Laserfiche WebLink
8 4 <br />09 <br />7 <br />6 <br />3 <br />2 <br />5 <br />10 <br />12 <br />AD-1 <br />DETAILS <br />14 <br />15 <br />SHOWER/TUB <br />SCREED <br />01 <br />626 Shelley Rd. <br />Santa Ana, Ca <br />SHELLEY <br />SIGNATURE <br />Jeffrey Jonsson <br />Architect Retired <br />949 412 3955 <br />92662 <br />Newport Beach, Ca <br />216 Pearl Ave <br />121823 <br />RECEPTOR LINING MUST EXTEND <br />3" (76.2MM) ABOVE TOP OF FINISHED <br />DAM AND OUTWARD ON FACE OF <br />ROUGH JAMB. <br />FUR OUT OR NOTCH STUDS <br /> TO RECEIVE LINING. <br />KEEP LINING FLUSH WITH FACE <br />OF STUDS OR FURRING <br />MORTAR SETTING BED <br />WITH APPROVED ADDITIVE. <br />3"X3" (76.2X76.2 MM) 13 <br />GAGE WELDED STEEL MESH <br />(OR APPROVED EQUAL) SET <br />APPROXIMATELY CENTER OF BED. <br />1O24 (0.66M2) MINIMUM <br />FLOOR AREA FINISH FLOOR <br />TO HAVE MINIMUM OF 1/4" <br />(20.8 MM/M) AND MAXIMUM <br />OF 1/2" (41.7 MM/M) <br />PITCH TO DRAIN PER FOOT. <br />RECEPTOR LINING MUST EXTEND 3" <br />ABOVE TOP OF FINISHED DAM AND <br />OUTWARD ON FACE OF ROUGH JAMB. <br />FLANGE OF <br />APPROVED <br />TYPE SUB DRAIN <br />SET <br />EXACTLY LEVEL <br />WITH SUB <br />FLOOR WITH <br />CLAMPING <br />RING OR OTHER <br />DEVICE TO <br />MAKE TIGHT <br />CONNECTION <br />WITH RECEPTOR <br />LINING. <br />RECEPTOR LINING 3 LAYERS OF 15 LB (6.8KG) <br />ASPHALT SATURATED ROOFING FELT EACH LAYER <br />THOROUGHLY MOPPED WITH HOT ASPHALT ALL <br />CORNERS THOROUGHLY WATER TIGHT BY LAPPING <br />AND FLASHING (OR) APPROVED EQUAL) AND <br />REINFORCED WITH 50LB (22.7KG) TEAR <br />STRENGTH WOVEN GLASS FIBER WEBBING HOT <br />MOPPED IN PLACE AND EXTENDING 4° (101.6MM) <br />IN ALL DIRECTIONS FROM EACH CORNER. <br />FINISH HEIGHT OF DAM TO BE AT LEAST <br />2" ABOVE HIGH POINT OF SHOWER FLOOR. <br />RECEPTOR LINING TURNED OVER DAM & <br />THOROUGHLY TACKED OUTSIDE. NO <br />PUNCTURE OR NAIL BELOW HEIGHT OF <br />DAM ON INTERIOR. <br />RECEPTOR LINING SHALL BE PITCHED <br />1/4" PER FOOT (20.8MM/M) TO WEEP <br />HOLES IN DRAIN. <br />NOTE: HOT MOPPED SHOWER PAN TO BE INSPECTED BY THE <br />ADMINISTRATIVE AUTHORITY UPON COMPLETION OF HOT MOPPING. <br />VENT FLASHING <br />SHOWER WALL COVERING TO BE 70" MIN. <br />ABOVE DRAIN <br />ROOF VENTING 16 <br />HOLD - 626 S <br />Shelley St4/28/2025