Laserfiche WebLink
TESLA BACKUP <br />GATEWAY 2125A GENERATION PANEL <br />TESLA POWERWALL 2 ABB PVI-3.8-OUTD-US INVERTER ABB PVI-3.8-OUTD-US INVERTER <br />ENPHASE I COMBINER <br />X-I-AM1-240-4C <br />30A <br />ESS DISCONNECT <br />30A <br />AC DISCONNECT <br />TO GENERATION PANEL <br /> FROM ESS <br />DISCONNECT <br />METER MAIN <br />ENGINEERED PLANS COMPLETED BY ENGINEERS IN THE USA <br />VANDERVOORT, DAVID <br />2307 NORTH TOWNER STREET <br />SANTA ANA, CA 92706 <br /> ÀPN/PARCEL NO: 00121406 <br />EXO ENERGY <br />1358 LA MIRADA DRIVE <br />SAN MARCOS, CA 92071 <br />(208) 351-4153 <br />MICHAEL ESPINOZA <br />CSLB: 1063308 <br />1.EUIPMENT SHALL BE A MINIMUM OF 3À X 3À <br />ACCESSIBLE WORKSPACE, FLAT, AND CLEAR OF <br />DEBRIS AND OBSTACLES (TREES, BUSHES, <br />PLANTS, ETC.) <br />2.BATTERIES TO BE SEPARATED BY A MINIMUM 3À <br />BETWEEN EACH UNIT PER UL 9540A REPORT <br />NOTES <br />E-5 <br />DATE:8/9/2024 <br />swyssling@wysslingconsulting.com <br />(201) 874-3483 <br />DESIGN ENGINEER <br />SOLAR COMPANY/CLIENT <br />76 N. MEADOWBROOK DRIVE <br />ALPINE, UTAH 84004 <br />ELEVATION <br />DETAIL <br />SOUTH EXTERIOR ELEVATION DETAIL <br />SCALE: NTS <br />2307 N Towner St <br />8/23/2024