Laserfiche WebLink
SCOPE OF WORK: <br />INSTALL (18) APTOS DNA-120-BF10-440W SOLAR ELECTRIC MODULES AND <br />(18) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY TAR & <br />GRAVEL ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, <br />CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) SOLAREDGE ENERGY HUB <br />SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) LG CHEM RESU 16H <br />PRIME BATTERY, (1) AC DISCONNECT, AND INSTALL OCPD IN MAIN SERVICE PANEL. <br />HOMEOWNER: LESLIE YAM <br />PH: 714.856.1988 <br />ADDRESS: 4021 MARY CIRCLE <br />SANTA ANA, CA 92703 <br />DATE: 7/30/24 <br />ING ELECTRIC INC <br />1451 DOMIGUEZ RANCH ROAD <br />CORONA, CA 92882 <br />PH: 951.399.2555 NORAN ING C10 - 1048140 <br />VICINITY MAP <br />YAM <br />RESIDENCE <br />SHEET INDEX: <br />SHEET 1 PROJECT INFO, VICINITY MAP, NOTES, SCOPE OF WORK <br />SHEET 2 SITE/ROOF PLAN <br />SHEET 3 ELEVATION DETAIL, WALL ELEVATION DETAIL <br />SHEET 4 ELECTRIC LINE DRAWING, GROUNDING DETAIL <br />SHEET 5 SIGNS <br />SHEET 6 CALCULATIONS <br />ATTACHED MODULE, INVERTER, MOUNTING HARDWARE SPEC SHEETS, <br />STRUCTURAL REPORT <br />NTS <br />SHEET <br />NOTICE: <br />ANY CHANGES TO OR USES OF THESE DOCUMENTS/DRAWINGS WITHOUT THE <br />WRITTEN CONSENT OF JENNIFER KEMME OR SCOTT HARRIS ARE STRICTLY PROHIBITED. <br />1 OF 6 <br />PLANS PREPARED BY: <br />JENNIFER KEMME <br />PH: 909.748.1300 <br />(18) APTOS DNA-120-BF10-440W <br />PEAK POWER = 440 W <br />MAX OPERATING CURRENT = 12.68 A <br />MAX OPERATING VOLTAGE = 34.71 V <br />OPEN CIRCUIT VOLTAGE = 41.51 V <br />SHORT CIRCUIT CURRENT = 12.88 A <br />MAX SERIES FUSE RATING = 30 A <br />TEMP. COEFF. OF Voc = -0.27%/°C <br />DIMENSIONS = 75.1" X 44.6" X 1.3" <br />WEIGHT = 50.2 LBS <br />GENERAL NOTES: <br />1. THIS SYSTEM COMPLIES WITH THE 2022 CRC, 2022 CBC, 2022 CFC, AND THE 2022 <br />CEC. <br />2. THE SYSTEM WILL NOT BE TURNED-ON UNTIL THE SERVING UTILITY COMPANY <br />HAS BEEN NOTIFIED. <br />3. THE INSTALLED SOLAR SYSTEM HAS A DISTRIBUTED WEIGHT LESS THAN 4 PSF. <br />4. THE CONCENTRATED LOAD FOR EACH VERTICAL SUPPORT IS LESS THAN 40 LBS. <br />5. ALL PV EQUIPMENT IS LISTED BY A RECOGNIZED TESTING LAB. INVERTERS ARE <br />UL 1741 COMPLIANT. <br />6. THE BACKFED BREAKER WILL BE LOCATED AT THE OPPOSITE END OF THE BUS <br />FROM THE MAIN BREAKER. <br />7. CONDUCTORS ARE 90° C RATED COPPER WIRE. <br />8. ANY CONDUCTORS EXPOSED TO SUNLIGHT ARE LISTED AS SUNLIGHT <br />RESISTANT. <br />9. IF DC CONDUCTORS ARE RUN INSIDE THE BUILDING, THEY WILL BE CONTAINED <br />IN A METAL RACEWAY. <br />10. ANY CONDUCTORS BETWEEN SEPARATE ARRAYS ON THE ROOF WILL BE <br />PROTECTED IN CONDUIT. <br />11. THE EQUIPMENT GROUNDING CONDUCTOR ON THE ROOF WILL BE PROTECTED <br />FROM PHYSICAL DAMAGE. IT WILL BE TUCKED NEATLY UNDER THE MODULES <br />AND RAILS AND SECURED IN PLACE. <br />12. THE MODULES WILL BE ATTACHED TO THE EQUIPMENT GROUNDING <br />CONDUCTOR IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. <br />13. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES ARE RAIN-TIGHT AND APPROVED <br />FOR USE IN WET LOCATIONS. <br />14. CLEARANCES AROUND ALL ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN <br />ACCORDANCE WITH CEC 110.26. <br />15. SOLAR MODULES WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR <br />BUILDING ROOF VENTS. <br />16. IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE A VERIFIABLE <br />GROUNDING ELECTRODE SYSTEM, A GROUNDING ELECTRODE SYSTEM WILL BE <br />INSTALLED PER CEC 250.50. THE ELECTRICAL SERVICE WILL BE BONDED TO THE <br />WATER AND GAS PIPING PER SECTION 250.104 OF THE CEC. <br />17. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH CAL-OSHA <br />REGULATIONS. <br />70402PV5 <br />INVERTER/DC DISCONNECT: (1) SOLAREDGE ENERGY HUB SE7600H-US <br />MAX DC INPUT VOLTAGE = 480 V <br />NOMINAL DC INPUT VOLTAGE = 400 V <br />MAX DC INPUT CURRENT = 20.0 A <br />DC DISCONNECT MAX INPUT CURRENT = 45.0 A <br />NUMBER OF DC INPUTS = 2 <br />RATED AC POWER = 7600 W <br />AC VOLTAGE = 240 V <br />MAX AC OUTPUT CURRENT = 32.0 A <br />NEMA 4X ENCLOSURE <br />DIMENSIONS = 17.7" X 14.6" X 6.8" <br />WEIGHT = 26 LBS <br />PHOTOVOLTAIC SOLAR PROJECT INFORMATION: <br />SYSTEM SIZE: 7.920 kW (DC), 7.260 kW (AC) <br />MODULES: <br />MODULE ADD-ON:(18) SOLAREDGE S440 <br />DC POWER OPTIMIZERS <br />MAX DC INPUT VOLTAGE = 60 V <br />OPERATING VOLTAGE RANGE = 8 V - 60 V <br />MAX DC INPUT CURRENT = 14.5 A <br />MAX DC OUTPUT CURRENT = 15 A <br />DC OUTPUT VOLTAGE = 380 V <br />MAX POWER PER STRING <br />(CONTROLLED BY INVERTER) = 5700 W <br />NEMA 6P ENCLOSURE <br />DIMENSIONS = 5.1" X 6.1" X 1.2" <br />WEIGHT = 1.6 LB <br />ARRAY:INSTALLED WEIGHT = 2.9 PSF <br />ROOF COVERAGE = 420 SF, <br />ARRAYS COVER 18% OF TOTAL ROOF AREA <br />MOUNTING HARDWARE: K2 CROSSRAIL 48XL RAIL <br />K2 SPLICE FOOT WITH <br />K2 EVERSEAL ATTACHMENTS <br />5 16" STAINLESS STEEL LAG BOLTS @ <br />64" OC OR LESS WITH A MINIMUM OF <br />212" PENETRATION INTO ROOF RAFTERS <br />EXISTING ROOF INFO: 1 STORY, TAR & GRAVEL <br />4 X 6 RAFTERS @ 32" OC <br />BATTERY: (1) LG CHEM RESU 16H PRIME <br />USABLE ENERGY = 16 kWh <br />PEAK POWER = 11 kW FOR 10SEC. <br />PEAK CURRENT = 32.8 A FOR 10SEC. <br />MAX POWER = 7.0 kW <br />IP55 ENCLOSURE <br />DIMENSIONS = 19.8" X 42.8" X 11.6" <br />WEIGHT = 350 LBS <br />JENNIFER <br />KEMME <br />No: 73054 <br />Exp: 12/31/24 <br />CIVIL <br />The scope of the plans is for the installation of the <br />solar photovoltaic system only and the approval is <br />subject to compliance with all applicable city and <br />state codes and regulations regarding <br />construction. The approval of the plans does not <br />constitute any certification of the accuracy, <br />completeness, or building permit status of the <br />existing buildings and structures as shown. <br />Bldg# 101120659 <br />Elec# 20183864 <br />Approvals: <br />Elec. MSmith <br />4021 W Mary Cir <br />9/12/2024