Laserfiche WebLink
PREFABRICATED OR SPECIALTY ITEMS AND THEIR COMPONENTS, WHICH ARE INDICATED <br />BY THE STRUCTURAL DRAWINGS TO BE DESIGNED BY OTHERS, MAY BE SUBMITTED TO <br />THE ARCHITECT AND/OR ENGINEER OF RECORD FOR REVIEW AS A DEFERRED SUBMITTAL <br />PROVIDED THAT SUCH SUBMITTAL IS AUTHORIZED BY THE BUILDING DEPARTMENT. <br />DEFERRED SUBMITTALS REQUIRED TO BE SUBMITTED TO THE STRUCTRURAL ENGINEER <br />OF RECORD SHALL INCLUDE BUT NOT BE LIMITED TO: <br />A. MECHANICAL, ELECTRICAL AND PLUMPING EQUIPMENT <br />B. SELF SUPPORTING, PRE-MANUFACTURED STAIR ASSEMBLY <br />C. PREFABRICATED ROOF & FLOOR TRUSSES <br />D. HVAC STRUCTURAL SUPPORT REQUIREMENTS <br />E. AWNINGS, SIGNAGE, FASCIAS, ETC. <br />F. FIRE SPRINKLERS <br />G. CONTINUOUS TIE DOWN SYSTEM <br />H. CONCRETE MIX DESIGN <br />CONTINUOUS AND PERIODIC SPECIAL INSPECTION IS REQUIRED FOR THE WORK AS <br />DESCRIBED IN IBC/CBC CHAPTER 17, SEE INSPECTION SCHEDULE BELOW, ONLY CHECKED <br />ITEMS ARE REQUIRED. <br />APPROVAL BY THE INSPECTOR DOES NOT MEAN APPROVAL OF FAILURE TO COMPLY WITH THE <br />PLANS OR SPECIFICATIONS, ANY DETAIL THAT FAILS TO BE CLEAR OR IS AMBIGUOUS MUST BE <br />REFERRED TO THE STRUCTURAL ENGINEER FOR INTERPRETATION OR CLARIFICATION. <br />CONTINUOUS SPECIAL INSPECTION PER AWS D1.1 IS REQUIRED FOR ALL STRUCTURAL STEEL <br />WELDING, EXCEPT FOR SINGLE PASS FILLET WELDS NOT EXCEEDING 5/16" IN SIZE. <br />STRUCTURAL WOOD, PERIODIC SPECIAL INSPECTION IS REQUIRED FOR WOOD SHEARWALLS, <br />SHEAR PANELS, AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING, AND OTHER <br />FASTENING OF COMPONENTS OF THE SEISMIC FORCE RESISTING SYSTEM, INCLUDING WOOD <br />SHEARWALLS, WOOD DIAPHRAGMS, DRAG STRUTS, BRACES, SHEAR PANELS, AND HOLD-DOWNS, <br />EXCEPTION: SPECIAL INSPECTION IS NOT REQUIRED FOR WOOD SHEARWALLS, SHEAR PANELS <br />AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING AND OTHER FASTENING TO OTHER <br />COMPONENTS OF THE SEISMIC FORCE RESISTING SYSTEM, WHERE THE FASTENER SPACING OF <br />THE SHEATHING IS MORE THAN 4 INCHES ON CENTER. INSPECTIONS SHALL BE PERFORMED <br />BEFORE COVERING. <br />1. <br />1. <br />SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS. SHOP DRAWINGS <br />ARE REVIEWED ONLY FOR GENERAL COMPLIANCE WITH THE STRUCTURAL DRAWINGS. <br />DESIGN ACCURACY OF SUCH PRODUCT, DIMENSIONS AND QUANTITY OF THE PRODUCT <br />IS NOT REVIEWED BY EOR. RESPONSIBILITY FOR CORRECTNESS SHALL REST WITH THE <br />CONTRACTOR. ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS FROM CONTRACT <br />DRAWINGS SHALL BE CLOUDED ANY OF THE AFOREMENTIONED SHALL NOT BE <br />CONSIDERED APPROVED AFTER ENGINEER'S REVIEW UNLESS SPECIFICALLY NOTED <br />ACCORDINGLY. <br />3. <br />THE SHOP DRAWINGS DO NOT SUPERSEDE OR REPLACE THE ORIGINAL CONTRACT <br />DRAWINGS. ANY ENGINEERING PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW <br />SHALL BEAR THE SEAL OF AN APPROPRIATELY REGISTERED ENGINEER. ENGINEERING <br />SYSTEM SOLUTIONS SHALL NOT BE RESPONSIBLE FOR THE ADEQUACY OF ENGINEERING <br />DESIGNS PERFORMED BY OTHERS. <br />4. <br />SHOP DRAWINGS SHALL REFERENCE DATE AND DELTA (IF ANY) OF CONTRACT DRAWINGS.5. <br />ALL DEFERRED SUBMITTALS SHALL INCLUDE CALCULATIONS AND DRAWINGS PREPARED IN <br />ACCORDANCE WITH ALL APPLICABLE BUILDING CODES AND STAMPED BY AN <br />APPROPRIATELY LICENSED PROFESSIONAL ENGINEER. SUBMITTALS SHALL SHOW <br />LOCATION AND MAGNITUDE OF LOADS, SIZE AND CONFIGURATIONS OF MEMBERS, AND <br />COMPATIBILITY WITH THE PRIMARY STRUCTURAL SYSTEM. <br />2. <br />CONTRACTOR RESPONSIBLE FOR CONSTRUCTION OF A WIND OR SEISMIC FORCE RESISTING <br />SYSTEM/COMPONENT LISTED IN THIS STATEMENT OF SPECIAL INSPECTION SHALL SUBMIT A <br />WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR <br />TO THE COMMENCEMENT OF WORK ON SUCH A SYSTEM OR COMPONENT PER SEC <br />1704.4. <br />WHERE FABRICATION OF MEMBERS AND ASSEMBLIES IS PERFORMED ON THE PREMISES OF A <br />FABRICATOR'S SHOP, SPECIAL INSPECTION OF THE FABRICATED ITEMS SHALL BE REQUIRED BY <br />THIS SECTION, UNLESS THE FABRICATOR IS REGISTERED AND APPROVED TO PERFORM SUCH <br />WORK WITHOUT SPECIAL INSPECTION, APPROVAL SHALL BE BASED UPON REVIEW OF THE <br />FABRICATOR'S WRITTEN PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC AUDITING <br />OF FABRICATION PRACTICES BY AN APPROVED SPECIAL INSPECTION AGENCY, AT COMPLETION <br />OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE <br />TO THE BUILDING OFFICIAL STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH <br />THE APPROVED CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL BE RESPONSIBLE OF <br />VERIFYING APPROVAL OF FABRICATOR. <br />2. <br />3. <br />4. <br />5. <br />6. <br />SUBMITTALS AND SHOP DRAWINGS <br />STATEMENT OF SPECIAL INSPECTION: <br />THE SPECIAL INSPECTOR SHALL BE A QUALIFIED INDIVIDUAL WHO WILL DEMONSTRATE <br />COMPETENCE, AND KNOWLEDGE TO THE BUILDING OFFICIAL, FOR THE SPECIFIC TYPE OF SPECIAL <br />INSPECTION REQUIREMENT REQUIRED PER SCHEDULE BELOW. <br />7. <br />WOOD SPECIAL INSPECTIONS SHALL BE PER CBC SECTION 1705.5.8. <br />SPECIAL INSPECTIONS FOR WIND AND SEISMIC RESISTANCE SHALL BE PER SECTION 1705.11 <br />AND 1705.12 RESPECTIVELY. <br />9. <br />REQ'D(?) <br />STATEMENT OF SPECIAL INSPECTIONS <br />(ONLY INDICATED ITEMS ARE REQUIRED) <br />INSPECTION ITEMS SPECIAL INSPECTIORS <br />(NAME, PHONE#, REGISTRATION#) <br />STRUCTURAL STEEL (1705.2.1) <br />STEEL FRAME JOINT DETAILS <br />COLD-FORMED STEEL DECK (1705.2.2) <br />OPEN-WEB STEEL JOISTS AND <br />JOISTS GIRDERS (1705.2.3) <br />REINFORCING STEEL AND <br />PRE-STRESSING STEEL TENDONS <br />SHOTCRETE (CURING TEMPERATURE, <br />DESIGN MIX, PLACEMENT, STRENGTH <br />ETC. PER TABLE 1705.3) <br />COLD-FORMED STEEL TRUSSES SPANNING <br />>= 60 FT <br />CONCRETE CONSTRUCTION (DESIGN MIX, <br />FORMWORK, PLACEMENT, ETC. PER TABLE <br />1705.3) (SEE 1705.3 EXCEPTIONS) <br />STRUCTURAL WELDING/REBAR WELDING <br />ALL MASONRY CONSTRUCTION (1705.4) <br />WOOD FOR HIGH LOAD DIAPHRAGMS <br />(1705.5.1) <br />METAL-PLATE-CONNECTED WOOD <br />TRUSSES SPANNING >=60 FT <br />SOILS (EXCAVATION, FILL, ETC. PER <br />1705.6) (SEE 1705.6 EXCEPTIONS) <br />DRIVEN PILES PER 1705.7 <br />CAST IN PLACE PILES PER 1705.8 <br />HELICAL PILE FOUNDATIONS PER 1705.9 <br />ERECTION OF PRE- CAST CONCRETE MEMBERS <br />BOLTS INSTALLED IN CONCRETE <br />HIGH STRENGTH BOLTING/MATERIAL <br />VERIFICATION <br />WOOD DIAPHRAGM AND SHEAR WALLS* <br />*: FOR SPECIAL INSPECTION OF WOOD DIAPHRAGMS AND SHEAR WALLS, CONTACT EOR FOR <br />SCHEDULE. <br />EPOXY/ POST INSTALLED ANCHORS <br />YES <br />54312 <br />R <br />E <br /> <br />V <br /> <br />I <br /> <br />S <br /> <br />I <br /> <br />O <br /> <br />N <br />DA <br />T <br />E <br /> <br /> <br /> <br />SHEET NO.: <br />PROJECT MANAGER: <br />P.P. <br />DATE: <br />JOB NO.: 231014 <br />12/26/2023 <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />A <br />d <br />d <br />r <br />e <br />s <br />s <br />: <br />SI <br />N <br />G <br />L <br />E <br /> <br />F <br />A <br />M <br />I <br />L <br />Y <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />90 <br />1 <br /> <br />E <br /> <br />M <br />Y <br />R <br />T <br />L <br />E <br /> <br />S <br />T <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />N <br />a <br />m <br />e <br />: <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />6 <br />12/26/2023 <br />GE <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br /> <br />& <br />RE <br />Q <br />U <br />I <br />R <br />E <br />M <br />E <br />N <br />T <br />S <br />S-0.11 <br />& <br />SO <br />I <br />L <br /> <br />R <br />E <br />P <br />O <br />R <br />T <br />901 E Myrtle St Unit# 2 - <br />1011181606/27/2024