Laserfiche WebLink
GRAHAM GIBSON <br />CALVIN LOTZ <br />23.04.13 <br />23.04.13 <br />SCALE:DWG TITLE:PAGE #: <br />REV.#BY DATE DESCRIPTION <br />ORIGINAL BY: <br />REVIEWED BY: <br />DATE: <br />DATE: <br />PLACARDS & NOTES <br />INDIVIDUAL PLOT PLAN <br />NTS <br />COMMUNITY NAME <br />BUILDER ADDRESS <br />SITE ADDRESS <br />DESIGNER INFORMATION <br />824 SOUTH HARBOR BOULEVARD <br />SANTA ANA, CA 92704 <br /> SANTA ANA 7 <br />6531 IRVINE CENTER DR. #200 <br />IRVINE, CA 92618 <br />CITY VENTURES: <br /> 01 MA 23.10.05 LAYOUT UPDATE <br />INSTALLATION NOTES: <br />SOLAR CONTRACTOR - <br />1.ALL PV ROOF ATTACHMENTS WILL BE SPACED ALONG MODULE RACKING RAILS AT NOT GREATER THAN 48" O.C. <br />2.ALL PV ROOF ATTACHMENTS WILL BE STAGGERED BY ROW AMONGST THE ROOF FRAMING MEMBERS, TO MAXIMUM EXTENT POSSIBLE. <br />3.ROOF PENETRATIONS ASSOCIATED WITH SOLAR RACKING WILL BE SEALED WITH AN APPROVED SEALANT. <br />4.ROOFTOP WIRE TRANSITION WILL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. IT WILL BE FLASHED AND SEALED. <br />5.PV ARRAY WILL BE A MINIMUM OF 3" ABOVE THE COMPOSITE SHINGLE ROOF SURFACE. <br />6.THE RACKING SYSTEM AND SOLAR PV ARRAY WILL BE INSTALLED ACCORDING TO THE MANUFACTURER'S MANUAL AND INSTALLATION GUIDES. <br />7.MID CLAMPS REQUIRE .37 INCH (3/8") SPACE BETWEEN PV MODULES. RAILS SHALL EXTEND 2" BEYOND ARRAY. SOLAR CONTRACTOR IS RESPONSIBLE FOR PROPER RAIL LENGTH <br />AND INSTALLATION. <br />8.THE MAXIMUM HEIGHT OF A SOLAR COLLECTOR SHALL BE NO MORE THAN TWO FEET, MEASURED PERPENDICULAR TO THE ROOF SURFACE, AND MY NOT EXCEED THE MAXIMUM <br />OVERALL BUILDING HEIGHT. <br />9.ALL SOLAR ENERGY SYSTEM APPURTENANCES SHALL BE SCREENED TO THE MAXIMUM EXTENT POSSIBLE WITHOUT COMPROMISING THE EFFECTIVENESS OF THE SOLAR <br />COLLECTORS, AND SHALL BE OF A COLOR SIMILAR TO THE COLOR OF THE SURFACE UPON WITH THEY ARE MOUNTED. <br />10.THE ADDRESS OF EACH UNIT SHALL BE VISIBLE ON THE SITE PLAN.   <br />11.RAIL/RACKING/MOUNTING SYSTEM HAS BEEN TESTED BASED ON UL 2703 AND CLASSIFIED AS CLASS A FIRE RATED COMPONENTS. (SEE MASTER PERMIT SET AND PROVIDED <br />SPEC SHEETS) <br />12.PV PANEL HAS BEEN TESTED BASED ON UL 1703. (SEE MASTER PERMIT SET AND PROVIDED SPEC SHEETS) <br />ELECTRICAL NOTES: <br />GENERAL - <br />1) ALL PV EQUIPMENT WILL BE TESTED AND LISTED FOR ITS USE BY A NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL). <br />2) THE GROUNDING OF THE PHOTOVOLTAIC SYSTEM SHALL COMPLY WITH THE APPLICABLE VERSION OF THE NEC/CEC. <br />3) ALL GROUNDING ELECTRODE CONDUCTORS WILL BE INSTALLED IN A CONTINUOUS LENGTH EXCEPT WHERE SPLICED BY AN IRREVERSIBLE CONNECTOR OR EXOTHERMIC WELD. <br />4) NON-CURRENT CARRYING METAL PARTS SHALL BE CHECKED FOR PROPER GROUNDING, NOTING THAT TERMINAL LUGS BOLTED ON AN ENCLOSURE'S FINISHED SURFACE MAY BE <br />ELECTRICALLY INSULATED BECAUSE OF PAINT/FINISH. PAINT/FINISH AT POINT OF CONTACT SHALL BE PROPERLY REMOVED. <br />5) ROOF PENETRATIONS WILL BE COMPLETED AND SEALED PER APPLICABLE CODE. <br />6) ALL CONDUCTORS WILL HAVE A 90°C RATING TO ENSURE CODE COMPLIANCE. <br />7) PV INVERTERS ARE TESTED AND LISTED FOR COMPLIANCE WITH RAPID SHUTDOWN REQUIREMENTS OF SECTION 690.12 OF THE CEC. <br />SOLAR CONTRACTOR - <br />8) MODULE CERTIFICATIONS WILL INCLUDE UL1703, IEC61215, IEC61730. <br />9) CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS. <br />10) RACEWAY POINT OF PENETRATION FROM EXTERIOR TO INTERIOR WILL BE SEALED TO PREVENT INGRESS OF WATER AND INSECTS. <br />11) MODULE AND MODULE LEVEL POWER ELECTRONICS WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY USING SUITABLE WIRING CLIPS. WIRING SHALL NOT MAKE <br />CONTACT WITH THE ROOF SURFACE AND SHALL BE MANAGED IN A WORKMAN-LIKE MANNER. <br />12) EQUIPMENT GROUNDING CONDUCTORS WILL BE SIZED IN ACCORDANCE WITH CEC 250.122. <br />13) CONDUCTOR TERMINATIONS WILL BE TORQUED PER DEVICE LISTING, OR MANUFACTURER'S RECOMMENDATIONS. <br />14) CABLE OR OTHER MEANS TO CONNECT INVERTER TO INTERNET <br />15) INSTALLATION SHALL BE COMPLETED IN A NEAT AND WORKMAN-LIKE MANNER. <br />16) SPACE REQUIREMENTS FOR ALL ELECTRICAL EQUIPMENT WILL COMPLY WITH CEC ARTICLE 110.26. <br />SIGNAGE - <br />17) PV SYSTEMS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH CEC ARTICLE 690 AND OTHER APPLICABLE STATE AND LOCAL CODES. <br />18) ALL SAFETY MARKING / PLACARDS SHALL BE PERMANENTLY ATTACHED BY ADHESIVE OR OTHER MECHANICAL MEANS. <br />19) MARKING / PLACARDS WILL BE METAL OR PLASTIC WITH ENGRAVED OR MACHINE PRINTED LETTERING IN COMPLIANCE WITH ANSI STANDARDS. <br />20) ALL WIRING/RACEWAYS/JUNCTION BOXES WILL BE MARKED "WARNING: PHOTOVOLTAIC POWER SOURCE," OR EQUIVALENT; WIRING/RACEWAYS SHALL BE <br />MARKED EVERY 10'. <br />CA License #: 1003498 <br />Classification: B, C10, C46 <br />Namaste Solar Electric <br />888 Federal Boulevard <br />Denver, CO 80204 <br />Designer: <br />Owner: <br />Sunnova Energy Corporation <br />6531 Irvine Center Dr. #200 <br />Irvine, CA 92618 <br />4 <br />824 S Harbor Blvd <br />11/15/2023