My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CANCELLED - 1622 E Trinidad Way - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Trinidad Way
>
1622 E Trinidad Way
>
CANCELLED - 1622 E Trinidad Way - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:22:45 PM
Creation date
6/6/2025 1:22:11 PM
Metadata
Fields
Template:
Plan
Permit Number
20180672
101116306
Full Address
1622 E Trinidad Way
Document Relationships
101116306 - Permit
(Permit - Plan)
Path:
\Building\Permits\T\Trinidad Way\1622 E Trinidad Way
20180672 - Permit
(Permit - Plan)
Path:
\Building\Permits\T\Trinidad Way\1622 E Trinidad Way
Text box
ID:
1
Creator:
Import Agent
Created:
6/6/2025 1:22 PM
Modified:
5/30/2025 5:10 PM
Text:
http://www.santa-ana.org
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rev: 8/29/19 <br />S OL-01 C BC 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />Instructions: Th e licensed contractor of record sh all complete all sections, answer the ten q uestions and <br />sign the certification section below. A copy of th is form sh all be attached to each of TW O sets of plans , of <br />minimum 11 ” x 17” size. If answering NO to any of the questions, plan check shall be required. <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br /> YES NO Are the following applicable to the proposed project? <br />1. W ill th e PV system layou t provid e the required th ree -foot wide clear access path way s <br />per S ection 605.1 1 of th e C alifornia Fire C od e, and is th is sh own on th e roof plan? <br />2. W ill th e PV system be installed on a roof having only one roofing layer with no <br /> overlays? <br />3. W ill th e PV array be flu sh mou nted to th e existing roof so th at the plane of th e <br />mod ules (panels) are parallel to th e plane of th e roof? <br />4. W ill th e PV system weig h maximum 4 pounds per square feet or less? <br />5. W ill th e PV system be installed wh ere the mod ules do not overh ang any roof ed g es <br />(such as eaves, gabled end s, ridg es and hips)? <br />6. W ill th e PV system be installed with a space of 2” minimum to 10” maximum between <br /> th e u nderside of mod ule s and the surface of the roof? <br />7. W ill th e PV system be installed withou t u sing any ballast system or counter-weight <br /> system? <br />8. W ill th e anch ors be installed with a maximum horizontal anch or spacing of 6 feet <br />and is this maximum h orizontal spacing shown on the plans? <br />9. W ill th e minimum 5/1 6” lag screws be installed with a minimum of 2 -1/2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />10. Are ALL th e stru ctu ral pages of the plans stamped and signed by a C alifornia <br />licensed professional eng ineer? (inclu ding project specific site plan, PV layou t, <br />anchorage spacing , anchorag e details and manufactu rer’s PV support information.) <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name: S ignature: <br />Ph one Number: Date: <br />Email Ad d ress: <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />BETTER EARTH ELE C TRIC INC <br />1024460 <br />VIC TORIA RUIZ <br />323-398-9324 <br />VIC TORIA.R@BETTEREARTH.S OLAR <br />8/22/2023 <br />1622 TRINIDAD WAY <br />1622 E Trinidad <br />W ay08/29/23
The URL can be used to link to this page
Your browser does not support the video tag.