Laserfiche WebLink
Roof Loads (Load_Roof) <br />Clay Tile 10 psf <br />Framing 2.5 psf <br />Sheathing (1/2" CDX)1.5 psf <br />Ceiling 2.5 psf <br />Insulation 1.5 psf <br />Misc.2 psf <br />Total De ad Load 20 psf <br />Liv e Load 20 psf <br />Total Load 40 psf <br /> <br />Interior Wall (Wall_In) <br />Insulation 1 psf <br />Drywall 5 psf <br />Studs 1 psf <br />Misc.3 psf <br />Total De ad Load 10 psf <br /> <br />Exterior Wall (Wall_Ex) <br />7/8" Stucco 10 psf <br />Insulation 1 psf <br />Drywall 2.5 psf <br />Studs 1 psf <br />Misc.2.5 psf <br />Total De ad Load 17 psf <br /> <br />Ceiling Loads (Load_Ceiling) <br />Framing 6 psf <br />Total De ad Load 6 psf <br />Liv e Load 10 psf <br />Total Load 16 psf <br /> <br /> <br />DESIGN LOADS <br /> <br />vG23.06.30 <br />: <br />: <br />: <br />: <br />Com pany <br />Project (N) DETACHED ADU, UNIT 2 <br />Job No.231014 <br />Plan <br />: <br />: <br />: <br />: <br />Designed T.M. <br />Checked P.P. <br />Date 2023-12-26 <br />Client N/A <br />TIC Structure Design 2023 <br />5 <br />901 E Myrtle St Unit# 2 - <br />1011181606/27/2024