Laserfiche WebLink
FROM <br />PANELBOARD <br />DP-PV2 <br />TO <br />PANELBOARD <br />DP-PV1 <br />TO <br />PANELBOARD <br />DP-PV1 <br />TYP. <br />OUTPUT TYP. <br />INPUTS <br />TO <br />PANELBOARD <br />DP-PV1 <br />8" MIN. <br />1' H x 6' W x 8" D <br />FROM ROOFMETAL WIREWAY, TYP. <br />USE AS NEEDED TO CONSOLIDATE & MANEUVER <br />PV SOURCE CIRCUITS <br />2.5" EMT AC <br />CONDUIT, TYP. <br />TO 250A AC <br />DISCONNECT <br />RSD 3 <br />TYP. <br />INPUTS <br />TYP. <br />OUTPUT <br />8" MIN. <br />1.2" MIN. <br />TYP. <br />INPUTS <br />TYP. <br />OUTPUT <br />1' H x 4' W x 8" D <br />METAL WIREWAY, TYP. <br />USE AS NEEDED TO CONSOLIDATE & <br />MANEUVER PV SOURCE CIRCUITS <br />TO <br />PANELBOARD <br />DP-PV1 <br />TYP. <br />OUTPUT <br />TYP. <br />INPUTS <br />1' H x 3' W x 8" D <br />METAL WIREWAY, TYP. <br />USE AS NEEDED TO CONSOLIDATE & <br />MANEUVER PV SOURCE CIRCUITS <br />TO <br />PANELBOARD <br />DP-PV1TYP. <br />INPUT <br />CUSTOMER <br />DATE: <br />SCALE: <br />SHEET # <br />CUSTOMER <br />E-8.2 <br />APN <br />PLAN SET REVISIONS <br />399-031-24 / 399-031-23 <br />6/8/2023 <br />SAMUELI ACADEMY <br />1901/1919 N. FAIRVIEW ST. <br />SANTA ANA, CA. 92705 <br />CONTRACTOR SIGNATURE: <br />DAVID CLEVELAND <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br /> <br />C <br />L <br />A <br />S <br />S <br /> <br />B <br />CON <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br /> <br />C <br />L <br />A <br />S <br />S <br /> <br />B <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />ENGINEER STAMP <br />PROJECT NUMBER <br />1074220072 <br />C: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />j <br />o <br />d <br />i <br />a <br />z <br />\ <br />A <br />p <br />p <br />D <br />a <br />t <br />a <br />\ <br />L <br />o <br />c <br />a <br />l <br />\ <br />T <br />e <br />m <br />p <br />\ <br />A <br />c <br />P <br />u <br />b <br />l <br />i <br />s <br />h <br />_ <br />2 <br />0 <br />1 <br />2 <br />8 <br />\ <br />S <br />a <br />m <br />u <br />e <br />l <br />i <br /> <br />A <br />c <br />a <br />d <br />e <br />m <br />y <br />_ <br />M <br />A <br />S <br />T <br />E <br />R <br /> <br />P <br />L <br />A <br />N <br /> <br />S <br />E <br />T <br />_ <br />1 <br />0 <br />- <br />2 <br />6 <br />- <br />2 <br />3 <br />. <br />d <br />w <br />g <br /> <br />N <br />o <br />v <br /> <br />0 <br />7 <br />, <br /> <br /> <br />2 <br />0 <br />2 <br />3 <br /> <br />- <br /> <br />3 <br />: <br />5 <br />8 <br />p <br />m <br />EQUIPMENT DETAILS <br />SHEET #2 <br />J.D. 10-27-23 <br />J.M. 10-27-23 <br />B.B. 10-27-23 <br />GENERAL NOTES <br />1. ALL EQUIPMENT TO BE LISTED. <br />2. ALL EQUIPMENT WIRING AND GROUNDING SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDED PRACTICES. REFER TO <br />THE INSTALLATION AND USER MANUALS FOR GUIDANCE. <br />3. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENT, AND ENCLOSURES SHALL BE GROUNDED <br />IN ACCORDANCE WITH CEC ART. 250.134 AND 250.136. CONTRACTOR TO REFER TO MANUFACTURER'S INSTALLATION MANUAL <br />FOR APPROVED METHOD OF GROUNDING. <br />4. INSTALLATION SHALL COMPLY WITH THE 2019 CEC. <br />5. ALL EXPOSED RACEWAY OPENINGS SHALL BE SEALED USING A SUITABLE METHOD TO PREVENT ENTRY OF INSECTS. <br />6. BONDING SHALL BE PROVIDED WHERE NECESSARY TO ENSURE ELECTRICAL CONTINUITY AND THE CAPACITY TO CONDUCT <br />SAFELY ANY FAULT CURRENT IN ACCORDANCE WITH CEC ART. 250. <br />7. MODULES AND RACKING SYSTEM MUST BE PROPERLY GROUNDED PER THE GROUNDING METHOD PROVIDED IN THE RACKING <br />MANUFACTURER'S INSTALLATION MANUAL. IF NO METHOD IS STIPULATED, AN ILSCO GBL-4DBT OR EQUIVALENT GROUNDING <br />LUG PER DETAIL GD SHOULD BE USED TO GROUND EACH MODULE AND RAIL OR PURLIN WITH THE APPROPRIATELY SIZED <br />GROUND WIRE AND TORQUE SPECIFICATION PER THE TABLE IN THE DETAIL. <br />8. SEE SECTION 3 OF SPECIFICATIONS ON E-1 FOR CONDUIT TYPES AND USES, AS WELL AS WHEN EXPANSION JOINTS ARE <br />REQUIRED. <br />9. ALL EQUIPMENT REQUIRES ATTACHMENT DETAILS PER MANUFACTURER'S INSTRUCTIONS; EQUIPMENT THAT IS 400 LBS OR <br />MORE REQUIRE STRUCTURAL CALCULATIONS OF THE ATTACHMENTS. <br />10. WORKING CLEARANCES FOR ALL NEW ELECTRICAL EQUIPMENT SHALL BE PER CEC ART. 110.26(A) AND 110.34(A). CONTRACTOR <br />SHALL MAINTAIN WORKING AND MAINTENANCE CLEARANCES FOR EXISTING EQUIPMENT. <br />11. SWITCHES OR CIRCUIT BREAKERS USED AS SWITCHES SHALL BE INSTALLED SUCH THAT THE CENTER OF THE GRIP OF THE <br />OPERATING HANDLE, WHEN IN ITS HIGHEST POSITION, IS NOT MORE THAN 6 FEET 7 INCHES ABOVE THE FLOOR OR WORKING <br />PLATFORM PER CEC ART. 404.8(A). <br />12. CONTRACTOR TO CONSULT INSTALLATION MANUALS OF NEW EQUIPMENT FOR PROPER MOUNTING METHODS AND <br />CLEARANCES. <br />13. EXACT CONDUIT ROUTE TBD BY CONTRACTOR. <br />14. CONDUITS AND FITTINGS VISIBLE TO THE PUBLIC SHALL BE PAINTED TO MATCH THE EXISTING BUILDING IF REQUIRED BY THE <br />JURISDICTION OR OWNER. <br />N.T.S. <br /> NEW EQUIPMENT & EXISTING EQUIPMENT <br />IN ELECTRICAL BUILDING A <br /> NEW EQUIPMENT LOCATED IN ELECTRICAL ROOM BUILDING E5SCALE: N.T.S <br /> NEW EQUIPMENT & EXISTING EQUIPMENT IN <br />ELECTRICAL BUILDING B3 SCALE: N.T.S NEW EQUIPMENT & EXISTING EQUIPMENT IN <br />ELECTRICAL BUILDING C4 SCALE: N.T.S <br />ELECTRICAL ROOM <br />ELECTRICAL <br />ROOM <br />ELECTRICAL <br />CLOSET <br />TELE/ <br />CABLE <br />SCALE: N.T.S. <br />SCALE: N.T.S. NEW EQUIPMENT LOCATED ON ROOF BUILDING E 6 <br /> NEW EQUIPMENT LOCATED INGYM STORAGE ROOM BUILDING F2SCALE: N.T.S.1 <br />(N) 125A AC DISCONNECT <br />RSD 2 <br />(N) INVERTER #8 SE80K <br />(N) INVERTER #7 SE40K US <br />(N) 70A AC DISCONNECT - RSD 5 <br />(N) 250A AC DISCONNECT RSD-3 <br />(N) 70A AC DISCONNECT - RSD 1 <br />(N) INVERTER #10 SE40K <br />(N) 30A DC DISCONNECT - RSD 2 <br />(N) INVERTER #9 SE100K <br />(N) PANEL BOARD DP-PV-2 <br />ELECTRICAL ROOM <br />(N) INVERTER #11 SE40K 1901 N Fairview St & Bldg A, B, <br />C, F & 1919 N Fairview St Bldg E <br />4/11/2024