GEO-ETKA, INC. <br /> Job No: F-12136-24 <br />7 <br /> <br />Demolition and Tree Removal <br /> <br />Special note should be taken during the grading so as to locate all underground items, <br />e.g. pipe, conduit, storage tanks, septic tanks, cesspools or leach lines, water wells, <br />irrigation pipe, etc. Any septic tank found should be removed from the site. <br /> <br />Any seepage pit or cesspool found shall be pumped dry and filled with 2-sack slurry <br />concrete. The top and sides should be broken and removed if they are within 5 feet of <br />finished grade. <br /> <br />If a water-well is found it shall be cut off and capped, 5 feet below finished grade. <br /> <br />Any metal pipe found shall be excavated and cleared from the site. Any vitrified clay <br />leaching lines may be broken in place. <br /> <br />Any tree that has to be removed, due to the construction, should be completely <br />removed and the cavity backfilled as described in the grading section. Any/all roots <br />found shall be excavated and cleared from the site or mulched for future landscaping <br />use. <br /> <br />All cavities should be cut in a ā€œVā€ shape so that compaction equipment will not bridge <br />during grading which should be conducted in the manner noted below. <br /> <br />It is recommended that the demolition be observed so as to prevent debris from <br />remaining on or being buried on site. The demolition of the below grade items such as <br />pipes and tree root systems must be checked by the soil engineer or his representative. <br />2010 & 2012 N Bush Ave, <br />#100 and #1012/21/2025