Laserfiche WebLink
Conclusion <br />Sincerely, <br />Ying Liu, PE <br />Ahmed Youssef, PE <br />Patrick Bair, PE <br />Target T0286 - Santa Ana - Final Report <br />7/19/2024 <br />Sheet 6.1 <br />Prepared by PB <br />Based on our experience and engineering analysis of the information available at the time of this writing, it is the <br />opinion of this organization that the added stresses due to the weight of the proposed PV modules are considered <br />acceptable and will not exceed the capacity of the existing roof structure. The proposed PV modules may be installed <br />at Target T0286 - Santa Ana under the conditions outlined in the body of this report. <br />Do not stage pallets on roof unless staging plan drawing is provided by PPE. <br />This report does not represent an approval of the proposed PV system design. It is the racking designer’s <br />responsibility to ensure any proposed racking system is within the limits stated in this report and their system is <br />designed in accordance with the requirements in the governing building code. PPE can review the existing framing <br />adequacy for anchorage reaction loads upon request and if the racking design are supplied to PPE by the racking <br />designer. <br />PPE-05184.03 <br />Checked by AY <br />1330 E Seventeenth <br />St4/10/2025