My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
521 W Memory Ln - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Memory Ln
>
521 W Memory Ln
>
521 W Memory Ln - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 1:22:48 PM
Creation date
6/6/2025 1:22:14 PM
Metadata
Fields
Template:
Plan
Permit Number
20180070
101115547
101116810
Full Address
521 W Memory Ln
Document Relationships
101115547 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\Memory Ln\521 W Memory Ln
20180070 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\Memory Ln\521 W Memory Ln
Highlight
ID:
1
Creator:
Import Agent
Created:
6/6/2025 1:22 PM
Modified:
5/30/2025 5:28 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Installation Instructions for BW, BWH, <br />BWHH Loadcenter Main Circuit Breakers <br />m Warning <br />DO nOT aTTEMPT TO inSTaLL Or PErFOrM MainTEnanCE <br />On EQUiPMEnT WHiLE iT iS EnErgiZED. SEVErE PErSOnaL <br />inJUrY, DEaTH, Or SUBSTanTiaL PrOPErTY DaMagE MaY <br />rESULT FrOM COnTaCT WiTH EnErgiZED EQUiPMEnT. <br />aLWaYS VEriFY THaT THErE iS nO VOLTagE PrESEnT <br />BEFOrE PrOCEEDing WiTH THE TaSK, anD aLWaYS <br />FOLLOW gEnEraLLY aCCEPTED SaFETY PrOCEDUrES. <br />1.0 KIT CONTENTS: <br /> Quantity Description <br /> 1 Loadcenter Main Breaker <br /> 2 1/4 -20 Nuts <br /> 1 #8–32 self-Threading Screw <br /> 1 Instruction Leaflet <br />2.0 TOOLS REQUIRED <br />• Medium blade screwdriver <br />• 7/16 inch socket <br />• Torque wrench <br />3.0 INSTALLATION <br />A. Before mounting the circuit breaker in an electrical <br />system, make sure there is no voltage present where work <br />is to be performed. The voltage in energized equipment can <br />cause injury or death. <br />B. Make sure that the circuit breaker is suitable for the <br />installation by comparing nameplate data with the system <br />requirements. Inspect the circuit breaker for completeness, <br />and check for damage before mounting. <br />C. Remove outside and inside covers from loadcenter by <br />removing securing screws. <br />D. Position Main Breaker over (2) 1/4-20 studs of interior bus <br />as shown in Figure 2. Secure with (2) 1/4-20 nuts provided. <br />Torque nuts to 48 lb-in. <br />E. Fasten #8-32 base mounting screw through slot between <br />wire terminals into hole in backpan. <br />F. When wiring circuit breaker, follow the breaker label for <br />recommended wire sizes and torque values. <br />m CaUTiOn <br />DO nOT SCraTCH, niCK, Or OTHErWiSE DaMagE BUS BarS. <br />Figure 1. BWH2200 Loadcenter Main Circuit Breaker <br />Figure 2. Installation of Main Breaker Into Loadcenter. <br />8 <br />Installation Leaflet 7803C25H03 Effective May 2014 <br />521 W Memory Ln - <br />201800709/25/2023
The URL can be used to link to this page
Your browser does not support the video tag.