My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4021 W Mary Cir - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Mary Cir
>
4021 W Mary Cir
>
4021 W Mary Cir - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:20:21 PM
Creation date
6/6/2025 1:20:06 PM
Metadata
Fields
Template:
Plan
Permit Number
20183864
101120659
Full Address
4021 W Mary Cir
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCOPE OF WORK: <br />INSTALL (18) APTOS DNA-120-BF10-440W SOLAR ELECTRIC MODULES AND <br />(18) SOLAREDGE S440 DC POWER OPTIMIZERS ON THE EXISTING 1ST STORY TAR & <br />GRAVEL ROOF. INSTALL ASSOCIATED MOUNTING HARDWARE, JUNCTION BOXES, <br />CONDUIT, CONDUCTORS AND GROUNDING. INSTALL (1) SOLAREDGE ENERGY HUB <br />SE7600H-US INVERTER WITH INTEGRATED DC DISCONNECT, (1) LG CHEM RESU 16H <br />PRIME BATTERY, (1) AC DISCONNECT, AND INSTALL OCPD IN MAIN SERVICE PANEL. <br />HOMEOWNER: LESLIE YAM <br />PH: 714.856.1988 <br />ADDRESS: 4021 MARY CIRCLE <br />SANTA ANA, CA 92703 <br />DATE: 7/30/24 <br />ING ELECTRIC INC <br />1451 DOMIGUEZ RANCH ROAD <br />CORONA, CA 92882 <br />PH: 951.399.2555 NORAN ING C10 - 1048140 <br />ELECTRICAL LINE DIAGRAM <br />SHEET <br />NOTICE: <br />ANY CHANGES TO OR USES OF THESE DOCUMENTS/DRAWINGS WITHOUT THE <br />WRITTEN CONSENT OF JENNIFER KEMME OR SCOTT HARRIS ARE STRICTLY PROHIBITED. <br />4 OF 6 <br />PLANS PREPARED BY: <br />JENNIFER KEMME <br />PH: 909.748.1300 <br />MAIN SERVICE INFO: <br />200 A, 120/240 VAC, <br />1Ø, 3-WIRE <br />40A <br />200A <br />EXISTING BUILDING <br />GROUNDING <br />ELECTRODE SYSTEM <br />M <br />EXISTING SERVICE PANEL: <br />200 A BUS RATED, 240 VAC, 1Ø <br />G <br />L1 <br />L2 <br />60 A, 240 VAC, 1Ø <br />AC DISCONNECT <br />LOCKABLE, VISIBLE <br />KNIFE-BLADE TYPE <br />(3) 8 AWG THWN-2 & <br />(1) 8 AWG GROUND <br />IN 3 4" EMT CONDUIT <br />(3) 8 AWG THWN-2 & <br />(1) 8 AWG GROUND <br />IN 3 4" EMT CONDUIT <br />L1 <br />L2 <br />N <br />G <br />SOLAREDGE INTEGRATED DC DISCONNECT, <br />AC DISCONNECT & RAPID SHUTDOWN DEVICE <br />SOLAREDGE ENERGY HUB SE7600H-US <br />240 VAC, 1Ø TRANSFORMERLESS INVERTER <br />- <br />+ <br />PV <br />BAT <br />NC NC <br />NONO <br />L1 <br />L2 <br />NOTE TO INSTALLERS: <br />PLEASE SEE THE INSTALLATION <br />MANUAL FOR PROPER CT INSTALLATION <br />(THEY ARE DIRECTIONAL) FOR <br />MONITORING AND OPERATION. <br />APTOS <br />DNA-120-BF10-440W <br />+ <br />- <br />+ <br />- <br />SOURCE CIRCUIT #1: <br />9 MODULES, 600 VDC <br />+ <br />- <br />+ <br />- <br />(4) 10 AWG PV IN AIR <br />(9) 600 VDC <br />SOLAREDGE S440 <br />OPTIMIZERS <br />+ <br />- <br />+ <br />- <br />+ <br />- <br />+ <br />- <br />SOURCE CIRCUIT #2: <br />9 MODULES, 600 VDC <br />+ <br />- <br />+ <br />- <br />+ <br />- <br />+ <br />- <br />(9) 600 VDC <br />SOLAREDGE S440 <br />OPTIMIZERS <br />NEMA 3R, 600 VDC <br />JUNCTION BOX <br />(4) 10 AWG THWN-2 & <br />(1) 8 AWG GROUND <br />IN 3 4" EMT CONDUIT <br />USE K2 INTEGRATED GROUNDING TO <br />GROUND ALL MODULES, OPTIMIZERS, <br />JUNCTION BOXES AND ANY OTHER <br />METAL PARTS AND #6 AWG SOLID <br />COPPER WHERE NECESSARY <br />70402PV5 <br />APTOS <br />DNA-120-BF10-440W <br />APTOS <br />DNA-120-BF10-440W <br />APTOS <br />DNA-120-BF10-440W <br />APTOS <br />DNA-120-BF10-440W <br />APTOS <br />DNA-120-BF10-440W <br />-+ <br />LG CHEM <br />RESU 16H PRIME <br />400V BATTERY <br />G <br />BI-DIRECTIONAL <br />POWER FLOW <br />(2) 8 AWG THWN-2 & <br />(1) 8 AWG GROUND <br />IN 3 4" EMT CONDUIT <br />JENNIFER <br />KEMME <br />No: 73054 <br />Exp: 12/31/24 <br />CIVIL <br />PLAN CHECK NOTE: <br />The main service panel is being replaced <br />under Permit #2018-3618. Service panel <br />must be approved prior to this PV permit <br />approval. MAS(19) <br />4021 W Mary Cir <br />9/12/2024
The URL can be used to link to this page
Your browser does not support the video tag.