. <br />ROOF DIAPHRAGM NAILING TO BE INSPECTED BEFORE COVERING. FACE GRAIN OF <br />PLYWOOD SHALL BE PERPENDICULAR TO SUPPORTS. FLOOR SHALL HAVE TONGUE AND <br />GROOVE OR BLOCKED PANELS EDGES. PLYWOOD SPANS SHALL CONFORM WITH TABLE <br />2304.8.(1) ON IBC 2021. <br />WOOD CONSTRUCTION <br />1.STRUCTURAL LUMBER SHALL BE GRADE-MARKED DOUGLAS FIR-LARCH: <br />RAFTER 2 TO 4 WIDE UP TO 6 DEEP Nº2 <br />2 TO 4 WIDE, 8 OR LARGER Nº2 <br />JOISTS 2 TO 4 WIDE, 6 AND DEEPER Nº2 <br />BEAMS, PURLINS OVER 4 WIDE Nº1 <br />SUB-PURLINS 2 TO 4 WIDE, 4 DEEP Nº1 <br />LEDGERS Nº2 <br />STUDS 2x4 OR 3x4 Nº2 <br />STUDS 2x6 Nº2 <br />POSTS Nº2 <br />SILLS, PLATES AND BLOCKINGS Nº2 <br />2.SILLS OR PLATES BEARING ON CONCRETE OR MASONRY WHICH IS WITHIN 48" OF <br />EARTH SHALL BE PRESSURE TREATED, OR EQUAL, WOOD SILL PLATES SHALL BE <br />BOLTED TO THE FOUNDATION WITH 5/8" DIAMETER x 10" BOLTS 4'-0" o.c. 12" MIN. FROM <br />ENDS, OR 2 BOLTS MIN. PER PIECE. WHERE DIFFERENT SIZES AND/OR SPACING ARE <br />REQUIRED, THEY SHALL GOVERN. INSTALL WITH 3"x3"x1/4" (OR 2"x2"x3/16") PLATE <br />WASHER AT EACH ANCHOR BOLT. <br />3.PARALLAM/GLUE LAM BEAMS MUST BE FABRICATED IN A LADBS LICENSED SHOP. <br />4.JOISTS SHALL BE BLOCKED AT SUPPORTS AND BRIDGED OR BLOCKED AT INTERVALS <br />OF 8 FT WHERE JOISTS ARE 2x12 OR DEEPER. <br />5.JOISTS UNDER NON-BEARING PARTITIONS SHALL BE DOUBLED, EXCEPT AS NOTED. <br />6.LAGBOLTS (& SCREWS) SHALL BE PRE-DRILLED TO SHANK DIAMETER AND FULL DEPTH <br />AND SCREWED (NOT DRIVEN) INTO PLACE. <br />7.CUT WASHERS SHALL BE PLACED UNDER HEADS AND NUTS OF ALL BOLTS AND UNDER <br />HEADS OF LAGBOLTS. ONE CUT WASHER SHALL BE USED FOR BOLTS CONNECTING <br />WOOD LEDGERS TO CONCRETE OR MASONRY WALLS. <br />8.ALL HARDWARE USED FOR WOOD CONNECTION SHALL BE SIMPSON STRONG-TIE <br />PRODUCTS. INSTALL PER MANUFACTURERS RECOMMENDATIONS. ALTERNATE <br />PRODUCTS WILL ONLY BE PERMITTED IF WRITTEN APPROVAL AND ACCEPTANCE IS <br />OBTAINED BY ENGINEER. <br />9.ALL LUMBER SHALL HAVE A MOISTURE CONTENT NOT TO EXCEED 19% AT THE TIME OF <br />FABRICATION OR CONSTRUCTION. <br />10.PROVIDE LEAD HOLE 40%-70% OF THREADED SHANK DIA. AND FULL DIA. FOR SMOOTH <br />SHANK PORTION. <br />11.PLACE 2" FIREBLOCKING IN STUD WALLS AT CEILING AND FLOOR LEVELS, AT EACH 10" <br />HEIGHT OF STUDS, AND BETWEEN STAIR STRINGERS AT SUPPORTS. <br />12.ALL DIAPHRAGMS AND SHEAR NAILING SHALL UTILIZE COMMON NAILS OR GALVANIZED <br />BOX. <br />13.ALL PARALLEL STRAND LUMBER (PSL)SHALL BE 2.0E, 2900Fb BYTRUS JOIST MACMILLAN. <br />PARAMETERS DESIGN, CBC 2022, LABC 2023 <br />WIND DESIGN <br />1.BASIC WIND SPEED (3-SECOND GUST), MILES PER HOUR = 96 <br />2.WIND IMPORTANCE FACTOR, I=1.0 AND OCCUPANCY CATEGORY = II <br />3.WIND EXPOSURE CATEGORY: B (CASE 1) <br />4.THE APPLICABLE INTERNAL PRESSURE COEFFICIENT =0.18 <br />SEISMIC DESIGN <br />1.SEISMIC IMPORTANCE FACTOR, I=1.0 , AND OCCUPANCY CATEGORY = II <br />2.MAPPED SPECTRAL RESPONSE ACCELERATIONS, Ss=128.90%g AND S1=46.10%g <br />3.SITE CLASS = D <br />4.SPECTRAL RESPONSE COEFFICIENTS, SDS=1.031g AND SD1=0.400g <br />5.SEISMIC DESIGN CATEGORY=D <br />6.BASIC SEISMIC-FORCE-RESISTING SYSTEM(S)= WOOD POST SYSTEM <br />7.DESIGN BASE SHEAR = 5153 LBS <br />8.TOTAL BUILDING WEIGHT = 8238 LBS <br />9.SEISMIC RESPONSE COEFFICIENT(S), Cs=0.69 <br />10.RESPONSE MODIFICATION FACTOR(s), R =1.5 <br />11.ANALYSIS PROCEDURE USED = EQUIVALENT LATERAL FORCE PROCEDURE <br />12.REDUNDANCY FACTOR USED = 1.3 <br />BASIS OF DESIGN <br />ROOF DEAD LOAD = 9.00 PSF <br />CEILING DEAD LOAD = 7.00 PSF <br />ROOF LIVE LOAD = 20.00 PSF <br />CEILING LIVE LOAD = 10.00 PSF <br />CONCRETE & REINFORCING STEEL NOTES <br />CONCRETE FOUNDATION, FLOOR SLABS. <br />ALL CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUM STRENGTHS AT 28 DAYS: <br />FOOTINGS AND SLAB-ON-GRADE = 2500 PSI. <br />BAR SPLICES IN CONCRETE SHALL BE LAP 40 BAR DIAMETERS MINIMUM, AND MAY BE <br />WIRED TOGETHER, UNLESS OTHERWISE NOTED ON PLANS. <br />REINFORCING STEEL <br />REINFORCING BARS SHALL CONFORM TO THE FOLLOWING ASTM RATING AND GRADE <br />TYPE FOR BAR SIZES LISTED: <br />#4 AND SMALLER ASTM A 615 GRADE 40 (MIN) <br />#5 AND LARGER ASTM A 615 GRADE 60 <br />ADDITIONAL NOTES <br />1)CONTRACTORS RESPONSIBLE FOR THE CONSTRUCTION OF A WIND OR SEISMIC FORCE <br />RESISTING SYSTEM/COMPONENT LISTED IN THE "STATEMENT OF SPECIAL INSPECTION" <br />SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE LADBS INSPECTORS <br />AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON SUCH SYSTEM OR <br />COMPONENT PER SEC. 1709.1. <br />2)CONTINUOUS SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED <br />FOR FIELD WELDING, CONCRETE STRENGTH f'c>2500 PSI, HIGH STRENGTH BOLTING, <br />SPRAYED-ON FIREPROOFING, ENGINEERED MASONRY, HIGH-LIFT GROUTING, <br />PRE-STRESSED CONCRETE, HIGH LOAD DIAPHRAGMS AND SPECIAL MOMENT-RESISTING <br />CONCRETE FRAMES. <br />3)IF ADVERSE SOIL CONDITIONS ARE ENCOUNTERED, A SOILS INVESTIGATION REPORT MAY <br />BE REQUIRED. <br />4)PERIODIC SPECIAL INSPECTION IS REQUIRED FOR WOOD SHEAR WALLS, SHEAR PANELS, <br />AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING, AND OTHER FASTENING <br />COMPONENTS OF THE SEISMIC FORCE RESISTING SYSTEM. SPECIAL INSPECTION BY A <br />DEPUTY INSPECTOR IS REQUIRED WHERE THE FASTENER SPACING OF THE SHEATHING IS <br />4 INCHES ON CENTER OR LESS. <br />5)FOUNDATION SILLS SHALL BE NATURALLY DURABLE OR PRESERVATIVE-TREATED WOOD. <br />6)BEAMS MUST BE FABRICATED IN A LADBS LICENSED SHOP. IDENTIFY GRADE SYMBOL AND <br />LAMINATION SPECIES PER T 5-A, 2005 NDS SUPP. <br />7)PROVIDE LEAD HOLE 40%-70% OF THREADED SHANK DIA. AND FULL DIA. FOR SMOOTH <br />SHANK PORTION. <br />8)A COPY OF THE LOS ANGELES RESEARCH REPORT AND/OR CONDITIONS OF LISTING <br />SHALL BE MADE AVAILABLE AT THE JOB SITE. <br />9)ROOF DIAPHRAGM NAILING TO BE INSPECTED BEFORE COVERING. FACE GRAIN OF <br />PLYWOOD SHALL BE PERPENDICULAR TO SUPPORTS. FLOOR SHALL HAVE TONGUE AND <br />GROOVE OR BLOCKED PANEL EDGES. PLYWOOD SPANS SHALL CONFORM WITH TABLE <br />2304.8.(1) ON IBC 2021. <br />10)ALL DIAPHRAGM AND SHEAR WALL NAILING SHALL UTILIZE COMMON NAILS OR <br />GALVANIZED BOX. <br />11)ALL BOLT HOLES SHALL BE DRILLED 132" TO 116" OVERSIZED. <br />NEW PATIO COVER <br />PROJECT ADDRESS: <br />Description of Work: <br />Owner:Architect:Engineer: <br />PERMIT APPL. NO.: <br />STRUCTURAL OBSERVATION <br />(ONLY CHECKED ITEMS ARE REQUIRED) <br />Firm or Individual to be responsible for the Structural Observation: <br />Name: <br />FOUNDATION WALL FRAME DIAPHRAGM <br />Concrete <br />Masonry <br />Wood <br />Others: <br />Footing, Stem Walls, Piers <br />Mat Foundation <br />Caisson, Piles, Grade Beams <br />Stepp'g/Retain'g Foundation, <br />Hillside Special Anchors <br />Others: <br />Concrete <br />Steel Deck <br />Wood <br />Others: <br />Steel Moment Frame <br />Steel Braced Frame <br />Concrete Moment Frame <br />Masonry Wall Frame <br />Others: HFX <br />DECLARATION BY OWNER <br />I, the Owner of the project, declare that the above listed firm or individual is hired <br />by me to be the Structural Observer. <br />Signature Date <br />Phone:Calif. Registration: <br />NOTE: <br />STRUCTURAL ENGINEER SHALL BE <br />NOTIFIED OF ANY SITE MEETING OR <br />STRUCTURAL OBSERVATION AT LEAST <br />48 HRS IN ADVANCE OF APPOINTMENT <br />DATE. <br />1401 Lowell St., Santa Ana, CA 92707 <br />STRUCTURAL OBSERVATION PROGRAM <br />AND DESIGNATION OF THE <br />STRUCTURAL OBSERVER <br />SOIL INFORMATION DEFAULT <br />EARTH MATERIAL <br />PARAMETERS <br />FOUNDATION BEARING <br />PRESSURE 1500 PSF <br />COEFFICIENT OF FRICTION (1)0.25 <br />PASSIVE EARTH PRESSURE <br />(EFP)100 PCF <br />MAXIMUM PASSIVE EARTH <br />PRESSURE 1500 PSF <br />CONVENTIONAL <br />CONTINUOUS FOOTING <br />DESIGN <br />MINIMUM FOUNDATION DEPTH 24 IN. <br />INDEPENDENT (PAD) <br />FOOTING DESIGN <br />MINIMUM EMBEDMENT DEPTH <br />INTO BEARING MATERIAL 24 IN. <br />NOTE: (1) WHEN COMBINING FRICTIONAL RESISTANCE AND PASSIVE PRESSURE, THE <br />PASSIVE PRESSURE COMPONENT SHALL BE REDUCED BY ONE-THIRD. <br />SPECIAL INSPECTIONS TABLE <br />INSPECTION TASK <br />FREQUENCY OF <br />INSPECTION <br />CONTINUOUS <br />DURING TASK <br />LISTED <br />*PERIODICALLY <br />DURING TASK <br />LISTED <br />REINFORCING STEEL <br /> A- FORMWORK FOR SHAPE, LOCATION 6 DIMENSIONS OF <br />THE CONCRETE MEMBER BEING FORMED -X <br /> B- VERIFY FOUNDATION EXCAVATIONS ARE EXTENDED TO <br />PROPER DEPTH -X <br />* PERIODIC SPECIAL INSPECTION: PART-TIME OBSERVATION OF WORK BY A DEPUTY <br />INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING <br />PERFORMED AND AT THE COMPLETION OF WORK. <br />SHEET INDEX <br />S-1.1 GENERAL NOTES & SPECIAL INSPECTIONS <br />S-2.1 STRUCTURAL PLANS <br />S-3.1 FRAMING & FOUNDATION DETAILS <br />S-4.1 TYP. FRAMING DETAILS <br />S-1.1 <br />GE <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br /> <br />& <br />SP <br />E <br />C <br />I <br />A <br />L <br /> <br />I <br />N <br />S <br />P <br />E <br />C <br />T <br />I <br />O <br />N <br />U HANGER ESR-2552 <br />FRAMING CLIPS ESR-3096 <br />SHOT PINS ESR-1799 <br />CC COLUMN CAP ESR-2604 <br />STRAP ESR-2105 <br />RESEARCH REPORT- ICC-ES# <br />Wood Knee Brace <br />1401 S Lowell St <br />11/13/2024