Laserfiche WebLink
REV: B <br />AHJ: CA-CITY OF SANTA ANA <br />33.741744, -117.870012 <br />APN: 39829218 <br />NAME: RICHARD DANG <br />DRAFTED BY: SANCHITA S. <br />ADDRESS: 420 S BROADWAY, SANTA <br />ANA, CA 92701 <br />UTILITY: SCE-SOUTHERN <br />CALIFORNIA EDISON <br />SCALE: AS NOTED <br />PRN NUMBER: ABC-84044 <br />PAPER SIZE: 17"X11"SHEET: CS-02DATE: 05/04/2024 <br />DRAWING INFORMATION <br />CUSTOMER INFORMATION CONTRACTOR INFORMATION <br />QC'ED BY: GANESH. K GENERAL NOTES <br />INSTALLATION NOTES: <br />1. STRUCTURAL ROOF MEMBER LOCATIONS ARE ESTIMATED AND SHOULD BE LOCATED AND VERIFIED BY THE CONTRACTOR WHEN LAG BOLT PENETRATION OR MECHANICAL ATTACHMENT TO THE STRUCTURE IS REQUIRED. <br />2. ROOFTOP PENETRATIONS FOR SOLAR RACKING WILL BE COMPLETED AND SEALED WITH APPROVED SEALANT PER CODE BY A LICENSED CONTRACTOR. <br />3. LAGS MUST HAVE A MINIMUM 2.5" THREAD EMBEDMENT INTO THE STRUCTURAL MEMBER. <br />4. ALL PV RACKING ATTACHMENTS SHALL BE STAGGERED BY ROW BETWEEN THE ROOF FRAMING MEMBERS AS NECESSARY. <br />5. ROOF MOUNTED STANDARD RAIL REQUIRES ONE THERMAL EXPANSION GAP FOR EVERY RUN OF RAIL GREATER THAN 40'. <br />6. ALL CONDUCTORS AND CONDUITS ON THE ROOF SHALL BE MINIMUM 7/8" ABOVE THE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). <br />7. THE PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL OR BUILDING ROOF VENTS. <br />8. ALL SOLAR PANEL ARRAY COMPONENTS SHALL BE INSTALLED PER THE MANUFACTURER'S APPROVED INSTALLATION SPECIFICATIONS. <br />9. THE EXISTING BUILDINGS STRUCTURE SHALL BE VERIFIED AS PROPERLY CONSTRUCTED AND MAINTAINED IN GOOD CONDITION. NO ALLOWANCE HAS BEEN MADE IN THESE DRAWINGS FOR ANY EXISTING DEFICIENCY IN DESIGN, MATERIAL, <br />CONSTRUCTION, OR LACK OF MAINTENANCE FOR THE EXISTING STRUCTURE OR PROPOSED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS, PROPER FIT, AND CLEARANCES IN THE FIELD. <br />10.WATERPROOFING AROUND THE ROOF PENETRATIONS IS THE RESPONSIBILITY OF CONTRACTOR/INSTALLER. <br />11. MISCELLANEOUS ITEMS NOT EXPLICITLY LISTED OR IDENTIFIED IN THESE DRAWINGS HAVE NOT BEEN DESIGNED. IT IS RECOMMENDED THAT MATERIAL OF SUITABLE SIZE STRENGTH TO BE OBTAINED FROM A REPUTABLE MANUFACTURER <br />FOR MISCELLANEOUS ITEMS. <br />12.IF PROJECT IS STAMPED AND SEALED BY AN ILLUMINE-I STRUCTURAL ENGINEER, SEE ASSOCIATED ILLUMINE-I STRUCTURAL REPORT FOR FULL COMPREHENSIVE SCOPE OF STRUCTURAL ENGINEERING INVESTIGATION AND APPROVAL. <br />13. IF ANY CONDITION THROUGHOUT THE ASSOCIATED REPORT OR PERMIT DRAWINGS IS NOT ALSO REPRESENTED ON-SITE, CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD OF ANY DISCREPANCIES AND RECEIVE WRITTEN APPROVAL <br />FROM THE ENGINEER OF RECORD BEFORE PROCEEDING WITH INSTALLATION. <br />14.CONTRACTOR TO PROVIDE MINIMUM 1/4" GAP BETWEEN ALL SOLAR PANELS. <br />Illumine-iStructural Engineer <br />420 S Broadway <br />8/22/2024