Laserfiche WebLink
McPherson Engineering By:J.R. <br />Date:7/25/24 <br />Gravity Loads: <br />Main Structure DEMAND DECREASED BY 13.46% = OK! <br />Detached Structure DEMAND DECREASED BY 37.78% = OK! <br />Lateral Loads: <br />Main Structure DEMAND INCREASED BY 1.81% < 10% = OK! <br />Detached Structure DEMAND INCREASED BY 5.92% < 10% = OK! <br />Anchorage: <br />DEMAND OF 482.8LB. < CAPACITY OF 656.LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURES ARE ADEQUATE FOR THE PROPOSED PV ARRAYS <br />Summary <br />7/25/2024 5:22 PM <br />9 of 9 <br />©McPherson Engineering <br />2415 N Bonnie <br />Brae9/23/2024