Laserfiche WebLink
McPherson Engineering By:J.R. <br />Date:7/25/24 <br />Project Info 3 <br />Gravity Loads 4 <br />Lateral Loads 6 <br />Wind Uplift Design 8 <br />Summary 9 <br />Battery Calc 10 -11 <br />Table Of Contents <br />*Note: This engineering report is limited to the information presented to Engineer via plans, site <br />information, photos, and written correspondence as provided by Client. On-site structural <br />observations and verification of site conditions are not included herein. Engineering for <br />manufactured products such as photovoltaic modules or racking systems is excluded from this <br />report. Please refer to the manufacturer's specifications, certifications, and pre-engineered <br />packages for product engineering. Installations of solar modules and related equipment must be <br />performed in accordance with manufacturer recommendations, local codes, local regulations, <br />industry best practices, and applicable safety standards. Owner and/or Contractor shall notify <br />Engineer should any damage, deterioration, or discrepancies between current condition of the <br />structure or otherwise as this letter describes before proceeding with construction. This letter <br />applies only to regions of the structure where solar modules will be supported and the <br />supporting elements. <br />7/25/2024 5:22 PM <br />2 of 9 <br />©McPherson Engineering <br />2415 N Bonnie <br />Brae9/23/2024