My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 & 2012 N Bush Ave, #100 and #101 - REV 1 - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bush St
>
2012 N Bush St Unit# 100
>
2010 & 2012 N Bush Ave, #100 and #101 - REV 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 2:35:24 AM
Creation date
6/6/2025 1:18:39 PM
Metadata
Fields
Template:
Plan
Permit Number
101121423
101121424
Full Address
2012 N Bush St Unit# 100
2012 N Bush St Unit# 101
Street Number
2012
2012
Street Direction
N
N
Street Name
Bush
Bush
Street Suffix
St
St
Unit Number
100
101
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GEO-ETKA, INC. <br /> Job No.: F-12136-24 <br /> <br /> <br /> <br />STANDARD <br />GEOTECHNICAL OBSERVATION & MATERIAL TESTING <br />RECOMMENDATIONS <br /> <br />Observation & Testing <br /> <br />Compaction observations and testing, site inspections, meetings, and other testing will <br />be required throughout the construction, following are the typical items: <br /> <br />• Pre-construction meeting. <br />• Bottom inspection of all overexcavations. <br />• Testing during the compaction of the overexcavated area and the precise <br />grade. <br />• Footing excavations, prior to the pouring of concrete. <br />• After presoaking the slabs upgrade and prior to pouring concrete slabs <br />• During the construction of area drain and utility trenches <br />• Waterproofing, behind the retaining wall. <br />• Gravel pack, drainage system behind the retaining wall. <br />• Backfilling and compaction of the soil behind the retaining wall. <br />• Compaction of driveway’s subgrade soil. <br />• Compaction of subgrade road base materials. <br />• When any unusual conditions are encountered during any construction <br />operation subsequent to this report. <br /> <br />Pre-Grade Meeting <br /> <br />To avoid any possible delays or misinterpretations, a representative of our firm must <br />be notified to attend the pre-construction meeting with the grading contractor and the <br />city inspector to review the grading plans, the soil report, the site conditions, and any <br />potential changes prior to starting the grading. <br /> <br /> <br />Special Inspections <br /> <br />When required per the approved plans, a licensed deputy inspector should be <br />engaged for the steel, concrete, epoxy, welding, nailing and other required <br />inspections. In addition, concrete testing/sampling is needed for reporting <br />compressive test data. <br />2010 & 2012 N Bush Ave, <br />#100 and #1012/21/2025
The URL can be used to link to this page
Your browser does not support the video tag.